You are on page 1of 6

USN 18CCT251

Second Semester M.Tech. Degree Examination, Dec.2019/Jan.2020


Building Cost and Quality Management

Time: 3 hrs. Max. Marks: 100


Note: Answer any FIVE full questions, choosing ONE full question from each module.
Module-1
2. Any revealing of identification, appeal to evaluator and /or equations written eg, 42+8 = 50, will be treated as malpractice.

1 a. Explain the estimation of earthwork in detail. (10 Marks)


b. Explain the concrete in foundation and masonry. (10 Marks)

OR
2 For the given plan, elevation and sectional elevation of the RCC framed building.
[Refer Fig.Q2(a)(i) and Fig.Q2(a)(ii)]
Important Note : 1. On completing your answers, compulsorily draw diagonal cross lines on the remaining blank pages.

a. Calculate the earthwork in excavation foundation quality earthwork in filling, sand filling
and cement concrete.
b. R.C.C. work quantity (20 Marks)

Module-2
3 For the given residential building use the drawings [Refer Fig.Q3(a)].
a. Calculate the first class brickwork below plinth level quantity
b. Calculate the first class brickwork above the plinth level quantity. (20 Marks)

OR
4 Explain the following tests on element.
a. Field testing and Fineness test.
b. Standard consistency test and setting time test. (20 Marks)

Module-3
5 a. Define arbitration. Explain different types of arbitration. (10 Marks)
b. Explain the measurement book and different points noted in it. (10 Marks)

OR
6 a. Briefly discuss regarding receipts, fictitious adjustments, accounting procedure of stores,
reserve limit of stocks and issue rate. (10 Marks)
b. Discuss the various powers of arbitrator and the steps involved in process of arbitration.
(10 Marks)

Module-4
7 Prepare a detailed estimate of the septic tank with soak pit for 25 acres from the given
drawings. [Refer Fig.Q7(a)]
a. Calculate the quantities of earthwork, cement concrete, brickwork, cement plaster.
b. Detailed estimate of the rate of all the calculated quantities. (20 Marks)

OR
8 Prepare a detailed estimate of the given sanitary and water supply works of buildings from
the given plan. [Refer Fig.Q8(a)]
a. Estimation of sanitary work
b. Estimation of water supply work. (20 Marks)
1 of 6
18CCT251

Module-5
9 a. Explain the purpose of valuation. (10 Marks)
b. Define the municipal taxes, scrap value, salvage value, market value and book value.
(10 Marks)

OR
10 a. Explain the different methods adopted in valuation. (10 Marks)
b. Explain the hand mixing and machine mixing specifications of cement concrete 1 : 2 : 4.
(10 Marks)

Fig.Q2(a)(i)

2 of 6
18CCT251

Fig.Q2(a)(ii)

3 of 6
18CCT251

Fig.Q3(a)

4 of 6
18CCT251

Fig.Q7(a)

5 of 6
18CCT251

Fig.Q8(a)

*****

6 of 6

You might also like