Professional Documents
Culture Documents
Presented by:
An Inventor
Our Roadmap
Containerized solution
Apollo
WRL UPS
Jebel Ali Factory opened
Infusion Solar Energy Systems
Amber and Waseem starts is set up.
working on Centauri Also, Infusion Power is set up
Amber and Waseem R&D starts A Total of 22M USD is raised.
working on Sirius. BGT was set up (currently
MICC energy server was built SUPER CAPACITOR raising upto 55M USD)
MODULE WAS BUILT
Amber and Waseem R&D
creates Centauri and Sirius
Prototypes
5 6 7 8 9
2012-2014 2015 2016 2019 2020
Kilowatt Labs Inc is
2011 4 formed in New York
and raised 5M USD
Largest Supercap
Based Factory in
The following year Middle East Set Up
Amber and Waseem was set
1988-1989 1990-2001 2009-2010 up Kilowatt Lab raised Largest R&D Team in
25M USD GCC
Installed largest Solar
1 2 3 Hoarding Board in the region Supercap Module was
refined
Sirius Module was
UPS; Pakistan’s First UPS was launched launched
First Energy Server
Youngest National Started working on EPC Patent for Centauri &
was launched
Science Award Electronic Home Sirius registered
Security Systems Al Qusais Factory globally.
Electronic
Electronic Ballast for Opened WRL Inc in USA is
Telephone Locks
Fluorescent Lights Incorporated
Satellite Based Car WRL PVT Technologies
Tracking System Pakistan is Launched
6
The world’s first supercapacitor - based energy storage solution based on patented
power electronics control technology that delivers:
Cell balancing
Self-discharge control
7
Industrial
Data Centers
8
Microgrids
The Ultimate Storage Solutions
9
MICROGRID
MICROGRID is a concept of setting up localized generation
units and connecting it low voltage distribution network, to
serve the consumers.
IMPORTANCE OF MICROGRIDS
MICROGRID could prove to be a solution to the global energy
crisis
What is a MICROGRID
PURPOSE OF A MICROGRID
• Reduce Emissions
11
ENERGY CCTV
MICROGRID COMPONENTS
MOTION SERVER MORITORING
LED TUBE
SENSOR CONSOLE
LIGHT
1. Generation sources
20’
CONTAINER
2. Power Manager / Controller
3. Energy Storage
4. Loads
5. Point of common coupling
DG INPUT
SIRIUS
STORAGE
AC OUTPUT
ACU
PV INPUT
16
OUR PROJECTS
20
5KW CENTAURI / 10.65KWH SIRIUS 40KW CENTAURI / 56.8KWH SIRIUS / 10’ CONTAINER
MALAYSIA SUDAN
21
THANK YOU!