You are on page 1of 1

Sl.

No: Raw water unloading Point Length widh Hight Volume Usage
areas
(CM) (CM) (CM) (Ltr.)
1 Front Gate 152.5 193 183 5500 Canteen hand wash and vessals washing
Gardaning near front compunt areas
2 AAC Company Gate 549 457.5 305 76500 Office over head tank
Wetdrawing old plant
Electrod plant process use
Old store opposite bathroom use
Unit -II Flux process use
Stone craft and gardaning use
3 Fine Drawinng Back side( Sloop Tank) 511 135 203.5 10000 Raw water
Over head Tank
RO feed water-> 2700 ltr/hr Ro Permeat 450
ltr/hr -> Reject2250 ltr/hr
--> Findrawing bathroom and Toilet DM plant for
MCL
--> Wirerod bathroom and Toilet Canteen
drinking water
--> MCL plant raw water use Chemical Lab DM
water
Softner plant ---> Wirerod coolimg tower
---> Wirerod Process
cooling
---> Finedrawing
process cooling
--->Finedrawing
cooling tower
--->Electrod cooling
tower
3 High corbon 348 152.5 244 12950 Highcorbon process
Cooling tower
Toilet and Bathroom
4 Spool Unit 191 518.5 335.5 33225 Spool Washing
Bathroom and toilet
5 Gents Hostel 183 104.5 74 1400 Company inside room people use

6 Ladies Hostel 366 183 183 12250 Bathroom and Toilet


7 Unit-I 4500 Drum 9 X 500 = 4500 Hand washing and
Gardaning

You might also like