You are on page 1of 34

Top Glove Sdn Bhd

B. Business Unit Performance . Muhammad Halim B01


Set-up 3 to 10 KPIs to measure Business Unit Performance
Objective [1] Key Performance Indicator (KPI) [2] Dist [5] Weight % [6] Actual Performance Rating [8]
Measure [3] Remarks Target Setting [4] Target [7]
10 20 30 40 50 60
Actual [9] Final [10]
If you need to edit the objective statement after the selection, press F2 (Include Other Details) Poor Below Meet Stretch High
(Include Measuring Instrument) Unit ([5]*D/100) (1.2.3.4.5) ([6]x[9])
1 54 4 0.1000
To achieve individual 45 training hours, inclusive
of minimum 5 eLearning hours and minimum 15 Training hours hour 35 40 45 50 55 2.5%
technical/functional training hours

2 To achieve other contribution/ value added tasks 30 10 0.2500


as assigned and minimum of 5 CEH hours to the Value Added tasks task 10 15 20 25 30 2.5%
organization & community.
3 12 2 0.2500
To maintain/improve factory ranking within the Factory ranking, technical
Ranking 16 13 10 7 4 12.5%
Top 10th category out of 35 factories for FY2022 scorecard

4 To maintain overall PSI for non Premium at 85% 79 2 0.3000


Production Output % 75 80 85 90 95 15.0%
and above for FY2022
5 To maintain 0 accident case in production 0 5 0.6250
department (lineboy) for FY2022 Accident case case 4 3 2 1 0 12.5%
6 To maintain overall PSI for Premium at 80% and 84 3 0.4500
above for FY2022 Passing rate % 75 80 85 90 95 15.0%

7 To have a minimum of 3 substantial/impactful 5 5 0.7500


research projects including project of automation,
computerization, digitalization, IOT, AI or/and Improvement Carried Out case 1 2 3 4 5 15.0%
any related project conducted.

8 To maintain 0 case of small beading/no beading 7 5 0.5000


including second grade and torn glove caused by
low latex level during changing latex hosepipe Response Time Number 4 3 2 1 0 10.0%
start from June FY2022

9 1
1. TS visit
To reduce NCs highlighted for production line 2. Ms Loo spotcheck
3. Mr Puon spotcheck
9 during visit, spotcheck by management and Improvement Carried Out case 8 6 4 2 0 15.0%
ranking related 4. Dato Ahmad CCS
5. My Nyana HK ranking
Or others been tabulated in excel
10 0 0.0000
11 0 0.0000

12 0 0.0000

HR Administrator: To customize the objective and measure set, please proceed to the Data Management Folder Total Distribution Points(D) 0 Total Work
Priority: Maximum - 60 Minimum - 10 100.0% Performance Rating(W) 3.2250
C
Designed And Developed By Top Foresight

Half Yearly Performance Review


þ Areas Of Improvement :

þ Action To Be Taken

Designed And Developed By Top Foresight Page 3


To achieve individual 45 training hours, inclusive of minimum 5 eLearning hours and minimum 15 technic

TOTAL = 54.84

HELP PACKING
TOTAL = 30 HOURS
ours and minimum 15 technical/functional training hours
To achieve other contribution/ value added tasks as assigned and minimum of 5 CEH hours to the organization & co

REWORK AT PACKING

TOTAL :

6 HOURS

WORKERS TRAINING
• WORK INSTRUCTION OF ALKALINE TANK DRY WASH
• WORK INSTRUCTION OF ACID TANK DYR WASH
• WORK INSTRUCTION OF CONGULANT TANK DRY
• WORK INSTRUCTION OF LATEX TANK DRY WASH
• WORK INSTRUCTION OF CONGULANT NOZZLE SERVISE
• WORK INSTRUCTION OF COTTON RAG CHANGING
• WORK INSTRUCTION OF WET TANK CLEANING
TOTAL =
7 HOURS
• WORK INSTRUCTION OF COTTON RAG CHANGING
• WORK INSTRUCTION OF WET TANK CLEANING
TOTAL =
7 HOURS
hours to the organization & community.
To maintain/improve factory ranking within the Top 10th category out of 35 factories for FY

Rank Target
Sep-21 22 10
Oct-21 21 10
Nov-21 16 10
Dec-21 19 10
Jan-22 19 10
Feb-22 9 10
Mar-22 3 10
Apr-22 4 10
May-22 2 10
Jun-22 6 10
Jul-22 6 10
Aug-22 1 10
AVERAGE 8
ory out of 35 factories for FY2022
To maintain overall PSI for non Premium at 85% and above for FY2022

To maintain overall PSI at 85% and above for FY2022

MONTH PSI
Sep-21 50.98%
Oct-21 62.39%
Nov-21 86.15%
Dec-21 85.00%
Jan-22 100%
Feb-22 70.65%
Mar-22 70.73%
Apr-22 78.79%
May-22 82.76%
Jun-22 85.71%
Jul-22 90.48%
Aug-22 90.16%
AVERAGE = 79%
To maintain 0 accident case in production department (lineboy) for FY2022

MONTH CASE
Sep-21 0
Oct-21 0
Nov-21 0
Dec-21 0
Jan-22 0
Feb-22 0
Mar-22 0
Apr-22 0
May-22 0
Jun-22 0
Jul-22 0
Aug-22 0
AVERAGE = 0
To maintain overall PSI for Premium at 80% and above for FY2022

MONTH PSI
Sep-21 75.51%
Oct-21 77.23%
Nov-21 82.09%
Dec-21 65.10%
Jan-22 100%
Feb-22 84.80%
Mar-22 83.22%
Apr-22 77.71%
May-22 91.01%
Jun-22 93.88%
Jul-22 89.24%
Aug-22 85.52%
AVERAGE = 84%
To have a minimum of 3 substantial/impactful research projects including project of automation, compute

BEFORE
MODIFY TAP SINK

BEFORE AFTER

PROBLEM STATEMENT OBJECTIF

● EASY TO DAMAGE BECAUSE OF THEIR MATERIAL ● MORE THERAPY AND CLEAN


● NEED TO REPLACE MANY TIME ● NOT EASILY DAMAGED
● IT TAKES LONG TIME TO REPLACE A NEW ONE ● LONG LASTING
● SAFER

TROLY SLUDGE CONGULANT


PROBLEM STATEMENT FUNCTION
● UNORGANISED • SAFERLOOKS
● UNTIDY • NEATLOOKS
● USED BARREL • ORDERLY
● SLUDGE IN PLASTIC IS NOT FULL BECAUSE THE BARREL IS
SMALL

STAND RUBBISH BIN FOR REST AREA


FUNCTION

• SIMPLE DESIGN

• NEATER

• CLEANER

• STRONGER

• THE RUBBISH DOES NOT FALLS EASILY IF THERE HAVE STAND


PLACE
g project of automation, computerization, digitalization, IOT, AI or/and any related project conducted.

AFTER
JOHNSON SCREEN FILTER FOR PRE LEACHING TAN

AFTER

PROBLEM STATEMENT

• PRE-LEACHING TANK IN F40 PRODUCTION LINES WAT


ARE CHANGED FREQUENTLY, AT LEAST TWICE A DAY TO
REDUCE SLUDGE ACCUMULATION
F • FREQUENT WATER CHANGING WILL INCREASE WATE
AND GAS CONSUMPTION IN EACH PRODUCTION LINE
THERAPY AND CLEAN
ASILY DAMAGED
LASTING

PLASTIC CPE FOR PROJECT A COST


SAVING
NCTION

AFERLOOKS

NEATLOOKS

ORDERLY
ER FOR PRE LEACHING TANK FILTRATION

OBJECTIF
F40 PRODUCTION LINES WATER • TO MINIMIZE THE WATER USAGE AND HIGH GAS
TLY, AT LEAST TWICE A DAY TO CONSUMPTION DUE TO FREQUENT TANK WATER CHANGING
ULATION
• TO ESTABLISH A RELIABLE AND REPRODUCIBLE FILTRATION
NGING WILL INCREASE WATER SYSTEM AT PRE-LEACHING TANK
IN EACH PRODUCTION LINE
• TO ENSURE CONTINUOUS WATER SUPPLY FOR GOOD GLOVE
QUALITY AND PREVENT THE SLUDGE DEFECTS WHICH MAY
LEAD TO CUSTOMER'S COMPLAINS

CT A COST
To reduce NCs highlighted for production line during visit, spotcheck by management and ranking related

" HOUSEKEEPING INSPECTION BY MR NYANA "

MONTH NC's HIGHLIGHTED


Sep-21 3
Oct-21 0
Nov-21 0
Dec-21 0
Jan-22 0
Feb-22 1
Mar-22 1
Apr-22 2
May-22 1
Jun-22 0
Jul-22 0
Aug-22 0
TOTAL 8
d ranking related
To maintain 0 case of small beading/no beading including second grade and torn glove caused by low latex level du

CASE DUE
MONTHS BEEADING CASE DUE PLT CASE DUE CHANGE CT
ISSUE

Jun-22 2 0 0
Jul-22 2 0 1
Aug-22 2 0 0
Total 6 0 1

All Total case = 7 case


caused by low latex level during changing latex hosepipe start from June FY2022