Pcol *1.20
=n
Qall
Pcol → Column Load
ﺣﻤﻞ اﻟﻌﻤﻮد
Qall → allowable pile capacity
ﻗﺪرة ﺗﺤﻤﻞ اﻟﺨﺎزوق
ﯾﺘﻢ اﻟﻀﺮب ﻓﻰ ١.٢٠ﺑﺪل ١.١٠وذﻟﻚ ﻻﺧﺬ ﺗﺄﺛﯿﺮ اﻟﻌﺰم ﻓﻰ اﻻﻋﺘﺒﺎر
4. Check forces in piles:
اﯾﺠﺎد اﻟﺤﻤﻞ اﻟﻔﻌﻠﻰ اﻟﻮاﻗﻊ ﻋﻠﻰ اﻟﺨﻮازﯾﻖ.
C.G of Piles C.G of Column
Mx My
ey
N
ex
114
Nt Mx * y My * x
Fp = ± ± > Qall
n ∑ Y 2
∑ X 2
∑X 2
→ X ﻣﺠﻤﻮع ﻣﺮﺑﻌﺎت اﻟﻤﺴﺎﻓﺔ ﺑﯿﻦ اﻟﺨﻮازﯾﻖ وﻣﺮﻛﺰ اﻟﺨﻮازﯾﻖ ﻓﻰ اﺗﺠﺎه
∑Y 2
→ Y ﻣﺠﻤﻮع ﻣﺮﺑﻌﺎت اﻟﻤﺴﺎﻓﺔ ﺑﯿﻦ اﻟﺨﻮازﯾﻖ وﻣﺮﻛﺰ اﻟﺨﻮازﯾﻖ ﻓﻰ اﺗﺠﺎه
1 2 3 1 2 3
Y2
Y3
Y1
X1 X3
2
Y4
Y6
Y5
X4 X6
4 5 6 4 5 6
6. stresses
Pcol Pcol
I1 = = (ton / m2 )
Apunch ( a + d ) * (b + d )
punchﺗﻜﻮن ﻣﻮزﻋﺔ ﻋﻠﻰ ﻣﺴﺎﺣﺔ ال
I 2 = γ RC * t RC (ton / m2 )
ﺗﻜﻮن ﻣﻮزﻋﺔ ﻋﻠﻰ ﻛﺎﻣﻞ ﻣﺴﺎﺣﺔ اﻟﮭﺎﻣﺔ
I 3 = FP (ton ) (Cg of pile) ﺗﻜﻮن ﻣﺮﻛﺰة ﻋﻨﺪ
115
0.40
C.G of Piles
C.G of Column
1.33
4.00
4.80
1.33
e=0.50m
x
X=2.00m
1.33
0.40
1.00
2.00
C.G of Piles
Y
My
3.00
2.00
1.00
1 2 3 4 5 6
117
Ex 3 : Exam 2007
1,6 1,6
N t = 600 * 1 . 1 = 660 t 4 4 4
5*1.6 = 8 m
0,6
3 3 3 3 3
1,2
5 * 1 .6 + 5 * 1 .6 * 2 + 3 * 1 .6 * 3
y = / 24
+ +
3,4
2 2 2 2 2
3 * 1 . 6 * 4 3 * 1 . 6 * 5
3
y == 3 . 4 m 1 1 1 1 1 Datum
2,6
2,6
6 * 1 .6 + 6 * 1 .6 * 2 Datum
x = / 24
4 * 1.6 = 6.4 m
+ 3 * 1 . 6 * 3 + 3 * 1 . 6 * 4
c.g piles ﻓﻲ اﻟﺑداﯾﺔ ﯾﺗم ﺗﺣدﯾد ﻣﻛﺎن
x = 2 .6 m
M x = 600 * 0 . 4 = 240 m .t
∑ y 2 = 5 * 3 .4 2
+ 5 * 1 .8 2 + 5 * 0 .2 2
+ 3 * 1 .4 2
+ 3 * 3 2 + 3 * 4 .6 2
= 170 . 56
660 240 * 3 . 4
F1 = + = 32 . 28 ton
24 170 . 56
660 240 * 1 . 8
F2 = + = 3 0.03 ton
24 170 . 56
660 240 * 0 . 2
F3 = + = 27 . 78 ton
24 170 . 56
660 240 * 1 . 4
F4 = − = 2 5.53 ton
24 170 . 56
660 240 * 3 . 0
F5 = − = 2 3.28 ton
24 170 . 56
660 240 * 4 . 6
F6 = − = 21 . 03 ton
24 170 . 56
118
0.60
150 *1.10
n= = 3.3
50
0.80
Use ⇒ n = 4.00 Piles
Pile cap arrangement : 0.30
2 Mx 1 CG of Column
2.40
2.40
e=0.2 m
e=0.2 m
CG of piles
3 4
2.40 2.40
Nt Mx * Y
Fpile = +
n ∑ Y2
∑Y 2
= {4 * (0.6) 2 } = 1.44
150 + 11.52 30 * 0.60
F1 = + = 52.88 > Qall ⇒ Unsafe
4 1.44
Increase No of piles to 5
0.6
2 *1.044
y= = 0.4176 3 Mx 2 1
5
y
e y = 0.4176 − 0.40 = 0.0176
1.6
M x = P * e y = 150 * 0.0176 = 2.64 t.m 4 5
1.2
Own ( pile cap) = γ R.C * A * t
3.8 + 1.9
A = (3.8 * 0.60 ) +
1.9
*1.6 = 6.84 m 2
2
Own ( pile cap) = 2.50 * 6.84 * 0.80 = 13.68 ton
Nt Mx * Y
Fpile = +
n ∑ Y2
∑Y = {3 * (0.4176) 2 }{2 * (1.044 − 0.4176 ) } = 1.31
2 2
1.0
0.6
3 2 1
Stresses :
1.5
Pcol 150
I1 = = = 100 t / m2
1.6
Check of shear :
Qshear
τ sh =
0.87 * B * d
for section 1 - 1
A1 = 0.50 * 0.30 * 050 = 0.075
1.9 + 2.6
A2 = * 0.90 + 0.50 * 0.70 * 0.60 = 2.235
2
Qshear = (35.58 + 33.89) − (2 * 2.235) − (100 * 0.075) = 57.5 t
57.50 *1000
τ sh = = 3.63Kg / cm2 < 8.00 Kg / cm2 ⇒ OK Safe
0.87 * 260 * 70
3.8
0.7
1.0
0.6
0.6
3 2 1
1.5
2.6
0 .9
1.6
0.5
A1
1.9
A 4 5
2
0.3
1.9
for section 2 - 2
A1 = 0.70 *1 = 0.70
3.8 + 3.4
A 2 = (3.8 * 0.60) + * 0.30 = 3.36
2
Qshear = (3 * 35.58) − (2 * 3.36) − (100 * 0.70) = 30.02
30.02 *1000
τ sh = = 1.44 Kg / cm2 < 8.00 Kg / cm2 ⇒ OK Safe
0.87 * 340 * 70
3.8
3.8
1.0
0.3 0.6
0.6
A 2
3 2 1
1.5
3.4
1.6
4 5
0.7
A 1
1.0
1.9
121
3.8
1.7
0.35 0.35
0.6
1.1
0.7 3 2 1
1.5
1.5
2.2
1.6
A 1
A 4 5
2
0.5
0.8
1.9
3.8
0.6
3 2 1
1.5
0.35
2.9
0.2
1.6
0.4
A1
A 4 5
0.8
2
1.0
1.9
1.9
122
5.9 * (10)5
70 = K1 * → K1 = 1.55 ⇒ K2 = 1832
290
M 2 − 2 5.9 * (10)5
As = = = 4.6cm2
K2 * d 1832 * 70
As 4.6
As / m' = = = 151cm2
B1 2.9
Use ⇒ Asmin = 6Φ16 / m'
Check of Bond :
Qshear @ M
τ bond = ≤ 10 Kg / cm 2
0.87 * d * ∑ O
For section (1 - 1) :
Qshear = {(35.58) + (33.89)} − (2 * 3.02 ) − (100 * 0.525 ) = 10.93t.m
10.93 *1000
τ bond = = 2.02 Kg / cm2 < 10 Kg / cm 2 ⇒ OK Safe
0.87 * 70 * π *1.60 * 8 * 2.2
For section (2 - 2) :
Qshear = (2 * 33.89 ) − (2 *1.92 ) − (100 * 0.35 ) = 28.94 ton.m
28.94 *1000
τ bond = = 4.4 Kg / cm2 < 10 Kg / cm 2 ⇒ OK Safe
0.87 * 70 * π *1.60 * 6 * 2.9
123
Qult = QS + Qt
QS (1) = α * CU * As = 0.35 * 40 * π * 0.40 * (16 − 1.5)
QS (1) = 255.1 KN
QS (2 ) = α * CU * As = 0.35 * 70 * π * 0.40 * (4 − 0.40)
QS (2 ) = 110.83 KN
π * 0.402
Qt = NC * CU * At = 9 * 70 * = 79.17 KN
4
Qult = 255.1 + 110.83 + 79.17 = 445.1 KN
Qult 445.1
Qall = = = 222.55 KN
FS 2
124
4 3 2 1
e x =0.25 m
3.20
My
4 3 2 1
0.85
0.60 1.80
4 3 2 1
1.20 1.20 1.20
4.40
Stresses :
Pcol Pcol
I1 = =
A( punch) (a + d ) * (b + d )
180
I1 = = 99.2 ton / m2
(0.30 + 0.82) * (0.80 + 0.82)
I 2 = γ R.C * t = 2.50 * 0.90 = 2.25 t / m2
125
Design for moment :
For section (1 - 1)
M 1−1 = (3 * 13.9 * 1.9) + (3 * 16.40 * 0.70) − ( 2.25 * 2.3 * 3.2 * 1.15)
− (99.2 * 1.62 * 0.41 * 0.205) = 81.11 t.m 2.3
81.11 * (10) 5
82 = K1 * → K1 = 0.52 4 3 2 1
320 0.7
⇒ K 2 = 1832 1.9
3.2
1.62
M 1−1 81.11 * (10) 5 4 3 2 1
As = = = 53.99 cm2
K2 * d 1832 * 82
0.41
As 53.99
As / m' = = = 16.87 cm2 1.12
B1 3 .2 4 3 2 1
Use ⇒ As = 9Φ16 / m'
For section (2 - 2)
M 2− 2 = ( 21.4 + 18.9 + 16.4 + 13.9) * 0.80 − ( 2.25 * 4.4 * 1.2 * 0.60)
− (99.2 * 1.12 * 0.41 * 0.205) = 40 t.m
40 * (10) 5 4 3 2 1
82 = K1 * → K1 = 0.86
440
⇒ K 2 = 1832
1.62
M 1−1 40 * (10) 5 4 3 2 1
0.41
As = = = 26.63 cm2
K 2 * d 1832 * 82
0.8
As 26.63
As / m' = = = 6.05cm2
1.2
1.12
B1 4.4 4 3 2 1
Use ⇒ As min = 6Φ16 / m'
4.4
126
Check of Bond :
Qshear @ M
τ bond = ≤ 10 Kg / cm2
0.87 * d * ∑ O
For section (1 - 1)
Qshear = (3 *13.9) + (3 *16.40) − (2.25 * 2.3 * 3.2)
− (99.2 *1.62 * 0.41) = 8.45 t.m
8.45 *1000
τ bond = = 0.81Kg / cm2 p 10 Kg / cm2 ⇒ OK Safe
0.87 * 82 * π *1.60 * 9 * 3.20
For section (2 - 2)
Qshear = ( 21.4 + 18.9 + 16.4 + 13.9) − ( 2.25 * 4.4 *1.2)
− (99.2 *1.12 * 0.41) = 13.17 t.m
13.17 *1000
τ bond = = 1.39 Kg / cm2 p 10 Kg / cm2 ⇒ OK Safe
0.87 * 82 * π *1.60 * 6 * 4.4
Check of Shear :
For section (1 - 1)
Qshear = (3 * 21.4) + (3 * 18.90) − ( 2.25 * 1.8 * 3.2) − (99.2 * 1.62 * 0.41) = 42.05 t.m
Qshear 42.05 * 1000
τ sh = = = 1.84 Kg / cm2
0.87 * B * d 0.87 * 320 * 82
τ sh < 8.00 Kg / cm2 ⇒ OK Safe
For section (2 - 2)
Qshear = ( 21.4 + 18.9 + 16.4 + 13.9) 1.8
− ( 2.25 * 0.60 * 4.4) = 64.66 t.m
4 3 2 1
Qshear 64.66 * 1000 1.12
τ sh = =
0.87 * B * d 0.87 * 440 * 82
3.2
4 3 2 1
⇒ OK Safe
0.41
4 3 2 1
0.6
4.4
127
Solution:
Property
Line
P1 = 160 ton P2 = 320 ton
6.00
Datum
C.G of Col C.G of piles
1.50
Y1
ﯾﻘﻀﻞ ﻋﻨﺪ اﻋﺎدة رص اﻟﺨﻮازﯾﻖ ﻟﻠﻌﻤﻮد اﻻول ان ﯾﺘﻢ اﻟﺤﻔﺎظ ﻋﻠﻰ ﻗﯿﻤﺔ ) (eﻣﻊ ﺿرورة ان ) ( 2φ ≤ S ≤ 3φ
C.G of Col C.G of piles
0.5 * S + 0.50 - 0.40 = e
0.5 * S + 0.10 = 0.535 0.40
S = 0.87m ≤ 2φ ⇒ Not allowed
S
e
Use ⇒ S = 2φ = 1.0m 0.5*S+0.50
S
C.G of Col C.G of piles
2.5
2.0
e
2.0
4.0
e = 0.50 + 0.50 − 0.40 = 0.60 m
∑M )( B = 0.00 P = 160 ton
6.00
P2 = 320 ton
ﻻ ﯾﻮﺟﺪ اﺟﮭﺎد punchﻋﻠﻰ اﻟﻘﻮاﻋﺪ ﺑﺴﺒﺐ وﺟﻮد ﻛﻤﺮة اﻟﺸﺪاد وﻟﻜﻦ ﯾﻤﻜﻦ اﺳﺘﺨﺪام ھﺬا اﻟﻘﺎﻧﻮن ﻻﯾﺠﺎد ﺳﻤﻚ ﺗﻘﺮﯾﺒﻰ
ﻟﻠﮭﺎﻣﺎت
4.00
2.50
1.00
112.24
17.8 17.8 y
0
0
x
94.42
88.8
M=79.96 t.m
M=91.35 t.m
132
Q0 = 0.00
Q1 = −160 − (4.5 * 0.8) + (93.4 * 0.80) = −88.88 ton
Q2 = −88.88 − (4.5 *1.2) + (93.4 *1.20) = +17.80 ton
Q3 = 17.8 − (5.625 *1.25) + (81.18 *1.25) = +112.24 ton
Q4 = +112.24 − 320 − (5.625 *1.50) + (81.18 *1.50) = −94.42 ton
Q5 = −94.42 − (5.625 *1.25) + (81.18 *1.25) ≈ 0 ton
Cheak of shear :
Qshear 112 .24 *1000
τ= = = 15 > 8 Kg / cm2 ⇒ Use Stirrups
0.87 * b * d 0.87 * 50 *172
q
q sus = τ − c = 15 − 4 = 11 Kg / cm
2
use stirrups Φ12 with four branches
As * Fs 4 * (1.13) * 2000
q sus = ⇒ 11 =
b*S 50 * S
S = 16.4
use ⇒ 7Φ12 / m' ( four branches)
0.25
2.0
21.91 *10 5
80 = K1 ⇒ K1 = 0.76 ⇒ K 2 = 1832 1 1
200
0.8
M 21.91 *10 5
As = = = 14.95 Cm 2
K2 * d 1832 * 80
As 14.95
As / m' = = = 7.47 Cm 2
2.0
B 2
use ⇒ As (min) = 6Φ16 / m'
80 = K1 ⇒ K1 = 0.57 ⇒ K 2 = 1832
400 2 2
5
1.00
M 76.68 *10
As = = = 52.31 Cm 2
K2 * d 1832 * 80
As 52.31
As / m' = = = 13.07 Cm 2
B 4
use ⇒ As (min) = 7Φ16 / m'
134
ﻻﺣﻆ:
• ﯾﺘﻢ وﺿﻊ ﺣﺪﯾﺪ ) (Asminﻓﻰ اﻻﺗﺠﺎه اﻻﺧﺮ ﻟﻠﮭﺎﻣﺔ..
• ﯾﺗم وﺿﺢ ﺣدﯾد اﻧﻛﻣﺎش ﻓﻰ ﻛﻣرة اﻟﺷداد
Details of reinforcement:
2.50
1 1
0.50
2.00
2.00
1.50 1.50
4.00
1.80
0.90
Sec 1-1
135
• ﻓﻰ ﺣﺎﻟﺔ وﺟﻮد ﻋﻤﻮد ﺟﺎر ﺣﯿﺚ ﯾﺘﻢ رﺑﻂ ﻋﻤﻮ اﻟﺠﺎر ﻣﻊ اﻗﺮب ﻋﻤﻮد ﻟﮫ داﺧﻞ اﻟﻤﻨﺸﺄ وﯾﺸﺘﺮط ان ﺗﻜﻮن اﻟﻤﺴﺎﻓﺔ ﺑﯿﻦ
. ﻣﺘﺮ٥.٠٠ اﻟﻌﻤﻮدﯾﻦ ﻻ ﺗﺰﯾﺪ ﻋﻦ
.• ﻓﻰ ﺣﺎﻟﺔ ﺗﺪاﺧﻞ اﻻﺳﺎﺳﺎت ﻟﻠﮭﺎﻣﺎت اﻟﻤﻨﻔﺼﻠﺔ
EX 1 :
Design a suitable foundation for the two columns shown in figure using circular
piles with maximum allowable ver cal capacity =55 ton and the pile diameter is
= 50 cm.
Draw the details of Reinforcement.
neighbor
3.50
Solution:
The suitable type of foundation Combined footing
1 - Calculation of the value and position of resultant :
R = P1 + P2 = 175 + 250 = 425ton
∑M @( a ) = 0.00
P2 * 3.75 250 * 3.50
X= = = 2.058 m ≈ 2.06 m
R 425
136
a
3.50
2 − Number of piles required :
R * 1.10 425 * 1.10
=n = = 8.5
Qall 55
Take → n = 10 piles
ﯾﻔﻀﻞ ان ﺗﻨﻄﺒﻖ اﻟﻤﺤﺼﻠﺔ ) (Rﻣﻊ ) (C.G of pilesﻣﻊ اﻻﻟﺘﺰام ﺑﺸﺮوط اﻟﻤﺴﺎﻓﺔ ﺑﯿﻦ اﻟﺨﻮزاﯾﻖ ) (Sﺣﺘﻰ ﻧﺘﻔﺎدى
وﺟﻮد ﻋﺰوم ﻧﺘﯿﺠﺔ اﻟﺘﺮﺣﯿﻞ
ﯾﺠﺐ ان ﯾﺒﺘﻌﺪ اول ﺻﻒ ﻣﻦ اﻟﺨﻮازﯾﻖ ﻋﻦ اﻟﺠﺎر ﻣﺴﺎﻓﺔ ﻻ ﺗﻘﻞ ﻋﻦ ﻗﻄﺮ اﻟﺨﺎزوق )(Ф
ﻋﺪد اﻟﺨﻮازﯾﻖ اﻟﻜﻠﻰ= ١٠ﺧﻮازﯾﻖ وﻟﺬﻟﻚ ﯾﺘﻢ اﯾﺠﺎد اﻟﻤﺴﺎﻓﺔ ) (Sﺑﺤﯿﺚ ﯾﻨﻄﺒﻖ ﻣﻜﺎن اﻟﻤﺤﺼﻠﺔ ﻣﻊ ﻣﺮﻛﺰ
اﻟﺨﻮزاﯾﻖ ﻛﺎﻻﺗﻰ:
X + 0.30 = 2S + φ
2.06 + 0.30 = 2S + 0.50 C.G of two columns
⇒ S = 0.93 < 2φ
0.50 S S
0.30 X
اﻟﻤﺴﺎﻓﺔ ﺑﯿﻦ اﻟﺨﻮزاﯾﻖ اﻗﻞ ﻣﻦ اﻟﻤﺴﻤﻮح ﺑﮫ وﻟﺬﻟﻚ ﯾﺘﻢ رص اﻟﺨﻮزاﯾﻖ ﺑﺎﻗﻞ ) (Sﺣﺘﻰ ﯾﻜﻮن اﻟﺘﺮﺣﯿﻞ اﻗﻞ ﻣﺎ ﯾﻤﻜﻦ.
Use S = 2φ = 1.0m
137
0.50
1 2 3 4 5
2.00
1.00
2.36 e=0.14 m
1 2 3 4 5
0.50
5.00
0.50
0.55
1 2 3 4 5
0.55
2.00
0.40
0.40
1.50
1.50
1.00
0.60 0.80
0.55
1 2 3 4 5
0.50
1.15 1.90
5.00
for Column 1
τ=
Pcol
=
(175 − (2 * 51.45))*1000 = 1.72
Kg / cm2 < 8.0 Kg / cm2 ⇒ Safe
{2 * (a + ) + (b + d )} * d
d {( 2 * 115 ) + (150 )} * 110
2
for Column 2
τ=
Pcol
=
(250 − (2 * 42.525) − (2 * 39.55))*1000 = 1.14 Kg / cm2 < 8.0 Kg / cm2 ⇒ Safe
2 *{( a + d ) + (b + d )} * d 2 *{190 + 150} *110
139
6- Design of section:
Mmax واﯾﺟﺎد ﻗﯾﻣﺔSFD ﯾﺗم اﻟﺗﻌﺎﻣل ﻣﻊ اﻻﺗﺟﺎه اﻟطوﻟﻰ ﺑﺎﻋﺗﺑﺎرھﺎ ﻛﻣرة وﯾﺗم رﺳم
175 t 250 t
5.00
-I 2 =6 t/m'
-
1
M Upper = (175 *1.2 ) + * 6 *1.5 2 − (2 * 51.45 *1.0 ) = 113 .85 t.m
2
1
M Lower = * 6 *1.2 2 − (2 * 39.55 * 0.70 ) = −51.05 t.m
2
M 113.85 *10 5
d = K1 * ⇒ 110 = K1 * ⇒ K1 = 0.46 ⇒ K 2 = 1832
b 200
M 113.85 * 10 5
As = = = 56.48cm2
K2 * d 1832 *110
56.49
As / m' = = 28.24
2.00
use ⇒ As = 9Φ 20 / m'
7 − Check of shear
Q 179.92 *103
q= = = 9.4 > 8Kg / cm2 ⇒ Unsafe
0.87 * d * b 0.87 *110 * 200
179.92 *103
8= ⇒ d = 129
0.87 * d * 200
t = 140 cm ⇒ d = 130 cm
d/2=0.65m d/2=0.65m
2.00
1 1 2 2
0.30
0.30
0.80
0.80
1.25 2.10
5.00
141
For Sec 1 - 1
I 2 = γ * t = 2.5 * 1.4 = 3.5 t/m 2
M 1−1 = (51 .45 * 0.30 ) − (3.5 * 1 .25 * 0 .8 * 0 .4 ) = 14 .03 ton .m
M 14 .03 * 10 5
d = K1 * ⇒ 130 = K1 * ⇒ K1 = 1 .22 ⇒ K 2 = 1832
b 125
M 14 .03 * 10 5
As = = = 5 .89 cm 2
K 2 * d 1832 * 130
5.89
As / m' = = 4.71
1.25
use ⇒ As (min) = 6Φ16 / m'
For Sec 2 - 2
9-Details of reinforcement:
0.50
2.00
1.00
1 1
0.50
1.60 1.05 2.35
5.00
1.10
Sec 1- 1