Site Test Report

Contract No. – N-6166.1


New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV
ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108116125
Contractor: CSE Equipment: 7SJ611 MV SBEF
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F514
Substation: 132/11 kV SS at ADNEC Page: 1 of 4

Inspection, Testing and Secondary Injection of


SBEF Protection Relay 7SJ611
A - General Data:

Ordered MLFB: 7SJ6111-5EB90-1FA0 --0S Serial no.: BF11086125

Built-in MLFB: 7SJ6111-5EB90-1FA0 --0S Firmware version: V4.81

Built-in rated auxiliary voltage (DC): 110 -250 VDC Feeder : =E05 - Transformer T202

Built-in rated voltage VN: NA Software used: Digsi 4 V4.84

Built-in rated current IN: 1A Frequency: 50 HZ

Relay Designation : -F514 MV SBEF Protection

B - General Inspection & Testing:

S NO General inspection & testing: Checked

1 Visual inspection of unit OK

2 Installation & wiring correct to relevant drawings OK

3 Relay case connected to local earth bar OK

4 Measured value check OK

5 Relay CT shorting contacts proved OK

6 Relay Binary inputs and outputs checked OK

7 Watch dog contact checked OK

8 Injection of current from terminal block with test plug OK

C - Configuration of protection function

Functions
Enabled Disabled
IEC No. Description
Description
50N/51N Earth fault Protection Enabled

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name
Date 23.08.2012 Date 23.08.2012 Date
CSE ENERGO CONSULT TRANSCO
\N6166_E05_F514_MV_SBEF_Relay_7SJ61.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV
ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108116125
Contractor: CSE Equipment: 7SJ611 MV SBEF
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F514
Substation: 132/11 kV SS at ADNEC Page: 2 of 4

D - Binary input function check

Bin. input Function Terminal Terminal Drawing Checked Remarks


(+)-X331:5
Relay Page No.
(-)-X331:18
BI 1 Spare F14-F16 -X331:43 /MAA3.2
BI 2 Spare F15-F16 -X331:44 /MAA3.3
BI 3 Test Mode F17-F18 -X331:45 /MAA3.3 Test plug inserted
BI 4 Spare R9-R7 -X331:46 /MAA3.4
BI 5 Spare R10-R7 -X331:47 /MAA3.4
BI 6 Spare R11-R13 -X331:49 /MAA3.5
BI 7 Spare R12-R13 -X331:50 /MAA3.6
BI 8 Spare R8-R7 -X331:48 /MAA3.5

E - Binary output check

Output Function Terminal Drawing Checked Remarks


Relay TB Page No.
BO1 EF Trip F6-F7 X514:2 NAA1.3 Trip to TC1
BO2 EF Trip F8-F9 X514:4-8 NEA1.4 Trip to MV1
BO3 EF Trip F10-F11 X514:6 MBA1.4 Start BF protection
BO4 EF Trip F12-F13 X514:12 NAA3.7 Trip to LOR 1
BO5 EF Trip R1-R3 X514:10 RC3.4 Signal to FMS
BO6 Spare R2-R3 - ZA4.3 -
BO7 EF Trip R4-R5 - RAA2.5 Cubicle alarm
BO8 Pick-up R6-R5 - ZA4.3 For testing only
Live Cont. F3-F4-F5 - RAA2.5 Cubicle alarm

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name
Date 23.08.2012 Date 23.08.2012 Date
CSE ENERGO CONSULT TRANSCO
\N6166_E05_F514_MV_SBEF_Relay_7SJ61.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV
ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108116125
Contractor: CSE Equipment: 7SJ611 MV SBEF
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F514
Substation: 132/11 kV SS at ADNEC Page: 3 of 4

F - LED function

S no Led no Function Checked Remarks


1 LED 1 Trip / relay trip
2 LED 2 Pickup / relay pickup
3 LED 3 SBEF IEp Trip / 51N
4 LED 4 SBEF IE>,IE>> Trip / 50N
5 LED 5 Spare / not used
6 LED 6 Spare / not used
7 LED 7 Summary Alarm / summary alarm event

1. MEASURED VALUE TEST:

Inject current in the relay as per the table below. Observe the reading on the relay display, in secondary values and in
Primary values. Inject Current through the test switch -X510

CT RATIO: 2500/1 A

Primary Current read on relay Secondary Current read on relay


Current display In (A) Display in (A)
Phase
injected
injected
(Amps)
IR IY IB IN IR IY IB IN

N 1.0 2.49 kA 1.00

2.1 Earth Fault function (DMT):50N-1


Pick up
Relay setting Drop off Operating time @2
Test phase Current Time setting (Sec)
IE > (A) Current (A) Times of Iset (Sec)
(A)
E/F 0.50 * * 1.0 *

* Note: Refer attached OMICRON Print out for Test results

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name
Date 23.08.2012 Date 23.08.2012 Date
CSE ENERGO CONSULT TRANSCO
\N6166_E05_F514_MV_SBEF_Relay_7SJ61.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV
ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108116125
Contractor: CSE Equipment: 7SJ611 MV SBEF
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F514
Substation: 132/11 kV SS at ADNEC Page: 4 of 4

2.2 Earth Fault function (DMT):50N-2


Pick up
Relay setting Drop off Operating time @2
Test phase Current Time setting (Sec)
IE >> (A) Current (A) Times of Iset (Sec)
(A)
E/F 1.0 * * 0.50 *
* Note: Refer attached OMICRON Print out for Test results

2.3 Earth Fault function (IDMT- Normal inverse curve ): 51N 0.14
T= .TP [s]
0.02
[(I/IP) - 1]

Operating time at current setting [Sec]


Test Relay Time
P/U D/O
element setting multiplier 2*IEP 5*IEP 10*IEP
[A] [A]
IEp [A] Tp
Act Cal Act Cal Act Cal

E/F 0.20 * * 0.50 * 5.015 * 2.140 * 1.485

* Note: Refer attached OMICRON Print out for Test results

Instruments Used

Equip. 1 Equip. 2 Equip. 3


Instrument: CMC256-6

Serial No.: JG697S

Calibration Date: 30.05.2012

Remark :
- Omicron print outs will be attached along with the test report for Pickup/Drop off & Characteristics

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name
Date 23.08.2012 Date 23.08.2012 Date
CSE ENERGO CONSULT TRANSCO
\N6166_E05_F514_MV_SBEF_Relay_7SJ61.doc
SITE TEST REPORT
Contract No. N6166.1 CONSORTIUM
SIEMENS-
New 132/11 kV Substations at E12, Zayed Sports City, ADNEC Capital
ELECTROMECHANICAL
Centre, 132/22kV Substations at Ne w Airport and Capital District and
all related 132kV cable works
Station: 132/11 kV ADNEC Bay: =E05 Panel: +R1 Device: -F514 7SJ611 - MV SBEF

SITE TEST REPORT


TRANSFORMER MV SBEF PROTECTION
7SJ611

Company: Siemens
Test Person: Josip Spolador

Testmodules Checked: 9
Testmodules Passed: 9

Scope of created test document (Applications/Functions):


51N IEp - pickup test
51N IEp - operating characteristic test (NI)

50N IE>,IE>> - pickup test


50N IE>,IE>> - tripping time test (DT)

Trip Contacts Test

Test Object - Device Settings

Substation/Bay:
Substation: 132/11 kV SS ADNEC Substation address:
Bay: 40MVA Transformer 2 Bay address: =E05-T202

Device:
Name/description: MV SBEF 7SJ61 Manufacturer: SIEMENS
Device type: 7SJ6111-5EB90-1FA0 Device address: =E05+R1-F514
Serial/model number: BF1108116125
Additional info 1: MV Winding SBEF Relay
Additional info 2:

Hardware Configuration

Test Equipment
Type Serial Number
CMC256-6 JG655S

Hardware Check
Performed At Result Details
23/08/2012 10:48:48 Passed

Tested by Witnessed by Witnessed/Approved. by


Name: Josip Spolador C. Senthil Kumar
Date: 23.08.2012 23.08.2012
Signature:
CSE ENERGO CONSULT TRANSCO
N6166_E05_R01_F514_MV_SBEF_7SJ61.occ Page 1 of 5
SITE TEST REPORT
Contract No. N6166.1 CONSORTIUM
SIEMENS-
New 132/11 kV Substations at E12, Zayed Sports City, ADNEC Capital
ELECTROMECHANICAL
Centre, 132/22kV Substations at Ne w Airport and Capital District and
all related 132kV cable works
Station: 132/11 kV ADNEC Bay: =E05 Panel: +R1 Device: -F514 7SJ611 - MV SBEF

Test set connections


Instruction Text:
Test switch in test position

IE:
Current output 1 ---> -X514: 26,28

Omicron - Binary Inputs


BI 1 -> Trip TC1 -X514:1,2; (BO1) -X321:1-8
BI 2 -> Trip LOR1 -X514:11,12; (BO4) -X (110V=)
BI 3 -> Start BF -X514:19,20; (BO3) -X330:1-2
BI 4 -> Trip MV1 -S514:3,4-7,8 (BO2) -X321:23-25

BI 10 ->Start (pick-up) BO8:R6 (110VDC)

Tested by Witnessed by Witnessed/Approved. by


Name: Josip Spolador C. Senthil Kumar
Date: 23.08.2012 23.08.2012
Signature:
CSE ENERGO CONSULT TRANSCO
N6166_E05_R01_F514_MV_SBEF_7SJ61.occ Page 2 of 5
SITE TEST REPORT
Contract No. N6166.1 CONSORTIUM
SIEMENS-
New 132/11 kV Substations at E12, Zayed Sports City, ADNEC Capital
ELECTROMECHANICAL
Centre, 132/22kV Substations at Ne w Airport and Capital District and
all related 132kV cable works
Station: 132/11 kV ADNEC Bay: =E05 Panel: +R1 Device: -F514 7SJ611 - MV SBEF

50N SBEF DMT


Mode selection:
Information or instruction

Instruction Text:
Disable IDMT , and enable 50N-1 DMT

50N-1 SBEF I> Pickup:


Measurement Results
Name/ Exec. Ramp Condition Sig Nom. Act. Tol.- Tol.+ Dev. Assess Tact
Pick-up State 1 Start 0->1 I E 500.0 mA 499.0 mA 15.00 mA 15.00 mA -1.000 mA + 36.90 ms
Drop-off State 2 Start 1->0 I E 475.0 mA 468.0 mA 15.00 mA 15.00 mA -7.000 mA + 62.00 ms
Assess: + .. Passed x .. Failed o .. Not assessed

50N-1 SBEF I> Trip time:


Time Assessment
Name Ignore before Start Stop Tnom Tdev- Tdev+ Tact Tdev Assess
t I> 1A 1A Trip TC1 0>1 1.000 s 50.00 ms 50.00 ms 1.020 s 19.70 ms +
Assess: + .. Passed x .. Failed o .. Not assessed

50N-2 SBEF I>> Pickup:


Measurement Results
Name/ Exec. Ramp Condition Sig Nom. Act. Tol.- Tol.+ Dev. Assess Tact
Pick-up State 1 Start 0->1 I E 1.000 A 998.0 mA 30.00 mA 30.00 mA -2.000 mA + 41.50 ms
Drop-off State 2 Start 1->0 I E 950.0 mA 950.0 mA 30.00 mA 30.00 mA 0.000 A + 25.00 ms
Assess: + .. Passed x .. Failed o .. Not assessed

50N-2 SBEF I>> Trip time:


Time Assessment
Name Ignore before Start Stop Tnom Tdev- Tdev+ Tact Tdev Assess
t I>> 2A 2A Trip TC1 0>1 500.0 ms 50.00 ms 50.00 ms 518.6 ms 18.60 ms +
Assess: + .. Passed x .. Failed o .. Not assessed

Tested by Witnessed by Witnessed/Approved. by


Name: Josip Spolador C. Senthil Kumar
Date: 23.08.2012 23.08.2012
Signature:
CSE ENERGO CONSULT TRANSCO
N6166_E05_R01_F514_MV_SBEF_7SJ61.occ Page 3 of 5
SITE TEST REPORT
Contract No. N6166.1 CONSORTIUM
SIEMENS-
New 132/11 kV Substations at E12, Zayed Sports City, ADNEC Capital
ELECTROMECHANICAL
Centre, 132/22kV Substations at Ne w Airport and Capital District and
all related 132kV cable works
Station: 132/11 kV ADNEC Bay: =E05 Panel: +R1 Device: -F514 7SJ611 - MV SBEF

51N SBEF IDMT


Mode selection:
Information or instruction

Instruction Text:
Disable DMT , and enable 51N IDMT

51N SBEF IDMT_Pickup:


Measurement Results
Name/ Exec. Ramp Condition Sig Nom. Act. Tol.- Tol.+ Dev. Assess Tact
Pick-up State 1 Start 0->1 I E 220.0 mA 219.0 mA 10.00 mA 10.00 mA -1.000 mA + 40.90 ms
Drop-off State 2 Start 1->0 I E 209.0 mA 205.0 mA 10.00 mA 10.00 mA -4.000 mA + 4.700 ms
Assess: + .. Passed x .. Failed o .. Not assessed

51N SBEF IDMT_IEC Normal Inverse:


Shot Test Results:
Type Relative To Factor Magnitude Angle tnom tact Overload Result
L1-E IEp 1.500 0.30 In n/a 8.60 s 8.79 s No Passed
L1-E IEp 2.000 0.40 In n/a 5.01 s 5.06 s No Passed
L1-E IEp 3.000 0.60 In n/a 3.15 s 3.16 s No Passed
L1-E IEp 5.000 1.00 In n/a 2.14 s 2.14 s No Passed
L1-E IEp 7.000 1.40 In n/a 1.76 s 1.76 s No Passed
L1-E IEp 10.000 2.00 In n/a 1.49 s 1.48 s No Passed

Pick-up / Drop-off Test Results:


I Pick-up I Drop-off Reset Ratio
Type Angle Result
nom act act nom act Error
L1-E n/a 0.20 In 0.22 In 0.20 In 0.95 0.91 -4.31 % Passed

Charts for Fault Types:


Type Angle
L1-E n/a

10000.0

1000.0

100.0
t/s

10.0

1.0

0.10 0.20 0.30 0.50 0.70 1.00 2.00 3.00


In

Tested by Witnessed by Witnessed/Approved. by


Name: Josip Spolador C. Senthil Kumar
Date: 23.08.2012 23.08.2012
Signature:
CSE ENERGO CONSULT TRANSCO
N6166_E05_R01_F514_MV_SBEF_7SJ61.occ Page 4 of 5
SITE TEST REPORT
Contract No. N6166.1 CONSORTIUM
SIEMENS-
New 132/11 kV Substations at E12, Zayed Sports City, ADNEC Capital
ELECTROMECHANICAL
Centre, 132/22kV Substations at Ne w Airport and Capital District and
all related 132kV cable works
Station: 132/11 kV ADNEC Bay: =E05 Panel: +R1 Device: -F514 7SJ611 - MV SBEF

Trip outputs time test


Contacts Trip time IEp:
Time Assessment
Name Ignore before Start Stop Tnom Tdev- Tdev+ Tact Tdev Assess
1_t Ip> 0.4A 0.4A Trip TC1 0>1 5.015 s 250.0 ms 250.0 ms 5.054 s 39.30 ms +
2_t Ip> 0.4A 0.4A Trip LOR1 0>1 5.015 s 250.0 ms 250.0 ms 5.055 s 40.10 ms +
3_t Ip> 0.4A 0.4A Start BF 0>1 5.015 s 250.0 ms 250.0 ms 5.055 s 40.40 ms +
4_t Ip> 0.4A 0.4A Trip MV1 0>1 5.015 s 250.0 ms 250.0 ms 5.055 s 39.70 ms +
Assess: + .. Passed x .. Failed o .. Not assessed

Contacts Trip time IE>:


Time Assessment
Name Ignore before Start Stop Tnom Tdev- Tdev+ Tact Tdev Assess
1_t I> 0.7A 0.7A Trip TC1 0>1 1.000 s 100.0 ms 100.0 ms 1.027 s 26.50 ms +
2_t I> 0.7A 0.7A Trip LOR1 0>1 1.000 s 100.0 ms 100.0 ms 1.027 s 27.40 ms +
3_t I> 0.7A 0.7A Start BF 0>1 1.000 s 100.0 ms 100.0 ms 1.027 s 27.40 ms +
4_t I> 0.7A 0.7A Trip MV1 0>1 1.000 s 100.0 ms 100.0 ms 1.027 s 26.80 ms +
Assess: + .. Passed x .. Failed o .. Not assessed

Contacts Trip time IE>>:


Time Assessment
Name Ignore before Start Stop Tnom Tdev- Tdev+ Tact Tdev Assess
1_t I>> 1.3A 1.3A Trip TC1 0>1 500.0 ms 50.00 ms 50.00 ms 533.7 ms 33.70 ms +
2_t I>> 1.3A 1.3A Trip LOR1 0>1 500.0 ms 50.00 ms 50.00 ms 534.6 ms 34.60 ms +
3_t I>> 1.3A 1.3A Start BF 0>1 500.0 ms 50.00 ms 50.00 ms 535.0 ms 35.00 ms +
4_t I>> 1.3A 1.3A Trip MV1 0>1 500.0 ms 50.00 ms 50.00 ms 534.0 ms 34.00 ms +
Assess: + .. Passed x .. Failed o .. Not assessed

51N SBEF
Mode selection:
Information or instruction

Instruction Text:
Settings: IEp>=0.2A; T-IEp=0.5; IEC Normal Inverse
IE>=0.5A; T-IE>=1.0; DT
IE>>=1A; T-IE>>=0.5; DT

End of Test

Tested by Witnessed by Witnessed/Approved. by


Name: Josip Spolador C. Senthil Kumar
Date: 23.08.2012 23.08.2012
Signature:
CSE ENERGO CONSULT TRANSCO
N6166_E05_R01_F514_MV_SBEF_7SJ61.occ Page 5 of 5