Professional Documents
Culture Documents
5 Mineralised Zones
Number of Mineral Zones Not determined
Trend (Dip and Strike) Not determined
Total Thickness Not determined
6 Accessibility
Nearest Rail Head Mududi and Habbanagatta Railway Station
Road 7 km WNW of Gandasi village
Airport Hubbali
7 Hydrography
Local Surface Drainage Pattern
Dendritic drainage pattern
(Channels)
Only first and second order streams present in the
area and are flowing from SW to NE direction. Very
Rivers/Streams
few E-W flowing streamlets also noticed and are
appear to be controlled by fracture / fault zones.
8 Climate
Mean Annual Rainfall Min 5, max 159 mm and annual rainfall 764mm
Temperatures (December) Min 14.3°C
Temperatures (June) Max 33.5°C
9 Topography Undulating topography
Topo Sheet Number 57 C/8
Morphology of the Area Hilly terrain
Part B - PARTICULARS OF STATUTORY LICENSES, PERMITS, PERMISSIONS,
CONCESSIONS, APPROVALS AND CONSENTS RELATED TO MINING OPERATIONS
Particulars Details/Status
To be obtained by the successful bidder where ever
1 Forest clearance for leased area
it is required
Wild life clearance (sanctuary, reserve To be obtained by the successful bidder where ever
2
or special zone clearances) it is required
To be obtained by the successful bidder where ever
3 Environmental Clearance
it is required
To be obtained by the successful bidder where ever
4 Consent to establish
it is required
To be obtained by the successful bidder where ever
5 Explosive licence
it is required
To be obtained by the successful bidder where ever
6 Permission for mine opening
it is required
Permission of installation/ trial To be obtained by the successful bidder where ever
7
operation of equipment. it is required
To be obtained by the successful bidder where ever
8 Ground water clearance (Centre/State)
it is required
To be obtained by the successful bidder where ever
9 Railway siding approval
it is required
To be obtained by the successful bidder where ever
10 Approval for diesel storage
it is required
To be obtained by the successful bidder where ever
11 Power line from State Discom
it is required
Clearances relating to work under To be obtained by the successful bidder where ever
12 an existing transmission line or it is required
shifting of the transmission line
To be obtained by the successful bidder where ever
13 Grama Sabha consent
it is required
To be obtained by the successful bidder where ever
14 Consent for Operate (CFO)
it is required
To be obtained by the successful bidder where ever
15 Approval of Mine Plan from IBM
it is required
To be obtained by the successful bidder where ever
16 Others (if any)
it is required
Part C - Particulars of Land
Area Details
1 Total Concession Area 4015.31 Ha
Approximately 457.56 Ha as per Land use land
2 Forest Land with Status
cover data computation.
Approximately 524.66 Ha as per Land use land
3 Government Land with Status
cover data computation.
Approximately 3033.09 Ha as per Land use land
4 Private land with Status
cover data computation.
Land use Land cover map prepared using spatial
data with Cadastral details is uploaded for ready
reference. The survey number wise details of land
status with extent as per the revenue records
5 Revenue survey details of the area (Bhoomi database) is also shared for reference.
However, the actual extent and land status of
individual survey numbers may vary in the ground.
The given reference data given to enable the bidders
to get a fair idea of the landuse and extent.