CONSTRUCTION COST ESTIMATE

PLTM NAGAJAYA 2 X 3 MW
Item Review Harga Biaya
Jenis Pekerjaan Type of work Satuan Keterangan
No. Volume Satuan ( Rp ) ( Rp )
C Pekerjaan Bendung dan Pengambilan Weir and intake
C.1 Pekerjaan Bendung Weir
14 Pekerjaan rumah pintu & reiling (Flushing) Intake construction and steel work
ls (flushing) - -
a Rumah Pintu
STEEL STRCUTRE
Kolom Pipe D3" kg 83,33
Balok Pipe D3" kg 87,83
Balok C100x50x5 kg 122,76
Sambungan (Asumsi 15%) kg 44,09
ATAP ZINCALUM m2 13,88
LISTPLANK m 14,93
b. Railling, t = 80 cm m 19,00

Sub Total - -
C.2 Pekerjaan Intake Intake work
8 Rumah dan pintu reiling Intake construction and steel work
Ls - Intake to sandtrap/waterway - -
a Rumah Pintu
STEEL STRCUTRE
Kolom Pipe D3" kg 178,35
Balok Pipe D3" kg 187,89
Balok C100x50x5 kg 231,00
Sambungan (Asumsi 15%) kg 89,59
ATAP ZINCALUM m2 26,13
LISTPLANK m 21,47
b. Railling, t = 80 cm m 10,00

Sub Total - -

D Pekerjaan Kolam Pengendap Pasir Sandtrap


12 Pekerjaan rumah pintu & reiling Intake house and railing work ls
a Rumah Pintu
STEEL STRCUTRE
Kolom Pipe D3" kg 83,33
Balok Pipe D3" kg 92,06
Balok C100x50x5 kg 89,93
Sambungan (Asumsi 15%) kg 39,80
ATAP ZINCALUM m2 10,08
LISTPLANK m 12,87
b. Railling, t = 80 cm m 8,00
Sub Total - -
F Pekerjaan Bak Penenang & Pelimpah
12 Saringan, rumah Pintu & Relling Screen, Intake house & railing LS
a Rumah Pintu
STEEL STRCUTRE
Kolom Pipe D3" kg 39,28
Balok Pipe D3" kg 0,00
Balok C100x50x5 kg 257,97
Sambungan (Asumsi 15%) kg 257,97
ATAP ZINCALUM m2 0,00
LISTPLANK m 1,00
b. Railling, t = 80 cm m 1,00
Sub Total - -
H Pekerjaan Gedung Sentral
11 Struktur Rangka Baja Steel-structure LS
Kolom H Beam 350x350x12x19 kg 6.165,00
Kolom WF 200x100x5,5x8 kg 857,33
Rel Girder WF 588x300x12x20 kg 9.060,00
Balok Ikat WF 400x200x8x13 kg 567,60
Balok WF 200x100x5,5x8 kg 1.278,00
Balok WF 150x75x5x7 kg 840,00
Purlin CNP 200x75x20x3.2 kg 6.229,44
Cladding CNP 200x75x20x3.2 kg 3.913,98
Rafter WF 200x100x5.5x8 kg 2.481,45
Ikatan Angin D.16 kg 187,96
Sagrod D.12 kg 184,62
Sambungan Baja (Asumsi 15%) kg 4.764,80
Clading dinding m2 491,80
Atap Zincalum m2 744,96

Sub Total - -

Total Biaya Pekerjaan Sipil dan Jaringan = 0,00