You are on page 1of 6

ARCHITECTURE THESIS LOGBOOK Page 1 of 6

Week 4
AD10 PRELIMINARY
ENDORSEMENT MATRIX
Original / Student Copy

To be reviewed and marked by the Thesis Adviser

Student must be able to present his/her output to the Thesis Adviser as described in any of the highlighted/italicized/shaded box to merit a
preliminary endorsement.

A B C D E

Required 0 - 29% 30% - 49% 50% - 74% 75% - 89% 90% - 100%
Output (NO OUTPUT) (DEVELOPING (HALFWAY (SUBSTANTIALLY (COMPLETE)
OUTPUT) COMPLETE) COMPLETE)

Site Only the building line, Everything stated in Everything stated in Everything stated in Everything stated in ‘D’
Develop-ment contour lines and ‘A’ ‘B’ ‘C’ +
Plan property line are shown + + + Rendering of building(s),
(should be at least Access and circulation Landscaping (softscape Drawing label, North landscaping (hardscape
50%) (roadway, sidewalk or and hardscape on orientation, graphical and softscape), water
pathways) planting strips, or numerical scale; features, and open spaces;
medians, and open labels (buildings, buildings cast shadows;
spaces); parking areas outdoor spaces, and traffic/circulation flow for
for public, admin/staff, parking); labels for site people and vehicles
service, and PWD; site and building ingress including drop-off and
ingress and egress and egress (public, pick-up; vicinity map
admin, staff, VIP, highlighting the project
service) site with appropriate
graphical scale and labels

Floor Plans Less than half of all More than half of all All floors of all Everything stated in Everything stated in 'D'
(should be at least floors of all buildings floors of all buildings buildings with wall ‘C’ +
50%) are drawn are drawn thickness; door and + FFE shown on the rest of
schematically schematically window openings are All doors and windows the spaces; all floor plans
indicated; all spaces are are drawn; are labelled; numerical or
legibly labelled furniture/fixture/equip graphical scale are shown;
ment (FFE) are drawn gridlines and section lines
on all major spaces, are drawn; drawings are
administrative spaces, rendered
and toilets

Elevations Less than half of all More than half of all All required elevations Everything stated in 'C' Everything stated in ‘D'
(should be at least required elevations required elevations + +
50%) Drawing labels, Shade and shadows;
gridlines, finish floor drawings are rendered;
lines numerical or graphical
scale

UST College of Architecture Thesis Program AY 2018-2019


ARCHITECTURE THESIS LOGBOOK Page 2 of 6

Name Date

AD10 PRELIMINARY
ENDORSEMENT MATRIX
Thesis Adviser Copy

To be reviewed and marked by the Thesis Adviser

C Student must be able to present his/her output to the Thesis Adviser as described in any of the highlighted/italicized/shaded box to merit a
preliminary endorsement.
U
T A B C D E

Required 0 - 29% 30% - 49% 50% - 74% 75% - 89% 90% - 100%
H Output (NO OUTPUT) (DEVELOPING (HALFWAY (SUBSTANTIALLY (COMPLETE)
E OUTPUT) COMPLETE) COMPLETE)

R
Site Only the building line, Everything stated in Everything stated in Everything stated in Everything stated in ‘D’
Development contour lines and ‘A’ ‘B’ ‘C’ +
Plan property line are shown + + + Rendering of building(s),
(should be at least Access and circulation Landscaping (softscape Drawing label, North landscaping (hardscape
50%) (roadway, sidewalk or and hardscape on orientation, graphical and softscape), water
pathways) planting strips, or numerical scale; features, and open spaces;
medians, and open labels (buildings, buildings cast shadows;
spaces); parking areas outdoor spaces, and traffic/circulation flow for
for public, admin/staff, parking); labels for site people and vehicles
service, and PWD; site and building ingress including drop-off and
ingress and egress and egress (public, pick-up; vicinity map
admin, staff, VIP, highlighting the project
service) site with appropriate
graphical scale and labels

Floor Plans Less than half of all More than half of all All floors of all Everything stated in Everything stated in 'D'
(should be at least floors of all buildings floors of all buildings buildings with wall ‘C’ +
50%) are drawn are drawn thickness; door and + FFE shown on the rest of
schematically schematically window openings are All doors and windows the spaces; all floor plans
indicated; all spaces are are drawn; are labelled; numerical or
legibly labelled furniture/fixture/equip graphical scale are shown;
ment (FFE) are drawn gridlines and section lines
on all major spaces, are drawn; drawings are
administrative spaces, rendered
and toilets

Elevations Less than half of all More than half of all All required elevations Everything stated in 'C' Everything stated in ‘D'
(should be at least required elevations required elevations + +
50%) Drawing labels, Shade and shadows;
gridlines, finish floor drawings are rendered;
lines numerical or graphical
scale

UST College of Architecture Thesis Program AY 2018-2019


ARCHITECTURE THESIS LOGBOOK Page 3 of 6

A B C D E
Required 0 - 29% 30% - 49% 50% - 74% 75% - 89% 90% - 100%
Output (NO OUTPUT) (DEVELOPING (HALFWAY (SUBSTANTIALLY (COMPLETE)
OUTPUT) COMPLETE) COMPLETE)

Sections Less than half of all More than half of all All required sections Everything stated in 'C' Everything stated in 'D'
(should be at required sections required sections are drawn completely + +
least 30%) Drawing labels, Furniture/fixture/equipme
gridlines, different nt, ceiling are drawn;
levels are shown; all drawings are rendered;
rooms are labelled numerical or graphical
scale

Architectu- Less than half of all More than half of all All five architectural Everything stated in 'C' Everything stated in ‘D’
ral Bay architectural details architectural details details; + +
Section ABS showing the Callouts, dimensions, Five architectural spot
(ABS) and lowest to the highest floor/ceiling/apex line, details with dimensions,
Spot Details architectural feature material specs, specifications, scale and
(should be at furniture/fixture/equip drawing labels
least 30%) ment, gridlines,
drawing and room
labels, scale of the ABS

Structural Less than half of More than half of Structural concept is Everything stated in 'C' Everything stated in ‘D’
Concept structural concept structural concept drawn with dimensions, + +
(should be at specifications, and Structural Concept Shade and shadows and
least 30%) drawing labels (isometric) with rendering for the Struct.
drawing labels Concept

Perspectives More than half of the More than half of the More than half of the More than half of the All required exterior and
(should be at required exterior and required exterior and required exterior and required exterior and architectural interior
least 30%) architectural interior architectural interior architectural interior architectural interior perspectives are post
perspectives are perspectives are perspectives are perspectives are processed with entourage,
modeled modeled with rendered with materials rendered with shadows and background.
components and light

Concept Project Title, Everything stated in 'A' Everything stated in ‘B' Everything stated in Everything stated in ‘D'
Board Project Background, + + ‘C’ +
(should be at Project Goal and Design Objectives, Conceptual + All iconography, images,
least 30%) Objectives Design Considerations, Development, Form or Site Analysis illustrations to support
Philosophy and Shape Finding ‘A’, “B’, ‘C’, and ‘D’;
Concept Rendering

Thesis Book Updated / corrected Updated / corrected Updated / corrected Updated / corrected Updated / corrected /
(should be at less than 30% of the less than 50% of the more than 50% of the more than 75% of the completed all
least 75%) book book book book requirements for the
Thesis Book

UST College of Architecture Thesis Program AY 2018-2019


ARCHITECTURE THESIS LOGBOOK Page 4 of 6

Name Date
A B C D E
Required 0 - 29% 30% - 49% 50% - 74% 75% - 89% 90% - 100%
Output (NO OUTPUT) (DEVELOPING (HALFWAY (SUBSTANTIALLY (COMPLETE)
OUTPUT) COMPLETE) COMPLETE)

C Sections
(should be at
Less than half of all
required sections
More than half of all
required sections
All required sections
are drawn completely
Everything stated in 'C'
+
Everything stated in 'D'
+
U least 30%) Drawing labels, Furniture/fixture/equipme
T gridlines, different
levels are shown; all
nt, ceiling are drawn;
drawings are rendered;
rooms are labelled numerical or graphical
H scale

E
R
Architectu- Less than half of all More than half of all All five architectural Everything stated in 'C' Everything stated in ‘D’
ral Bay architectural details architectural details details; + +
Section ABS showing the Callouts, dimensions, Five architectural spot
(ABS) and lowest to the highest floor/ceiling/apex line, details with dimensions,
Spot Details architectural feature material specs, specifications, scale and
(should be at furniture/fixture/equip drawing labels
least 30%) ment, gridlines,
drawing and room
labels, scale of the ABS

Structural Less than half of More than half of Structural concept is Everything stated in 'C' Everything stated in ‘D’
Concept and structural concept structural concept drawn with dimensions, + +
Details specifications, and Structural Concept Shade and shadows and
(should be at drawing labels (isometric) with rendering for the Struct.
least 30%) drawing labels Concept

Perspectives More than half of the More than half of the More than half of the More than half of the All required exterior and
(should be at required exterior and required exterior and required exterior and required exterior and architectural interior
least 30%) architectural interior architectural interior architectural interior architectural interior perspectives are post
perspectives are perspectives are perspectives are perspectives are processed with entourage,
modeled modeled with rendered with materials rendered with shadows and background.
components and light

Concept Project Title, Everything stated in 'A' Everything stated in ‘B' Everything stated in Everything stated in ‘D'
Board Project Background, + + ‘C’ +
(should be at Project Goal and Design Objectives, Conceptual + All iconography, images,
least 30%) Objectives Design Considerations, Development, Form or Site Analysis illustrations to support
Philosophy and Shape Finding ‘A’, “B’, ‘C’, and ‘D’;
Concept Rendering

Thesis Book Updated / corrected Updated / corrected Updated / corrected Updated / corrected Updated / corrected /
(should be at less than 30% of the less than 50% of the more than 50% of the more than 75% of the completed all
least 75%) book book book book requirements for the
Thesis Book

UST College of Architecture Thesis Program AY 2018-2019


ARCHITECTURE THESIS LOGBOOK Page 5 of 6

The Pontifical and Royal


University of Santo Tomas
Espana, Manila

COLLEGE OF ARCHITECTURE
THESIS PROGRAM

Certificate of Preliminary Endorsement


Original / Student Copy

This Certificate is hereby given to

___________________________________________

whose thesis entitled

_____________________________________________________________________

_____________________________________________________________________

_has been carefully evaluated and endorsed by the undersigned Thesis Adviser.

This further certifies that the student has successfully completed all the preliminary

requirements of the Architectural Design 10 course and is now eligible to proceed to

final phase of the Architectural Thesis Program.

This Certificate of Preliminary Endorsement is issued on

________________________.

_______________________________________
Thesis Adviser

UST College of Architecture Thesis Program AY 2018-2019


ARCHITECTURE THESIS LOGBOOK Page 6 of 6

The Pontifical and Royal


University of Santo Tomas
Espana, Manila

COLLEGE OF ARCHITECTURE
THESIS PROGRAM
C
U
T
Certificate of Preliminary Endorsement
H Duplicate / Adviser File Copy
E
R

This Certificate is hereby given to

____________________________________________

whose thesis entitled

_____________________________________________________________________

_____________________________________________________________________

has been carefully evaluated and endorsed by the undersigned Thesis Adviser.

This further certifies that the student has successfully completed all the preliminary

requirements of the Architectural Design 10 course and is now eligible to proceed to

final phase of the Architectural Thesis Program.

This Certificate of Preliminary Endorsement is issued on

________________________.

_______________________________________
Thesis Adviser

UST College of Architecture Thesis Program AY 2018-2019

You might also like