Hazard Identification & Risk Assessment (HIRA) Register


Name of the Job Site: Hyderabad Date: 09/04/2021
Activity: Operation of Portable tools Ref. No: HIRA_NARSI_17_029-R0

Severity
No medical treatment or
Illness requiring Medical Illness requiring hospital Illness in permanent
measurable physical Fatality
Treatment admission impairment
effects
Injury requiring Medical
Serious Injury requiring
First aid treatment only Treatment but not Lost Lost Time Accident Single or multiple Fatality
hospitalization
Time

Likelihood 1 2 3 4 5

Most Unlikely Never heard of in construction industry. 1    Low      


Known to occur in the other ICs &
Unlikely
construction industry
2      
Likely Incident occurred in our IC. 3     Medium  
Most Likely Happens several times per year in our IC 4       High
Inevitable Happens several times per year in a site. 5          

Job Sequence: Assessment Team:


Operation of portable hand tools 1. Head – Operations

2. Construction Manager (Activity In-charge)


List of Type of Workmen, Materials / Tools / Tackles / Equipment etc., involved in
the activity: 3. Site Engineer
Hand tools, Operator,
4. EHSO/M

Pre-Requisite for the job / Activities / Sub-Activities If any:


Safe to star card, PEP Talk
Probability Rating

Severity Rating

Residual Risk
Sl Additiona
Sub Hazard Possible Populatio Risk
N Hazard Existing Control Measure l Control Action By
activity Event Outcom n at risk* Level
o Measures
e

Operatio 1. Deploy only trained


n of Operator, personal for operating power List of the
Major
Portable Unauthorize Unauthorize people near tools. authorized
injury,
1 tools d operation d operation to the 2. A proper system to be 2*4=8(M) persons 2*4=8 (M)
property
working implemented so that the tools
2 4
should be P&M
damages.
area shall not be issued to any un- displayed.
authorized persons.
1. Provided Distribution
boards as per the required
rated voltage with ELCB
devices.
2. Monthly inspection of
power tools with inspection
Shock, stickers.
Burn 3. Training and supervision 1.
Contact with
2 Electricity injury, Operator ensured. GROUND
electricity
Fatality. 4. Physical inspection on daily or double PM/
basis by electrician before insulate all Planning/
3 5 3*5=(H) 3*5= (H) P&M
giving supply. the power
5. Ensure the plug top tools.
connections nearer to the
user (within 2 mt. radius).
6. Proper maintenance by
P&M.
3 3 3*4=12(M Planning /Site
Operator Provide proper and adequate ) Use 3*4=12(M Engineer
Working at Fall from Fatality, working platform when 4 ladders )
height height Major portable power tools is only for
injury operated at heights. short period
jobs & a
person
should hold
the ladder.

Operator,
Inhalation of Inhalation of Lung people near
4 Dust Dust disorders to the Use mask to avoid dust
3 2 3*2=6(L)
working inhalation.
area
Ensure adequate workspace
Poor Adapting Back for the job to be performed.
Shift
ergonomics poor posture Pain, Use work bench with proper
rotation and
muscle vice.
5 cramp Operator Provided mechanical
3 2 3*2=6(L) extension
3*2=6 (L)
of interval PM/Planning/
equipment for shifting and Admin
time
lifting of heavy objects

Ensure all the rotating parts In addition


Rotating Contact with Fatality, are guarded to goggles
Parts rotating Major Operator, face visor
parts injury people near shall be
6 to the
4 4
4*4=16(H used to 4*4=16(H PM/Planning/P&M
working ) avoid flying )
area particles
hitting the
face.

_______________________________
Project Director/ Project Manager / Section In-charge EHSO