1. TS visit
To reduce NCs highlighted for production line 2. Ms Loo spotcheck
3. Mr Puon spotcheck
9 during visit, spotcheck by management and Improvement Carried Out case 8 6 4 2 0 15.0%
ranking related 4. Dato Ahmad CCS
5. My Nyana HK ranking
Or others been tabulated in excel
10 0 0.0000
11 0 0.0000
12 0 0.0000
HR Administrator: To customize the objective and measure set, please proceed to the Data Management Folder Total Distribution Points(D) 0 Total Work
Priority: Maximum - 60 Minimum - 10 100.0% Performance Rating(W) 3.2250
C
Designed And Developed By Top Foresight
þ Action To Be Taken
TOTAL = 54.84
HELP PACKING
TOTAL = 30 HOURS
ours and minimum 15 technical/functional training hours
To achieve other contribution/ value added tasks as assigned and minimum of 5 CEH hours to the organization & co
REWORK AT PACKING
TOTAL :
6 HOURS
WORKERS TRAINING
• WORK INSTRUCTION OF ALKALINE TANK DRY WASH
• WORK INSTRUCTION OF ACID TANK DYR WASH
• WORK INSTRUCTION OF CONGULANT TANK DRY
• WORK INSTRUCTION OF LATEX TANK DRY WASH
• WORK INSTRUCTION OF CONGULANT NOZZLE SERVISE
• WORK INSTRUCTION OF COTTON RAG CHANGING
• WORK INSTRUCTION OF WET TANK CLEANING
TOTAL =
7 HOURS
• WORK INSTRUCTION OF COTTON RAG CHANGING
• WORK INSTRUCTION OF WET TANK CLEANING
TOTAL =
7 HOURS
hours to the organization & community.
To maintain/improve factory ranking within the Top 10th category out of 35 factories for FY
Rank Target
Sep-21 22 10
Oct-21 21 10
Nov-21 16 10
Dec-21 19 10
Jan-22 19 10
Feb-22 9 10
Mar-22 3 10
Apr-22 4 10
May-22 2 10
Jun-22 6 10
Jul-22 6 10
Aug-22 1 10
AVERAGE 8
ory out of 35 factories for FY2022
To maintain overall PSI for non Premium at 85% and above for FY2022
MONTH PSI
Sep-21 50.98%
Oct-21 62.39%
Nov-21 86.15%
Dec-21 85.00%
Jan-22 100%
Feb-22 70.65%
Mar-22 70.73%
Apr-22 78.79%
May-22 82.76%
Jun-22 85.71%
Jul-22 90.48%
Aug-22 90.16%
AVERAGE = 79%
To maintain 0 accident case in production department (lineboy) for FY2022
MONTH CASE
Sep-21 0
Oct-21 0
Nov-21 0
Dec-21 0
Jan-22 0
Feb-22 0
Mar-22 0
Apr-22 0
May-22 0
Jun-22 0
Jul-22 0
Aug-22 0
AVERAGE = 0
To maintain overall PSI for Premium at 80% and above for FY2022
MONTH PSI
Sep-21 75.51%
Oct-21 77.23%
Nov-21 82.09%
Dec-21 65.10%
Jan-22 100%
Feb-22 84.80%
Mar-22 83.22%
Apr-22 77.71%
May-22 91.01%
Jun-22 93.88%
Jul-22 89.24%
Aug-22 85.52%
AVERAGE = 84%
To have a minimum of 3 substantial/impactful research projects including project of automation, compute
BEFORE
MODIFY TAP SINK
BEFORE AFTER
• SIMPLE DESIGN
• NEATER
• CLEANER
• STRONGER
AFTER
JOHNSON SCREEN FILTER FOR PRE LEACHING TAN
AFTER
PROBLEM STATEMENT
AFERLOOKS
NEATLOOKS
ORDERLY
ER FOR PRE LEACHING TANK FILTRATION
OBJECTIF
F40 PRODUCTION LINES WATER • TO MINIMIZE THE WATER USAGE AND HIGH GAS
TLY, AT LEAST TWICE A DAY TO CONSUMPTION DUE TO FREQUENT TANK WATER CHANGING
ULATION
• TO ESTABLISH A RELIABLE AND REPRODUCIBLE FILTRATION
NGING WILL INCREASE WATER SYSTEM AT PRE-LEACHING TANK
IN EACH PRODUCTION LINE
• TO ENSURE CONTINUOUS WATER SUPPLY FOR GOOD GLOVE
QUALITY AND PREVENT THE SLUDGE DEFECTS WHICH MAY
LEAD TO CUSTOMER'S COMPLAINS
CT A COST
To reduce NCs highlighted for production line during visit, spotcheck by management and ranking related
CASE DUE
MONTHS BEEADING CASE DUE PLT CASE DUE CHANGE CT
ISSUE
Jun-22 2 0 0
Jul-22 2 0 1
Aug-22 2 0 0
Total 6 0 1