You are on page 1of 8

25/10/22

2840267

GREEN BUILDING GENERAL NOTES


389820-1-2

NOTES:-

10.Credit 403.01: Acoustical Control: The acoustic performance relating to 21.Credit 502.04: The average Lighting Power Density for the interi
or 29. Credit 601.01: A:Water-conserving fixtures must be installed 34.Credit 701.01: Thermal and Acoustic Insulation Materials: Insulation
1. All project requirements must comply with Dubai Green Building
Internal Noise Criteria from External Noise Sources. Internal Noise connected lighting load for specific building types must be no more meeting the following criteria : materials to be incorporated into the building must:
Regulations and Specifications 1.
THISDRAWNGEPOYFLCU.BX:4306,M

Criteria from Mechanical Services Noise, Internal Airborne Sound than the watts per square metre of gross floor area given in Table
2. All materials and equipment used to comply with Dubai Green Building Insulation Guidance Values, and Internal Impact Sound Pressure Levels 502.04 (1) of Dubai Green Building Regulations and Specifications. 1. Be manufactured without the use of Chlorofluorocarbons (CFC's).
Fixture Type Maximu Flow Rate
Regulations and Specifications must be certified / accredited by Dubai meet the control requirements set out in Table 403.01(1) of Dubai Green 2. Be non-toxic and not release toxic fumes during combustion.
Showerhead 8 Liters Per Minute
Municipality. Building Regulations and Specifications. 22.Credit 502.05: The average Lighting Power Density for the exterior 3. Have 0.05 parts per million (ppm) or less of added formaldehyde.
Hand wash basin 6 Liters Per Minute
connected lighting load for specific building types must be no more 4. Have a threshold limit value (TLV) OF 0.1 or less of individual
Kitchen sink 7 Lliters per minute
3. All specialized companies required to verify any requirement for the Dubai 11.Credit 404.01: All paints and coatings used in the building should not than the watts per square metre of gross floor area given in Table Volatile Organic Compound (VOC).
Dual Flush Toilet 6 Liters Full flush, 3 Liters
Green Building Regulations and Specifications must be approved by exceed the allowed limits of Volatile Organic Compound (VOC), these 5. Be a fire resistant in accordance with the requirements of Dubai
502.05 (1) of Dubai Green Building Regulations and Specifications. Part flush
Dubai Municipality paints and coatings must be accredited / certified from Dubai Central Lab Civil Defence.
or any source approved by DM. Urina 1 Liter per flush or waterless 6 . Be accredited / certified from Dubai Central Lab. 2.
THISDRAWNGOBECL.MY

23.Credit 502.06: Lighting Controls : For all new buildings other than
4. Credit 303.01: All permanently installed exterior lighting must comply with 7 . Achieve all the requirements of the approved specifications by DM.
the following: villas and industrial buildings: B. Dual Flush toilets must be used.
12.Credit 404.02: All adhesives, adhesive bonding primers, adhesive 15-09-2022
A. all exterior light fixtures on the building site, other than architectural primers, sealants and sealant primers used in the building should not C. Automatic (proximity detection) / push button faucets must be All thermal and acoustical insulation must be installed as per the
accent lighting and civil aviation safety lighting, must be shielded so A.Occupant Lighting Controls must be provided so as to allow lighting installed in all public facilities.
exceed the allowed limits of Volatile Organic Compound (VOC). These manufacturer's instructions after approval from DM.
that all of the light emitted by the fixture, either directly or indirectly by to be switched off when daylight levels are adequate or when
3.

materials must be accredited / certified from Dubai Central Lab or any ANYDISCREPTOBUGHFLVMWK.
reflection or refraction from any part of the fixture, is projected below spaces are unoccupied and to allow occupants control over lighting
source approved by DM. D. Cisterns serving single or multiple urinals in public, commercial, 35.Credit 701.02: Certified / Accredited Timber: At least twenty five (25%) by
the horizontal plane passing through the lowest part of the fixture; levels. and industrial buildings must be fitted with manual or automatic volume of the timber and timber-based products used during construction
B. Architectural accent lighting must be aimed or shielded to prevent the
13.Credit 404.03: Each new carpet system used in public and commercial flush controls that are responsive to usage patterns. Only sanitary and permanently installed in the building must be from certified /
lighting of the night sky. wall washing lights must spill no more than
buildings must be certified / accredited from Dubai Central Lab or any B. Common areas which are not regularly occupied, such as corridors flushing is acceptable during building closure or shutdow accredited sources approved by DM.
10% of the lighting past the building facade;
other source approved by DM. Carpets are not allowed to be used in and lobbies, should reduce lighting levels to no more than twenty (including overnight); and
C. Downward directed lighting must be used for lighting of signage; and
labour accommodation, educational facilities or any other determined by five percent (25%) of normal when unoccupied. 36.Credit 701.03: Asbestos Containing Materials: The maintenance, addition
D.All exterior lighting must be fitted with automatic controls to ensure that
lights do not operate during daylight hours DM. E. Faucets installed as a component of a specialized application or alteration of existing buildings, materials containing asbestos must not
DIRECTON:
C. In offices and education facilities all lighting zones must be fitted be used in buildings.
may be exempt from the flow rates upon application to Dubai
5. Credit 305.01: The project must comply with all related regulations, local 14.Credit 406.01: Legionella Bacteria and Building Water Systems: The DM with occupant sensor controls capable of switching the electrical Municipality.
orders and their executive orders, technical guidelines and guides applied technical guidelines shall be applied as follows: lights on and off, according to occupancy unless lighting is required 37.Credit 701.04: Lead or Heavy Metals Containing Materials: The
in the emirate and the following is required: for safety purposes. maintenance, addition or alteration of existing buildings, paints, or other
30. Credit 601.02 Condensate Drainage : All points where condensate is
A. Neither the construction activity nor the operation of the building may A. All water systems and networks which creates a water spray or aerosol materials containing lead or other heavy metals with percentage more
produced by the operation of air conditioning equipment, there must
cause land disturbances, surface runoff, soil erosion or sedimentation including but not limited to cooling towers, evaporative condensers, hot than the approved specifications by DM must not be used in buildings
D. In offices, if the average design lighting power density is less than

N
on any other property beyond the boundary of the plot . be a means of collecting and disposing of the water. Condensate
and cold water systems, showers, evaporative air coolers, spas, unless the metal is encapsulated in a system such as a photovoltaic cell.
six (6) Watts per square meter of gross floor area (GFA), the control collection pans and drainage pipes must be installed to prevent
B. Drainage must avoid pollution of watercourses and groundwater. fountains, misters, …etc. must be periodically maintained, cleaned,
requirements of parts C and D of this regulation need not apply.
Discharges made directly to ground, storm or marine waters disinfected and checked periodically in accordance with the technical standing water and to provide drainage. A minimum air break of All paints and materials containing lead or other heavy metals must be NE
must comply with the requirements of Dubai Municipality guidelines issued by DM regarding the control of Legionella bacteria in
E. It is recommended (optional) that, in offices, the artificial lighting in
twenty five (25) mm must be provided between the condensate accredited / certified from Dubai Central Lab or any source approved by E
C. Dust suppression techniques must ensure that dust generated by water systems. pipin g and the wastewater pipe. If the condensate is not to be DM.
spaces within six (6) meters in depth from exterior windows must be reused, it must be discharged to the wastewater system through a
construction and demolition activities must meet the requirements of
fitted with lighting controls incorporating photocell sensors capable properly sized water trap.
Code of Construction Safety Practice issued by Dubai Municipality. B. All water systems equipment and accessories including but not limited 38.Credit 701.05: Ozone Depletion Potential (ODP) Material Management:
to potable water network, hot and cold water systems, water tanks, of adjusting the level of electric lighting to supplement natural The following shall be applied for all new buildings:
D. Construction waste materials generated on site must be segregated
and stored on site prior to collection. Segregation must, at a minimum, pumps, pipes and fittings, must be maintained, cleaned and disinfected. daylight only when required. The combined artificial and daylight 31.Credit 601.04 Water Efficient Irrigation : One hundred percent A. Installation of HVAC and refrigeration equipment must contain SE
include labelled storage for inert aggregates, metals, timber, dry must provide an illumination level at the working plane between (100%) of the total exterior landscaping refrigerants with zero ozone depletion potential (ODP) or with global
four hundred (400) and five hundred (500) lux. When there is a
recyclables and hazard material. C. Sampling and testing must be carried out for the presence of bacteria /
germs and Legionella bacteria. hundred percent (100%) daylight, the lux levels may exceed five
must be irrigated using non-potable water or drip or subsoil water
delivery systems.
warming potential (GWP) less than 100, with the exception of equipment
containing less than 0.23 kilograms (kg) of refrigerant;
NW
E. For the disposal of hazardous waste, permit must be prepared and
hundred (500) lux. The landscaping includes green roofs.
obtained from Dubai Municipality Environment Department . The
hazardous waste must be transported in accordance with the D. All equipment and devices of swimming pools, spa pools, whirlpool All irrigation systems must incorporate, at any point that they connect B. Fire suppression systems must not contain any ozone-depleting S
requirements of DM Technical Guidelines and DM Code of baths, hydrotherapy pools and Jacuzzi must be maintained, cleaned, 24.Credit 502.07: Electronic Ballast: High frequency electronic ballasts to a portable substances (Chlorofluorocarbons - CFCs, Hydrochlorofluorocarbons-
Construction Safety Practice. disinfected and checked periodically. must be used with fluorescent lights and metal halide of 150 W and water supply, backflow prevention devices which must be checked
HCFs, or Halons). W
F. With the exclusion of drinking,toilet activities and concrete works,
E. All equipment and devices of irrigation system must be maintained,
less. High frequency electronic ballasts must be labeled as every twelve (12)
For existing equipment:
SW
potable water cannot be used for construction activities on any project conforming to an international standard approved by DEWA / Dubai months. Testing must be in line with the manufacturer’fs
site cleaned, disinfected, and checked periodically. Municipality. A. CFC and halon-based materials are not to be used for any purposes;
recommended practice for
G. Construction and demolition noise must be no greater than that
field testing or any other testing regime approved by Dubai
detailed in DM Technical Guidelines and DM Code of Construction Specialized companies approved by DM must do water tests and B. From 1 January 2030, HCFC based materials or any other material
25.Credit 502.11: Pipe and Duct Insulation: All pipes carrying refrigerant, Municipality.
Safety Practice. sampling. All test results must be recorded and kept along with the having any
hot water or chilled water and ducts, including prefabricated ducts,
H. Chemicals, fuels, solvents or hazardous wastes must be stored in records of maintenance and remedial works at site to be checked by DM. ODP are not to be used for any purposes;
supplying conditioned air must be insulated to minimize heat loss 32.Credit 602.01 Water Metering: Meters must be fitted to measure and
accordance DM Technical Guidelines and DM Code of Construction
and prevent condensation. record water demand and
Safety Practice. 15.Credit 406.02: Water Quality of Water Features: all Water Features with a C. The venting or direct discharging of any refrigerants during equipment
1. Pipes and ducts passing through conditioned spaces must be consumption of the facility as a whole and to provide accurate
I. Light pollution from the construction site must be minimized by water storage volume of over 1,000 liters and which creates a water maintenance is strictly prohibited; and
insulated in accordance with BSI British Standard BS 5422:2009 or records of consumption
ensuring that light sources are directed inwards and angled down so spray or aerosol including but not limited to waterfalls, ponds, streams,
other insulation standards approved by Dubai Municipality. (tariff class meters):
that no light is emitted above the horizontal plane. Lux levels should ...etc must be maintained, cleaned, disinfected and checked periodically D. The recovery, reclamation, recycling and reuse of refrigerants must be
to minimize the risk of Legionella bacteria or germs contamination and 2. Pipes passing through outside or unconditioned spaces must be practiced at all times.
meet the DM Code of Construction Safety Practice
not exceed the maximum limits outlined in the technical guidelines issued insulated with the minimum insulation thickness specified in Table A. For all buildings with a cooling load of at least 1 megawatt (MW)
by Dubai Municipality.: 502.11 (1) of Dubai Green Building Regulations and Specifications. or gross floor area of 5,000 sq m or greater , additional water
6. Credit 401.02: Building occupant and systems must be protected from
airborne contaminants which are generated or spread during construction 3. Ducts passing through outside or unconditioned spaces must be metering must be installed to record consumption data for major 39.Credit 701.06: The recycled content in building must account for at least
.
or renovation inside the buildings. Including toxic substances or 16.Credit 501.03: Air-conditioned buildings, the heat load must be calculated insulated with the minimum insulation thickness specified in Table water use of the building and major water uses in and around the five percent (5%) of the total volume of materials used in the construction
substances harmful to the human body, such as asbestos, lead, in accordance with the design parameters set out in credit 501.03 of DM 502.11 (2) of Dubai Green Building Regulations and Specifications. building. of the building. NO. DATE REVISON BY

pesticides, heavy metals, mold, dust, fumes, paint, ...etc green building regulations.Dubai Green Building Regulations and
Unless it is required to provide ventilation during construction, the supply Specifications. Insulation materials used must meet the requirements of regulation 40.Credit 701.07: The building materials available regionally must comprise
B. The building operator shall be responsible for recording water
and return heating, ventilation, and air conditioning (HVAC) system 701.01, Thermal and Acoustical Insulation Materials or BS at least five percent (5%) of the total volume of materials used in the REVISON
consumption for each individual meter. Records must be kept for five
openings must be closed and protected from contamination. All duct and 17. Credit 501.05: Air Leakage: Air-conditioned buildings with a cooling load construction of the building.
5422:2009, whichever is the more stringent. (5) years.
other related air distribution component openings must be covered with of 1 megawatt (MW) or greater must be tested to demonstrate that air CLIENT:
All insulation installations must have a suitable vapor barrier and
tape, plastic, sheet metal or other methods to prevent dust or debris from leakage does not exceed ten (10) cubic metres of air per hour for each 41.Credit 701.08: The composite wood products used in the interior of the
protection from Ultra Violet (UV) light. C .Each individual tenancy in the building must have a sub-meter
collecting in the system.
square meter of building envelope (10m3/hr/m2) into or out of the building must not contain added urea-formaldehyde resins.
If the HVAC system is used during construction or renovation, temporary installed when a building tariff meter is not present.
building, at an applied pressure difference of fifty (50) Pascal (Pa). Work
return air filters must be installed with a Minimum Efficiency Reporting 26.Credit 502.13: Ductwork Air Leakage: Air ductwork in buildings must
Value (MERV) in accordance with ASHRAE Standard 52.2-2007 or an
must be carried out by a company approved by Dubai Municipality.
be designed, built and installed to ensure that air leakage is D. Where a Building Management System (BMS) or Central Control
42. Credit 702.01: Construction and Demolition Waste: For all new buildings
except buildings in CBD area, at least fifty percent (50%) by volume or
ABDALHAI AHMAD IBRAHIM ALSAADI -
equivalent standard. minimized. Ductwork, with equipment attached to it, with an external and Monitoring System (CCMS) is installed, metering must be
Immediately prior to occupancy, the temporary return air filters must be
18.Credit 502.01: Energy Efficiency – HVAC Equipment and Systems: Air
conditioned buildings, heating, ventilating and air conditioning equipment
static pressure exceeding two hundred and fifty (250) Pascal (Pa) integrated into the system to allow real time profiling and
weight of waste material generated during the construction and / or
demolition of buildings must be diverted from disposal in landfills.
ALSAADI FOR PLASTIC BAGS &
removed and replaced with permanent filters having Minimum Efficiency and all ductwork exposed to external ambient conditions or within management of water demand and consumption.
Reporting Value (MERV) in accordance with ASHRAE Standard
52.2-2007 or an equivalent standard meet the DM Code of Construction
and systems must comply with the minimum energy efficiency
requirements and test procedures listed in Reference Tables 502.01(1)
unconditioned spaces must be pressure tested prior to occupancy in
Diverted materials must be recycled or reused.
This should be done through the following three paths: CONTAINERS TRADING ( STORAGE )
accordance with a method approved by Dubai Municipality (DM) and E. All meters must be capable of remote data access and must have
Safety Practice . and 502.01(2) of Dubai Green Building Regulations and Specifications or A. Concrete waste must be diverted to Construction Waste
any test procedure approved by Dubai Municipality a compliant amount of air leakage achieved. data logging capability and complying with DEWA specifications. All Treatment Plant.
7. Credit 401.06: Indoor Air Quality: Suitable ventilation shall be provided for Ductwork leakage testing must be carried out by a company
approved by DM to conduct commissioning of buildings.
meters should be approved by DEWA. B. Excavated soil, land-clearing debris and hazardous waste must be GREEN BUILDING DECLARATION
%UGRENBILDCATO
the building occupants in accordance with the minimum requirements of 19.Credit 502.02: Demand Controlled Ventilation: Air conditioned buildings diverted to places designed by the Concern Department of Dubai
ASHRAE Standard 62-2007. Air quality shall be in accordance with the with mechanical ventilation, Demand Controlled Ventilation (DCV) using a F. Virtual meters using run-hours are not acceptable as sub-meters. Municipality. PROJECT:

technical guidelines issued by Dubai Municipality. concentration of Carbon Dioxide (CO2), or other means to measure 27.Credit 502.14: Maintenance of Mechanical Systems: The mechanical, C. Other recyclable materials such as woods plastics and metals can
The buildings which optionally apply the following procedures will be occupancy, must be used in spaces larger than one hundred (100) electrical and plumbing systems in buildings must be serviced and be used at site.
G.The sub-meters should be used for demand management and cost
awarded indoor air quality certificate by Dubai Municipality: square metres (m2) and having a maximum design occupancy density maintained regularly: allocation purposes. The following materials are exempt from the calculation of the percentage PROPOSED ( G+M ) WAREHOUSES STORAGE
A. Indoor air quality testing must be carried out prior to occupancy. The greater than or equal to twenty five (25) people per hundred meter 1. To allow the mechanical services to be maintained, they must be of waste diverted form disposal at landfill facilities:
maximum limit for indoor air contaminants included in Table 401.6(1) squares (100m2). The default occupancy density values in ASHRAE installed so that adequate access is available to allow regular - Excavated soil and land-clearing debris; and
32. Credit 603.01 Wastewater Reuse: if a system is installed for the
of Dubai Green Building Regulations and Specifications must not be 62.2-2007 Table 6.1 should be used when the actual occupancy is not inspection, maintenance and cleaning of the equipment without the - Hazardous waste.
collection and reuse of greywater
exceeded. A report which shows compliance with these requirements known. need to remove or dismantle any building components.
must be submitted to Dubai Municipality produced within the building or for the use of Treated Sewage
The CO2 concentration should be kept below eight hundred (800) parts
Effluent (TSE) from an external source, the following is required:
per million(ppm). 2. The building owner must ensure that a maintenance manual and LOCATIN:

B. Air quality testing must be carried out by an air testing company or


An alarm must be triggered if CO2 concentration rises above hundred schedule is developed for the building based on the instructions for
AL TTAY , DUBAI
laboratory accredited by Dubai Municipality (DM), and the compliant A. TThe building must be dual-plumbed for the collection and
(1000) ppm. This alarm is to be either automatically monitored by a preventive maintenance or service from the manufacturers or
test results must be submitted to DM. recycled use of drainage
central control system, if available, or give a local audible or visual
suppliers of equipment of according to ASHRAE 62.1-2007 or water (greywater). Any pipes which transport greywater must be
C. Air quality testing equipment must have initial and periodical calibration indication when activated.
equivalent as approved by DM.
certificate as per manufacturer requirement from an external All buildings, with DCV, the CO2 sensors and systems must be checked colour-coded
differently from pipes that are used for potable (drinking standard)
PLOTN. 2840267
calibration facility accredited by DM or at least annual calibration and recalibrated as per manufacturer recommendations but not to exceed
3. The building owner must enter into a service contract with a
certificate. The initial and periodical calibration must be saved in a twelve (12) months by a contractor approved by Dubai Municipality water and be labelled ‘eNot Suitable for Drinking.’
maintenance company approved by DM or provide evidence that
special register to be checked by DM in order to ensure the accuracy SHETIL:

of the readings as condition of renewal the indoor air quality certificate. equipment will be properly maintained by competent members or
B. There must be a minimum air break of twenty five (25) mm
their own staff.
20.Credit 502.03: Elevators and Escalators: between any potable water sources and greywater collection
8. Credit401.08: Thermal Comfort: The cleanness of HVAC equipment and
A. Escalators - Escalators must be fitted with controls to reduce speed or systems.
systems must be maintained in the building and all its parts must be 4. Service records in the form of a service log book including details
to stop when no traffic is detected. Escalators shall be designed with
inspected and cleaned in accordance with the standard specifications
of both preventive and corrective maintenance must be kept onsite
approved by Dubai Municipality and in accordance with the technical
guidelines issued by DM. While specialized maintenance companies
energy savings features as described below:
1. Reduced speed control: The escalator shall change to a slower and be readily available for inspection by DM.
C. Greywater must not be used for purposes where it will come into
contact with the
GREEN BUILDING NOTES
approved by DM must carry out inspection and cleaning or provide a speed when no activity has been detected for a period of a maximum human body. It must be treated to the standard required by Dubai
proof that maintenance shall be done by building operator if he has a of three (3) minutes. Detection shall be by photocell activation at the 28. Credit 503.01: Commissioning and Management: For buildings with Municipality
qualified personnel and equipment to do the job. top and bottom landing areas. cooling load of one megawatt (1 MW) or greater, other than villas, For all new commercial car washing facilities, they must recover and
2. Use on demand: The escalator shall shut down when no activity the commissioning of air distribution systems, water distribution reuse at least fifty percent( 50%) of their wastewater .
9. Credit 402.01: The heating, ventilating and air conditioning(HVAC) has been detected for a period of a maximum of fifteen (15) minutes. systems, lighting, central control and building management
CONTRAIG:

system in the building must be capable of providing the following range of Use on demand escalators must be designed with energy efficient systems, refrigeration systems and boilers must be carried out
conditions for 95% of the year: soft start technology. The escalator shall start automatically when before a completion certificate will be issued. 33. Credit 603.02 Water Consumption for Heat Rejection Including
required; the activation shall be by photocells installed in the top and 1. Commissioning must be carried out in accordance with the CIBSE Cooling Towers
bottom landing areas. Codes or any other commissioning standard of code approved by
Dry bulb Temperature DB: 22.5 Potable water supplied by Dubai Electricity and Water Authority
DM. (DEWA) must not be used for heat rejection purposes.
Relative humidity RH: 30 % (m n) B. Elevators (lifts) - Elevators (lifts) must be provided with controls to
reduce the energy demand. To meet this requirement, the following
For occupant comfort, normal occupied spaces should have an average 2. Work must be carried out by a company approved by DM to Where cooling towers are used, Treated Sewage Effluent (TSE),
features must be incorporated in traction drive elevators:
air velocity between (0.2 - 0.3) m/s. conduct commissioning of buildings. seawater or recycled water must be used to meet the water demand
Lower mit Upper Limit 1. Use of AC Variable-Voltage and Variable-Frequency (VVVF) drives for all heat rejection purposes. Secondary water sources must be
DB: 25.5 °C 3.Commissioning results must be recorded and available for approved by Dubai Municipality or DEWA.
on non-hydraulic elevators.
RH: 60 % (max) inspection by Dubai Municipality.
2. Energy efficient lighting inside the elevator including controls to turn A separate totalizing meter must be fitted on the water supply to
lights off when the elevator has been inactive for a period of a 4. A system manual, documenting the information required to allow individual cooling towers and a daily log of water use must be kept.
maximum of five (5) minutes. future operations staff to understand and optimally operate the
commissioned services, must be developed and provided to the
building owner or f acilities operator following commissioning. Phone - 971 4 3212142 , Po Box - 430600 Email - dsc@denalistars.com

ARCHIT.ENG --- PROJ.N


226-2022

Alaa H Abu Shamaa


15-09-2022
STRUC.ENG

DATE
Reg. No - 114409038

MEPNG. --- DWGSIZE A-2

DRAWNBY:
Mohd. Shiyas FILE:

SCALE

DWG.NO REV.NO

1 : 100 M-101
25/10/22

2840267

389820-1-2
EXTERNAL WALL SECTION

NOTES:-

THISDRAWNGEPOYFLCU.BX:4306,M
1.

EXTERNAL FINISH INTERNAL FINISH


EXTERNAL

THISDRAWNGOBECL.MY
2.

INTERNAL
3.

ANYDISCREPTOBUGHFLVMWK.

CONCRETE BLOCK WITH POLYSTERENE DIRECTON:

INSERT

N NE
E
EXTERNAL FINISH

SE
HORIZONTAL SECTION

NW
S
BEAM JUCTION

W
SW
EXTERNAL

INTERNAL FINISH

INTERNAL

COLUMN

CONCRETE BEAM

INTERNAL FINISH
NO. DATE REVISON BY

REVISON

CLIENT:

EXTERNAL FINISH
ABDALHAI AHMAD IBRAHIM ALSAADI -
COLUMN BEAM JUCTION

ALSAADI FOR PLASTIC BAGS &


HORIZONTAL SECTION

CONTAINERS TRADING ( STORAGE )

PROJECT:
EXTERNAL

PROPOSED ( G+M ) WAREHOUSES STORAGE


INTERNAL FINISH

INTERNAL
LOCATIN:

AL TTAY , DUBAI
COLUMN

CONCRETE BEAM PLOTN. 2840267

INTERNAL FINISH SHETIL:

U FACTOR SHEET - 1

TERRAZZO TILES CONTRAIG:

PLASTER (CEMENT/SAND)

(RIGID POLY FOAM-50)


EXPOSED ROOF

ASPHALT ROLL ING ROOFING

Phone - 971 4 3212142 , Po Box - 430600 Email - dsc@denalistars.com

REINFORCED CONRETE ARCHIT.ENG --- PROJ.N


226-2022

Alaa H Abu Shamaa


15-09-2022
STRUC.ENG

DATE
Reg. No - 114409038

MEPNG. --- DWGSIZE A-2


PLASTER (CEMENT/SAND)

DRAWNBY:
Mohd. Shiyas FILE:

SCALE

DWG.NO REV.NO

1 : 100 M-102
25/10/22

2840267

389820-1-2

INTERNAL FINISH
100MM HIGH SKIRTING
FLOOR FININSH AS PER
INSULATED GROUND FLOOR

50MM THICK CEMENT

100mm THK. CONC.

EXTRUDED POLYSTYREN NOTES:-

COMPACTED EARTH THISDRAWNGEPOYFLCU.BX:4306,M


1.

THISDRAWNGOBECL.MY
2.

3.

ANYDISCREPTOBUGHFLVMWK.

F.G.L

DIRECTON:

INTERNAL FINISH

100MM HIGH SKIRTING

N
FLOOR FININSH AS PER

NE
50MM THICK CEMENT E
NON - INSULATED

100mm THK. CONC.


GROUND FLOOR

WITH A142 MESH


SE
COMPACTED EARTH
NW
S
W
SW

F.G.L

NO. DATE REVISON BY

REVISON

CLIENT:
THK. INTERNAL FINISH
THK. INTERNAL FINISH

ABDALHAI AHMAD IBRAHIM ALSAADI -


ALSAADI FOR PLASTIC BAGS &
PARTITIONS

CONTAINERS TRADING ( STORAGE )

PROJECT:

PROPOSED ( G+M ) WAREHOUSES STORAGE

LOCATIN:

AL TTAY , DUBAI

HOLLOW CONCRETE BLOCK PLOTN. 2840267

SHETIL:

U FACTOR SHEET - 2

CONTRAIG:

CONCRETE SLAB
TYPICAL FLOOR

Phone - 971 4 3212142 , Po Box - 430600 Email - dsc@denalistars.com

ARCHIT.ENG --- PROJ.N


226-2022

Alaa H Abu Shamaa


15-09-2022
STRUC.ENG

DATE
Reg. No - 114409038

MEPNG. --- DWGSIZE A-2

DRAWNBY:
Mohd. Shiyas FILE:

SCALE

DWG.NO REV.NO

1 : 100 M-103
WINDOW DETAILS:-
\A1;3.50

\A1;0.8 \A1;0.8 \A1;0.8 \A1;0.8


25/10/22

2840267

389820-1-2

S F S F
\A1;.20

FINISHED \A1;.0 NOTES:-

FLR. LVL. THISDRAWNGEPOYFLCU.BX:4306,M


1.

W1 2.
THISDRAWNGOBECL.MY

WINDOW TY. ALUMINIUM DOUBLE GLASS


3.

ANYDISCREPTOBUGHFLVMWK.

OPENING TY. FIXED & SLIDING WINDOW

QUANTITY 11.NOS [MF]

LOCATION WAREHOUSE- 1,2 AND 3 DIRECTON:

\A1;3.50

N
\A1;0.8 \A1;0.8 \A1;0.8 \A1;0.8

NE
E

S F S F SE
\A1;.20

NW
S
W
SW

SAFETY GRILL

\A1;.65

FINISHED
FLR. LVL.
NO. DATE REVISON BY

REVISON

CLIENT:

W2
ABDALHAI AHMAD IBRAHIM ALSAADI -
WINDOW TY. ALUMINIUM DOUBLE GLASS
ALSAADI FOR PLASTIC BAGS &
OPENING TY. FIXED & SLIDING WINDOW CONTAINERS TRADING ( STORAGE )
QUANTITY 2.NOS [GF]

PROJECT:

LOCATION WAREHOUSE-3

PROPOSED ( G+M ) WAREHOUSES STORAGE


\A1;0.6

LOCATIN:

AL TTAY , DUBAI
\A1;2.0

O
\A1;0.6

PLOTN. 2840267

SHETIL:

F \A1;0.9

WINDOW SCHEDULE
\A1;.50

FINISHED CONTRAIG:

FLR. LVL.

W3 W4
WINDOW TY. ALUMINIUM DOUBLE GLASS WINDOW TY. ALUMINIUM DOUBLE GLASS

OPENING TY. TOP HINGED WINDOW OPENING TY. FIXED Phone - 971 4 3212142 , Po Box - 430600 Email - dsc@denalistars.com

QUANTITY 3.NOS [GF] QUANTITY 12.NOS ARCHIT.ENG --- PROJ.N


226-2022

Alaa H Abu Shamaa


LOCATION 3.TOILETS LOCATION TOP OF THE ROOF 15-09-2022
STRUC.ENG

DATE
Reg. No - 114409038

MEPNG. --- DWGSIZE A-2

DRAWNBY:
Mohd. Shiyas FILE:

SCALE

DWG.NO REV.NO

1 : 100 M-104
. . . . . . . NEIGH.PLOT [ 2840297 ] . . . . . . .
PLOT LIMIT PLOT LIMIT

25/10/22

2840267

389820-1-2

12 01

UP
D1 GF-01

PUMB ROOM
UP
2.70x2.50 0
7
.
2
;
1
A
\
AREA = 9.00 Sq.Mt

\A1;2.50

20xEAG

150xEAD NOTES:-

10CFM

WITHGRAVYLOUES
THISDRAWNGEPOYFLCU.BX:4306,M
PANTRY A1 1.

2.0x2.50
TE
150xTED

10CFM

150xEAD

10CFM

W3
TE TOILET 2.
THISDRAWNGOBECL.MY

MEZZANINE FLR LIMIT


20xEAG
150xTED
1.5x2.5
D3 WAREHOUSE GROUND - 01
150xEAD 50CFM

10CFM STORAGE AREA = 243.00 Sq.Mt


WITHGRAVYLOUES

3.

150xEAD
ANYDISCREPTOBUGHFLVMWK.
10CFM
D1

13CFMEXHAUSTIRWLONDPVB
GARBAGE ROOM
UP
2.50x2.50
AREA = 8.00 Sq.Mt

DIRECTON:

916CFMRESHAIWTNDPLOUVB4.2mG
UP

UP
D2 12 01

N
RS
. . . . . . . NEIGH.PLOT [ 2840254 ] . . . . . . .

. . . . . . . NEIGH.PLOT [ 2840262 ] . . . . . . .
\A1;2.50
NE
12 01 E
D1 UP

ELECT. ROOM
UP
2.70x2.50
AREA = 9.00 Sq.Mt
0
7
.
2
;
1
A
\
SE
GF-02

NW
S
W
SW
PANTRY
2.0x2.50 A1
20xEAG
TE
150xEAD
150xTED
10CFM
10CFM
RS
WITHGRAVYLOUES

150xEAD

10CFM

W3
TOILET
TE

1.5x2.5
20xEAG
150xTED
MEZZANINE FLR LIMIT
WAREHOUSE GROUND - 02
150xEAD 50CFM

10CFM

WITHGRAVYLOUES
D3 STORAGE AREA = 185.00 Sq.Mt
150xEAD

10CFM

NO. DATE REVISON BY


6CFMRESHAIWTNDPLOUVB4.2mG

REVISON

83CFMEXHAUSTIRWLONDPVB

CLIENT:

UP
D2
UP
ABDALHAI AHMAD IBRAHIM ALSAADI -
12 01

ALSAADI FOR PLASTIC BAGS &


CONTAINERS TRADING ( STORAGE )
12 01

W3 D3
TOILET
TE
UP
1.5x2.5
20xEAG
150xTED
150xEAD 50CFM PROJECT:

10CFM

WITHGRAVYLOUES

150xEAD

10CFM
PROPOSED ( G+M ) WAREHOUSES STORAGE

TE
PANTRY A1
2.0x2.50
20xEAG
150xTED

150xEAD 10CFM

10CFM
RS LOCATIN:
WITHGRAVYLOUES
AL TTAY , DUBAI
150xEAD

10CFM

PLOTN. 2840267
716CFMRESHAIWTNDPLOUVB4.2mG
SHETIL:

WAREHOUSE GROUND - 03 GROUND FLOOR HVAC AND


MEZZANINE FLR LIMIT
STORAGE AREA = 198.00 Sq.Mt VENTILATION LAYOUT

D2
UP

CONTRAIG:

NOTE :-
90CFMEXHAUSTIRWLONDPVB

ALL AC EQUIPMENT SHALL BE USED


OZONE FRIENDLY REFRIGERANT
UP

01 12
( Eg:R410 ,etc)

W2 W2

PLOT LIMIT PLOT LIMIT


Phone - 971 4 3212142 , Po Box - 430600 Email - dsc@denalistars.com

ARCHIT.ENG --- PROJ.N


226-2022

Alaa H Abu Shamaa


.....ROAD-28.96m..... STRUC.ENG

Reg. No - 114409038
DATE 15-09-2022

MEPNG. --- DWGSIZE A-2

DRAWNBY:
Mohd. Shiyas FILE:

GROUND FLOOR HVAC AND VENTILATION LAYOUT


%UGRONDFLHVACETIY
SCALE

DWG.NO REV.NO

1 : 100 M-105
. . . . . . . NEIGH.PLOT [ 2840297 ] . . . . . . .
PLOT LIMIT PLOT LIMIT

25/10/22

2840267

389820-1-2

W1 W1

22 13 12 01

DN

916CFMRESHAIWTNDPLOUVB4.2mG 13CFMEXHAUSTIRWLONDPVB

NOTES:-

THISDRAWNGEPOYFLCU.BX:4306,M
1.

W1
W1
VOID
WAREHOUSE MEZZ. - 01 2.
THISDRAWNGOBECL.MY

STORAGE AREA = 175.00 Sq.Mt [70%]

3.

ANYDISCREPTOBUGHFLVMWK.

916CFMRESHAIWTNDPLOUVB4.2mG 13CFMEXHAUSTIRWLONDPVB

DIRECTON:

DN

22 13 12 01

N
. . . . . . . NEIGH.PLOT [ 2840254 ] . . . . . . .

. . . . . . . NEIGH.PLOT [ 2840262 ] . . . . . . .
NE
22 13 12 01
W1
E
DN

6CFMRESHAIWTNDPLOUVB4.2mG 83CFMEXHAUSTIRWLONDPVB
SE

NW
S
W
SW

W1
W1
WAREHOUSE MEZZ. - 02 VOID

STORAGE AREA = 129.00 Sq.Mt [70%]

NO. DATE REVISON BY

REVISON

6CFMRESHAIWTNDPLOUVB4.2mG 83CFMEXHAUSTIRWLONDPVB

CLIENT:

DN
ABDALHAI AHMAD IBRAHIM ALSAADI -
22 13 12 01

ALSAADI FOR PLASTIC BAGS &


CONTAINERS TRADING ( STORAGE )
22 13 12 01

DN

PROJECT:

90CFMEXHAUSTIRWLONDPVB
716CFMRESHAIWTNDPLOUVB4.2mG

PROPOSED ( G+M ) WAREHOUSES STORAGE

LOCATIN:

AL TTAY , DUBAI

PLOTN. 2840267
W1

W1 WAREHOUSE MEZZ. - 03 SHETIL:

VOID
STORAGE AREA = 138.00 Sq.Mt [70%]
MEZZANINE FLOOR HVAC AND
VENTILATION LAYOUT

CONTRAIG:

NOTE :-
90CFMEXHAUSTIRWLONDPVB
716CFMRESHAIWTNDPLOUVB4.2mG

ALL AC EQUIPMENT SHALL BE USED


DN
OZONE FRIENDLY REFRIGERANT
VOID
01 12 13 22
( Eg:R410 ,etc)

W1 W1

PLOT LIMIT PLOT LIMIT


Phone - 971 4 3212142 , Po Box - 430600 Email - dsc@denalistars.com

ARCHIT.ENG --- PROJ.N


226-2022

Alaa H Abu Shamaa


.....ROAD-28.96m..... STRUC.ENG

Reg. No - 114409038
DATE 15-09-2022

MEPNG. --- DWGSIZE A-2

DRAWNBY:
Mohd. Shiyas FILE:

MEZZANINE FLOOR HVAC AND VENTILATION LAYOUT


%UMEZANIFLORHVCDTY
SCALE

DWG.NO REV.NO

1 : 100 M-106
. . . . . . . NEIGH.PLOT [ 2840297 ] . . . . . . .
PLOT LIMIT PLOT LIMIT

/
g
k
3
J
Y
2
5
4
M
,
m
7
.
0
K
H
W
E
T
U
S
}
P
-
:
G
N
I
D
A
C
F
O
R
L
\
{

NATURLSCEIFODPY\MKGH(V5%)
25/10/22

2840267

389820-1-2

SLOPE SLOPE

NOTES:-

THISDRAWNGEPOYFLCU.BX:4306,M
1.

PROPOSED ( G+M ) WAREHOUSE- 01


SLOPE SLOPE
PROP.ROOFING SRI VALUE > 78
THISDRAWNGOBECL.MY
2.

3.

ANYDISCREPTOBUGHFLVMWK.

DIRECTON:

SLOPE SLOPE
. . . . . . . NEIGH.PLOT [ 2840254 ] . . . . . . .

. . . . . . . NEIGH.PLOT [ 2840262 ] . . . . . . .
N NE
E

SLOPE SLOPE SE

NW
S
W
SW

PROPOSED ( G+M ) WAREHOUSE- 02

SLOPE PROP.ROOFING SRI VALUE > 78 SLOPE

NO. DATE REVISON BY

REVISON

CLIENT:

SLOPE SLOPE
ABDALHAI AHMAD IBRAHIM ALSAADI -
ALSAADI FOR PLASTIC BAGS &
CONTAINERS TRADING ( STORAGE )

PROJECT:

SLOPE SLOPE

PROPOSED ( G+M ) WAREHOUSES STORAGE

LOCATIN:

AL TTAY , DUBAI

PROPOSED ( G+M ) WAREHOUSE- 03 PLOTN. 2840267

SLOPE PROP.ROOFING SRI VALUE > 78 SLOPE SHETIL:

ROOF FLOOR HVAC AND


VENTILATION LAYOUT

CONTRAIG:

NOTE :-

SLOPE SLOPE ALL AC EQUIPMENT SHALL BE USED


OZONE FRIENDLY REFRIGERANT
( Eg:R410 ,etc)

PLOT LIMIT PLOT LIMIT


Phone - 971 4 3212142 , Po Box - 430600 Email - dsc@denalistars.com

ARCHIT.ENG --- PROJ.N


226-2022

.....ROAD-28.96m..... STRUC.ENG Alaa H Abu Shamaa


Reg. No - 114409038
DATE 15-09-2022

MEPNG. --- DWGSIZE A-2

Mohd. Shiyas FILE:

ROOF FLOOR HVAC AND VENTILATION LAYOUT


DRAWNBY:

SCALE
%UROFLHVACNDETIY DWG.NO REV.NO

1 : 100 M-107
25/10/22

2840267

389820-1-2

NOTES:-

THISDRAWNGEPOYFLCU.BX:4306,M
1.

THISDRAWNGOBECL.MY
2.

3.

ANYDISCREPTOBUGHFLVMWK.

DIRECTON:

N NE
E

SE

NW
S
W
SW

NO. DATE REVISON BY

REVISON

CLIENT:

ABDALHAI AHMAD IBRAHIM ALSAADI -


ALSAADI FOR PLASTIC BAGS &
CONTAINERS TRADING ( STORAGE )

PROJECT:

PROPOSED ( G+M ) WAREHOUSES STORAGE

LOCATIN:

AL TTAY , DUBAI

PLOTN. 2840267

SHETIL:

THERMAL LOAD CALCULATION

CONTRAIG:

Phone - 971 4 3212142 , Po Box - 430600 Email - dsc@denalistars.com

ARCHIT.ENG --- PROJ.N


226-2022

Alaa H Abu Shamaa


15-09-2022
STRUC.ENG

DATE
Reg. No - 114409038

MEPNG. --- DWGSIZE A-2

DRAWNBY:
Mohd. Shiyas FILE:

SCALE

DWG.NO REV.NO

1 : 100 M-108

You might also like