Safe Work Method Statement

Project Name: Google Connect Services India Private Limited.

Address: Hyderabad

Company Name: Narsi & Associates Activity/Trade: Wall demolition

Address: UNIT NO.522, LAXMI MALL, BLDG. 5, LAXMI IND. EST., Link Rd,
Laxmi Industrial Estate, Suresh Nagar, Andheri West, Mumbai, Maharashtra 400053

Person
Procedure (in steps) Possible Hazards Risk Control Measures
who will
(Break the job down into steps. Each (Identify the hazards associated with each Rating (Describe what action or procedure will be taken to eliminate or
minimise the risk of injury or damage. Use the Hierarchy of ensure this
step should accomplish some major step. Examine each to find possibilities that (See
Controls below as a guide happens
task and be in logical sequence.) could lead to an accident or potential harm below)
arising.) 1. Eliminate the Hazard
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
 Mobilization of Manpower  Unskilled worker L  All personnel who will enter the site should always have
 Entry of Unauthorized person gate pass.
 Not Familiar with the site hazard and  Pre-medical Test/Fitness Test of workers must be done by
Requirement a MBBS doctors. PM/site
 Do not aware of welfare facilities.  Safety Induction training should be given to all the worker. supervisor
 Unaware of procedure in emergency.  Mandatory PPE's to be provided like Safety helmet, safety /safety
shoes, Reflective jacket, Nose mask, Safety goggles etc. officer
 Mobilization of Hand/Machine  Damaged Hand tools M  Avoid Damaged Hand tools for use. PM/site
tools  Uninspected Hand tools  Inspection of all the tools should be done before entry at supervisor
site and record to be maintained.
 Only Inspected/certified hand tools should be used at the
/safety
site officer
 Standard/Good quality of tools to be used.
 Material Unloading and  Ergonomics M  Ensure Proper Job Specific Training Before start the work
Loading and Shifting  Fall of Person activity. PM/site
 Fall of Materials  Work Permit systems to be followed supervisor
 Slippery & uneven access  Ensure Proper Vehicle documents like ( Driver License, /safety
Excessive Weight PUC ,Insurance, Fitness, RC, etc.) to be done before enter
 Deployment of Untrained Person the site. officer
 Failure of vehicle wheel breaks  Access to be cleared from any kinds of obstructions.
 Obstructions in the passages  Ensure Proper Material stacking and Shifting
 Sharp edges  Only Skill person to be allowed for work activity
 Ensure proper illumination.
 Vehicle speed limit should be under 15km/h.
 Ensure Work area to be Barricaded with safety cone.
 Vehicle checklist to be filled before entry at site and should
be in good conditions.
 Ensure Proper use of PPE’S Like (Helmet, Jacket, Safety
shoes, Shoulder pad, Nose mask ,etc.)

 Marking  Dust Fumes L  Job specific training to be done before start the work PM/site
 Environmental activity supervisor
 Mandatory PPE’s to be provided like (Helmet, Reflective
jacket, Safety shoe’s, Nose mask etc.) /safety
officer
 Wall Demolization  Deployment of Untrained persons M  Job specific training to be given before start the work PM/site
 Sharp edge of tools activity supervisor
 Slip and Trip Hazards  Daily Tools box talk training should be done.
 Electrocution  Only skilled person to be allowed for work.
/safety
 Noise hazards  Unauthorized person should not be allowed. officer
 Ergonomic Hazards  Work permit and clearance must be taken by Client/PMC.
 Hit by object  All the electrical power tools should be certified with
 Flying parts of demolization competent person.
 Dust hazards  ELCB/RCCB to be checked by competent person and use
 Poor illumination power supply from the DB with 30mA ELCB or RCCB.
 Collapse of wall  Double Insulated Cables to be used along with industrial
plug top and should be in good condition.
 All the electricals cables should be through from overhead.
 Inspection tags system to be followed
 Work area should be barricaded and safety signage to be
placed.
 Ensure proper illumination should be available at work
location at all the time.
 Ensure work area proper Barrication with safety signages
 Fire Extinguisher Should be near work area
 Mandatory PPE's to be provided like Safety helmet, safety
shoes, Reflective jacket, Nose mask, Safety goggles etc.
 Wall demonization work  Fall of material H  Ensure Proper Job specific & Tools box talk training before PM/site
using Mobile Scaffold  Fall of Person start the work activity supervisor
 Slip and trip hazards  Work permit systems to be followed
/safety
 Collapse of scaffold  Only Skill person allowed for height work
officer
 Loss Of materials  Ensure Scaffold Inspected by competent Person
 No overloaded to be allowed
 Scaffold tags system to be followed
 Safety Belt to be use more than 1.8 mtrs
 Ensure Surface clean and even for scaffold work
 Ensure area to be barrication with Safety Signage’s
 Mandatory PPE's to be provided like Safety helmet, safety
shoes, Reflective jacket, Nose mask, Safety goggles etc.
 Housekeeping  Slip and trip hazards M  Scrap to be removed to dedicated scrap yard PM/site
 Exposer to dust/Fumes  Ensure Waste is always filled up either in stable box. supervisor
 Cut Injury  Ensure work area to be barricartion with safety signages’ /safety
 Mandatory PPE's to be provided like Safety helmet, safety officer
shoes, Reflective jacket, Nose mask, Safety goggles etc.
 Covid- 19  Viral hazards H  Ensure Social distance maintain. PM/site
 Fever,  Thermal Screening checked by Security before entering the supervisor
 Pain site.
 Headache  Nose mask Mandatory /safety
 Cough  Regular hand wash and santazations officer
 Shortness of breathing
 Weakness.

Supervisor’s Responsibilities
Supervisor’s Responsibilities:  Organize sites so that work is carried out to the required standard with the minimum risk to men, machinery &
materials.

 Make sure that suitable protective clothing is available, where appropriate and that is used.

 Give all workmen / technicians precise instructions on their responsibilities for correct working method; see that
they do not require taking unnecessary risk.

DESCRIPTION OF TRAINING THAT HAS BEEN GIVEN TO PEOPLE INVOLVED WITH THE WORK