You are on page 1of 11

International Classic Composite Ltd.

(Dyein
Running Economic Batch Quantity analysis Report
"" Shift (Night), Date: 30 March 2022

Loading Fresh
M/C No Buyer Color 100% Capacity
Batch Qty. (Kg)

1 FH Black 200
2 Walbush WASH 200 360
3 Geonge Stone 400 303
4 HVP White 400 260
5 Geonge Green 600 454
6 B. Lader Black 600 480
7 Geonge Brown 800 620
8 B. Lader Grey 600 482
9 Geonge Blue 1000 795
10 B. Lader Navy 250
Total- 5050 3754

EBQ%
200%
180%
150% 76% 76% 80% 78%
65% 80%
100% 12%
50%
0%
1 2 3 4 5 6 7 8

Fair Apparels Ltd.(Dyeing Unit)


Running Economic Batch Quantity Analysis Report
"A" Shift (Night), Date: 15 December 2021

Loading Fresh
M/C No 100% Capacity
Batch Qty. (Kg)
1 250 124
2 400 265
3 1000 659
4 800 638
5 1200 995
6 600 495
7 250 202
8 120
9 100 85
10 1200 923
11 1600 1215
12 2000 1507
13 1000 894
14 600 330
15 600 330
16 250 116.5
Total- 11970 8778.5

EBQ%
100%
80%
60%
40% 80% 83% 83% 81% 85% 77% 76% 75% 89%
50% 66% 66% 42% 55% 55% 47%
20%
0%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
osite Ltd.(Dyeing Unit)
ntity analysis Report
March 2022

Loading Re-
EBQ With 100%
process Batch Remarks
Capacity
Qty.(Kg)

23 12% Re-Match
180% Normal Wash
76%
65%
76%
80%
78%
80%
80%
98 39% Re-Match
121 76%

80% 78% 80% 80%


39%

6 7 8 9 10

(Dyeing Unit)
tity Analysis Report
ecember 2021
Loading Re-
EBQ With 100%
process Batch Remarks
Capacity
Qty.(Kg)
50%
66%
66%
80%
83%
83%
81%
50 42% Re-Match
85%
77%
76%
75%
89%
55%
55%
47%
50 69%

% 77% 76% 75% 89%


55% 55% 47%

10 11 12 13 14 15 16
0 0 0 0 0
0

E BQ %

International Classic Compo


Running Economic Batch Qua
Date: 17/01/2023-

M/C No. Buyer Color 100% Capacity

1 Silk Green 200


2 Tesco purple 200
3 F.Ford Black 400
4 Silk Grey Mell 400
5 Tesco navy 600
6 STOP 600

7 B.lader black 800

8 B.L. Black 600


9 B.L. black 1000
10 B.L. Grey 250
11 STOP 1500
Total- 6550

EBQ%

90%
80%
70%
60%
50% 85%
40%
80% 80% 75%
65%
30%
20%
10%
0%
0
1 2 3 4 5 6
50% 85%
40%
80% 80% 75%
65%
30%
20%
10%
0%
0
1 2 3 4 5 6
0 0 0 0 0 0

1
EB Q%

assic Composite Ltd. (Dyeing Unit)


nomic Batch Quantity Analysis Report
Date: 17/01/2023- Shift- B
Loading Re-
Loading Fresh EBQ With 100%
process Batch
Batch Qty. (Kg) Capacity
Qty. (Kg)

160 80%
160 80%
261 65%
300 75%
510 85%
0%

596 75%

473 79%
872 87%
200 80%
0%
3532 0 54%

EBQ%

85% 79% 87% 80%


65% 75% 75%

0% 0%
4 5 6 7 8 9 10 11
85% 79% 87% 80%
65% 75% 75%

0% 0%
4 5 6 7 8 9 10 11
0 0 0

ng Unit)

Remarks

R/P

No Program from 2:00 PM

Stopped from 6.00 AM to 12.40 PM

No Program from 6.00 AM

0%

0%
11
0%

0%
11

hello@2023U2

You might also like