Resource Assignment Matrix

PLANT
Project manager
PO#

Supplier/Vendor/Contractor- SRG

Business Project Lead


Business Project Lead

Business Sys. Analyst


End User- KEMYA

Project Manager
3rd Party
Sr. No. Project Management and Requirements

Pre-bidding
1 Site Visit
2 Measurement of corroded cement lined spools
3 Prepare BOM
4 Study and verification of Isometric drawings as per site visit

Planning/ Post-PO
1 Procuring of Piping Material as per requirement
2 Prepare and submit elaborate procedure for pipe fabrication, cement lining, installation and ITP.
3 Pre-fabrication of pipe spools
4 Fabricate new cemented spool
5 Prepare and submit Safety plan, TRA and Rescue plan.
7
Preparation
1 Welding of pipe spool as per approved WPS and PQR
2 Cement lining of Pipe spools using Sulphate resistant Type V Cement (AWWA C205)
3 Sand Blasting and applying one coat of primer.
4 Assign POC personnel from end-user side to witness inspection/ repairs/ tests done by contractor
5 Blinding, Isolation and de-energizing of the pipeline.

Execution
1 Delivery of pipe spools to Kemya job site
2 Preparation of the area for hot work
3 Erection of scaffolding for pipe spool installation
4 Cutting and removal corroded cement-lined pipe at site
5 Edge preparation of cut end by grinder
6 Fit-up of pipe spools by sleeve method and applying pipe-joining compound.
7 Rigging work
8
Closing
1 Welding of sleeve with pipe spool.
2 Touch up painting on new weld joints
3 Housekeeping and site handover.
4 De-mobilization of manpower
5 De-blinding of pipeline system
6 Prepare Mechanical completion certificate and submit for signature

Support Equipment and Manpower


1 Mobilization of skilled and un-skilled manpower to end-user site.
2 Mobilize tools, tackles and equipment to end-user site.
3 Supervisors, Work Permit Recievers and Fire Watch
4 Site office
5 Diesel filling if needed.
6 Crane for all lifting works with crane operator
7 Scaffolding for pipe spool installation
8 QA/QC Supervisor/Engineer.
Inspection
1 Inspection of joints fit-up
2 final inspection of job
3 Visual inspection of cement lined pipe spools at contractor shop
4 Inspection of fit-up of spools
5 Inspection of equipments by 3rd Party.
6
Documentation
1 KEMYA approved Drawings, WPR, and PQR.
2 7 (seven) year Warranty period for Repair job.
3 Submission of detailed plan for Overhauling
4 Inspection certificate from 3rd party of equipment.
5 Prepare and submit TRA and Rescue Plan
6 detailed specific method list of SOW
7 QA/QC report of all the material, activities, etc.
Safety
1 Providing all the safety accessories to manpower
2 Provide FRC clothimng to Manpower
3 Safety orientation training to vendor manpower and ID's
4 Work permit reciever training to vendor manpower.
5 Regular Gas checks for H-C and %LEL.
Data Modeler
DBA
Data Staging Designer
Educator
Appl'n Developer
Tech/Security Architect
Tech Support Specialist
Data Staging Programmer
Data Steward
QA Analyst