Professional Documents
Culture Documents
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V 220V DC MAIN 1 DISTRIBUTION 220KV CHU SE SUBSTATION + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A1-1
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Table of contents
Page Description
=DC+R/A2-2 DIMENSION
=DC+RP/B-18 METTER
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
Table of contents + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A1-2
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Table of contents
Page Description
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
Table of contents + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A1-3
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Table of contents
Page Description
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
Table of contents + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A1-4
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
V V
I> I>
PROCESSOR
A A
=FUSE+BOX
=FUSE+BOX
V A A V
F1 F2
3P 3P
100A 100A
DISTRIBUTION 220VDC
Unauthorized duplication prohibited without written consent
COMPUTER SYSTEM
F:6A R R F:6A
220 DC DISTRIBUTION
27/59 27/59
BOARD No.1 MCCB MCCB
3P
DC1 100A
-FDC11 -FDC21
3P
100A
M AUTO CHANGEOVER M
ON OFF ON OFF
SEL-2440
SHUNT A A SHUNT
V V
M
F:6A
F:6A
SUPERVISOR
RS485 3P RS485
220VDC BB1-150A
100A
DC2 220VDC BB2-150A
SEL-2440
FDC117 FDC116 FDC115 FDC114 FDC113 FDC112 FDC111 FDC110 FDC109 FDC108 FDC107 FDC106 FDC105 FDC104 FDC103 FDC102 FDC101 FDC201 FDC202 FDC203 FDC204 FDC205 FDC206 FDC207 FDC208 FDC209 FDC210 FDC211 FDC212 FDC213 FDC214 FDC215 FDC216 FDC217
2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P ON OFF 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P
16A 16A 16A 16A 16A 16A 16A 16A 16A 16A 25A 32A 32A 32A 50A 50A 63A 63A 50A 50A 32A 32A 25A 16A 16A 16A 16A 16A 16A 16A 16A 16A 16A 16A
TRIP CIRCUIT 220kV D04+RP
LIGHTING SYSTEM
SUPPLY SIGNAL 1,
SUPPLY SIGNAL 1,
SUPPLY SIGNAL 1,
SUPPLY SIGNAL 1,
BCU D02+RP
BCU D04+RP
BCU E02+RP
BCU E09+RP
METTER M1
220kV D04
110kV E09
110kV E02
110kV E09
SYSTEM
220kV D02
SYSTEM
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
NOTE: 1. INTERLOCK: 2. AUTO CHANGOVER :
* FDC00 CLOSED = (FDC11 CLOSED & FDC21 TRIP) ^ (FDC21 CLOSED & FDC11 TRIP )
ON ON ON
* FDC21 CLOSED = (FDC11 TRIP & FDC00 CLOSED & F27 / 59 - (2) NOT TRIP).
-FDC11
* FDC11 CLOSED = (FDC21 TRIP & FDC00 CLOSED & F27 / 59 - (1) NOT TRIP).
-FDC21
3. AUXILIARY POWER FOR CONTROL, PLC, FAULT SIGNAL, LAMP STATUS,
-FDC00 TRIP SIGNAL, MOTORIZED OF MCCB, etc: 220VDC
4. ALL MCB, MCCB RATINGS AND QUANTITY WILL BE CORRECTED WITH EQUIPMENT IN DETAIL DESIGN BY ATS
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
DC SINGLE LINE DIAGRAM + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A2-1
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
BOTTOM VIEW
800 800
24-Ø13x20
Front CSE_DC Indoor
SPECIFICATION:
1000
798
894
* Enclosure material : Tole 2.0 mm
* Indoor electrosatic power coating
Rear * Painting color : RAL 7032
695 695
* Protection Degree : IP 41
Unauthorized duplication prohibited without written consent
720 720
H11 H2 1
Ø 1 2 Ø 1 2
SWBP SWAM
HT1 1 HT21
PR0 0
2100
HT0 0
2200
PG00
2200
100
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
DIMENSION + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A2-2
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
CSE_DC Indoor
SCHWEITZER
ENGINEERING
DPAC SCHWEITZER
ENGINEERING
DPAC
LABORATO RIES LABORATO RIES
PU LLMA N, WA SH IN GT ON USA
SEL -2440 PU LLMA N, WA SH IN GT ON USA
SEL -2440
DISCRETE DISCRETE
PRO GRAMMABL E PRO GRAMMABL E
AUTOMAT ION AUTOMAT ION
CON TROL LER CON TROL LER
1A 1B 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 6 1A 1 B 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 1 4 15 1 6
ENA BL ED LN K 100 ENA BL ED LN K 100
LAMP ALA RM TX 200 LAMP ALA RM TX 200
TE ST T E ST
MODE RX 300 MODE RX 300
Unauthorized duplication prohibited without written consent
CSE_DC1 CSE_DC2
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
DC CUBICLE LAYOUT + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A2-3
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
Parts list
25-MAY-20
11 =DC+RP/B-1 -F27_1 3UG4633-1AL30 The single phase Voltage monitoring relay SIE
12 =DC+RP/B-2 -F27_2 3UG4633-1AL30 The single phase Voltage monitoring relay SIE
13 =DC+RP/B-1 -F59_11 3UG4633-1AL30 The single phase Voltage monitoring relay SIE
14 =DC+RP/B-1 -F59_12 3UG4633-1AL30 The single phase Voltage monitoring relay SIE
15 =DC+RP/B-2 -F59_21 3UG4633-1AL30 The single phase Voltage monitoring relay SIE
16 =DC+RP/B-2 -F59_22 3UG4633-1AL30 The single phase Voltage monitoring relay SIE
22 =DC+RP/B-1 -FDC00 1SDA066460R1 Direct action motor operator - MOD: MOD 220...250V AC/DC ABB/EU
23 =DC+RP/B-1 -FDC00 1SDA066431R1 Auxiliary contacts - AUX: AUX-C 1Q+1SY 250V ABB/EU
29 =DC+RP/B-1 -FDC11 1SDA066460R1 Direct action motor operator - MOD: MOD 220...250V AC/DC ABB/EU
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-1
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
Parts list
25-MAY-20
30 =DC+RP/B-1 -FDC11 1SDA066431R1 Auxiliary contacts - AUX: AUX-C 1Q+1SY 250V ABB/EU
32 =DC+RP/B-2 -FDC21 1SDA066460R1 Direct action motor operator - MOD: MOD 220...250V AC/DC ABB/EU
33 =DC+RP/B-2 -FDC21 1SDA066431R1 Auxiliary contacts - AUX: AUX-C 1Q+1SY 250V ABB/EU
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-2
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
Parts list
25-MAY-20
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-3
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
Parts list
25-MAY-20
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-4
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
Parts list
25-MAY-20
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-5
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
Parts list
25-MAY-20
150 =DC+RP/B-11 -H1 APN9505 Led: whilte, HxD: 200x100 mm, P: max40W, sockets: E27 Viet nam
151 =DC+RP/B-11 -H2 APN9505 Led: whilte, HxD: 200x100 mm, P: max40W, sockets: E27 Viet nam
152 =DC+RP/B-1 -H11 YW1P-2EQM3R YW control unit dome full voltage LED red IDEC /Japan
153 =DC+RP/B-2 -H21 YW1P-2EQM3R YW control unit dome full voltage LED red IDEC /Japan
Unauthorized duplication prohibited without written consent
154 =DC+RP/B-39 -HA59_1 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
155 =DC+RP/B-39 -HA59_2 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
157 =DC+RP/B-39 -HT00 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
158 =DC+RP/B-39 -HT11 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
159 =DC+RP/B-39 -HT21 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
160 =DC+RP/B-39 -HT27_1 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
161 =DC+RP/B-39 -HT27_2 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
162 =DC+RP/B-39 -HT59_1 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
163 =DC+RP/B-39 -HT59_2 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-6
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
Parts list
25-MAY-20
194 =DC+RP/B-45 -SWAM CA4-A721-600-FS2 Switch 2 position 4 contact without OFF 60ø Switching K&N/NewZealand
195 =DC+RP/B-45 SWBP CA4-A720-600-FS2 Switch 2 position 2 contact without OFF 60ø Switching K&N/NewZealand
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-7
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
Parts list
25-MAY-20
208 =DC+RP/B-45 -XM00 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
209 =DC+RP/B-45 -XM1 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
210 =DC+RP/B-45 -XM2_C 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
211 =DC+RP/B-45 -XM2_L 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
Unauthorized duplication prohibited without written consent
212 =DC+RP/B-45 -XM3 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
213 =DC+RP/B-45 -XM4 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
214 =DC+RP/B-45 -XM5 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
215 =DC+RP/B-45 -XM6 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
216 =DC+RP/B-45 -XM7 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
217 =DC+RP/B-45 -XM8 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
218 =DC+RP/B-45 -XM11 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
219 =DC+RP/B-45 -XM21 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-8
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
-TBP1
-TBN1
1 1 2
=CHARGED1 1M
10A -XM1
440VDC /B-45.1
1F
14 11 /B-10.4 -F27_1 -F59_11 -F59_12
12
A1 A1 A1 x1
14 11 /B-20.5
-H11
12 >U< >U< >U< RED x2
98 95 /B-20.6 1 3 5
96
-FDC11 M A2 A2 A2 2F
100A -XM1
250VDC
/B-45.1
18kA I> I> I> 2M
2 4 6
3 1 3 1 12 12 12
14 11 /B-10.3
-FDC1 -FVM11
12
10A 10A
440VDC 4 2 440VDC 4 2
14 11 /B-10.4
12
5M 6M
-XM2_C
/B-45.6
5F 6F
DC1_XVMN1
DC1_XVMP1
XDC1N
XDC1P
B-9.2 /
B-9.2 /
B-18.1 /
B-18.1 /
-XM1
1 3M 3F DC1_XAMP1
/B-18.1
/B-45.1
-SHUNT
-XM1
2 4M 4F DC1_XAMN1
/B-18.1
/B-45.1
14 11 /B-20.3
12
98 95 /B-20.4
96
-FDC00
5 6 DC1_DC2_XB12N
/B-2.1
I>
DC1_XB1N 4 3 4
B-3.1 /
I>
-TBN1
DC1_XB1P 4 1 2 DC1_DC2_XB12P
B-3.1 / /B-2.1
I>
-TBP1
100A
M 250VDC
18kA
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
INCOMING 220V DC1 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-1
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
-TBP2
-TBN2
1 1 2
=CHARGED2 5M
10A -XM1
440VDC /B-45.1
5F
14 11 /B-10.6 -F27_2 -F59_21 -F59_22
12
A1 A1 A1 x1
-H21
>U< >U< >U< RED x2
A2 A2 A2 6F
14 11 /B-20.8
12 -XM1
98 95 /B-20.9 1 3 5 /B-45.1
6M
96
-FDC21 M
100A
250VDC
18kA I> I> I>
2 4 6 3 1 3 1
14 11 /B-21.4 14 11 /B-21.5 14 11 /B-21.7
Unauthorized duplication prohibited without written consent
14 11 /B-10.5
-FDC2 -FVM21 12 12 12
12
10A 10A
440VDC 4 2 440VDC 4 2
14 11 /B-10.7
12
7M 8M
-XM2_C
/B-45.6
7F 8F
DC2_XVMN2
DC2_XVMP2
XDC2N
XDC2P
B-9.2 /
B-9.2 /
B-18.6 /
B-18.6 /
-XM1
1 7M 7F DC2_XAMP2
/B-18.6
/B-45.1
-SHUNT2
-XM1
2 8M 8F DC2_XAMN2
/B-18.6
/B-45.1
DC1_DC2_XB12N 4 DC2_XB2N
B-1.9 / /B-6.1
-TBN2
DC1_DC2_XB12P 4 DC2_XB2P
B-1.9 / /B-6.1
-TBP2
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
INCOMING 220V DC2 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-2
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC1_XB1N 5 6 7 8 9 10 DC1_XB1N_1
B-1.1 / /B-4.1
3 1 3 1 3 1 3 1 3 1 3 1
DC1_MK2_XB1N
DC1_MK4_XB1N
DC1_MK2_XB1P
DC1_MK4_XB1P
DC1_INV_XB1N
DC1_INV_XB1P
XIN_CT201
XIN_CT202
XIN_CT203
XIN_CT204
XIN_CT205
XIN_CT206
XIP_CT201
XIP_CT202
XIP_CT203
XIP_CT204
XIP_CT205
XIP_CT206
B-14.9 /
B-14.9 /
=DLL_D02/B-4.2 /
=DLL_D02/B-4.2 /
B-14.9 /
B-14.9 /
=DLL_D04/B-4.7 /
=DLL_D04/B-4.8 /
B-14.9 /
B-14.9 /
B-14.9 /
B-14.9 /
B-14.9 /
B-14.9 /
=INV/B-2.2 /
=INV/B-2.3 /
B-14.9 /
B-14.9 /
DLL_D02-MK2 DLL_D04-MK4 SPARE =INV
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB1 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-3
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC1_XB1N_1 11 12 13 14 15 16 DC1_XB1N_2
B-3.10 / /B-5.1
3 1 3 1 3 1 3 1 3 1 3 1
DC1_D02_XR1_N1
DC1_D04_XR1_N1
DC1_D02_XS1_N1
DC1_D04_XS1_N1
DC1_D02_XR1_P1
DC1_D04_XR1_P1
DC1_INV_XB1N_1
DC1_D02_XS1_P1
DC1_D04_XS1_P1
DC1_INV_XB1P_1
XIN_CT2010
XIN_CT2011
XIN_CT2012
XIP_CT2010
XIP_CT2011
XIP_CT2012
XIN_CT207
XIN_CT208
XIN_CT209
XIP_CT207
XIP_CT208
XIP_CT209
=INV/B-2.7 /
=INV/B-2.7 /
B-14.9 /
B-14.9 /
B-14.9 /
B-14.9 /
=DLL_D02/B-1.1 /
=DLL_D02/B-1.1 /
B-14.9 /
B-14.9 /
=DLL_D04/B-1.10 /
=DLL_D04/B-1.10 /
B-14.9 /
B-14.9 /
=DLL_D02/B-2.1 /
=DLL_D02/B-2.1 /
B-14.9 /
B-14.9 /
=DLL_D04/B-2.10 /
=DLL_D04/B-2.10 /
B-14.9 /
B-14.9 /
=INV =DLL_D02 =DLL_D04 =DLL_D02 =DLL_D04
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB1 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-4
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC1_XB1P_2 -TBP1 13 14 15 16 17 17
B-4.10 /
DC1_XB1N_2 13 14 15 16 17 17
B-4.10 /
3 1 3 1 3 1 3 1 3 1
E09_DC_XR1_N1
E09_DC_XS1_N1
E09_DC_XR1_P1
E09_DC_XS1_P1
XI1_ISO6851
XI2_ISO6851
XIN_CT2013
XIN_CT2014
XIN_CT2015
XIN_CT2016
XIN_CT2017
XIP_CT2013
XIP_CT2014
XIP_CT2015
XIP_CT2016
XIP_CT2017
DC_XR1N
DC_XS1N
DC_XR1P
DC_XS1P
=ELL_E02/B-1.1 /
=ELL_E02/B-1.1 /
B-15.9 /
B-15.9 /
=ELL_E09/B-1.10 /
=ELL_E09/B-1.10 /
B-15.9 /
B-15.9 /
=ELL_E02/B-2.1 /
=ELL_E02/B-2.1 /
B-15.9 /
B-15.9 /
=ELL_E09/B-2.10 /
=ELL_E09/B-2.10 /
B-15.9 /
B-15.9 /
B-15.9 /
B-15.9 /
B-12.5 /
B-12.7 /
=ELL_E02 ELL_E09 =ELL_E02 =ELL_E09
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB1 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-5
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC2_XB2P 5 6 7 8 9 10 DC2_XB2N_1
B-2.9 / /B-7.1
3 1 3 1 3 1 3 1 3 1 3 1
DC2_MKE02_XB1N
DC2_MKE09_XB1N
DC2_MKE02_XB1P
DC2_MKE09_XB1P
DC2_INV_XB2N_1
DC2_INV_XB2P_1
DC2_INV_XB2N
DC2_INV_XB2P
-XDC 1 2
XIN_CT2018
XIN_CT2019
XIN_CT2020
XIN_CT2021
XIN_CT2022
XIN_CT2023
XIP_CT2018
XIP_CT2019
XIP_CT2020
XIP_CT2021
XIP_CT2022
XIP_CT2023
B-16.9 /
B-16.9 /
=ELL_E02/B-4.2 /
=ELL_E02/B-4.2 /
B-16.9 /
B-16.9 /
=ELL_E09/B-4.7 /
=ELL_E09/B-4.8 /
B-16.9 /
B-16.9 /
B-16.9 /
B-16.9 /
=INV/B-2.4 /
=INV/B-2.5 /
B-16.9 /
B-16.9 /
=INV/B-2.9 /
=INV/B-2.9 /
B-16.9 /
B-16.9 /
ELL_E02-MK ELL_E09-MK =CH48 =INV =INV
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB2 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-6
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC2_XB2N_1 11 12 13 14 15 16 DC2_XB2N_2
B-6.10 / /B-8.1
3 1 3 1 3 1 3 1 3 1 3 1
DC2_D02_XR2_N2
DC2_D04_XR2_N1
DC2_D02_XS2_N2
DC2_D04_XS2_N1
DC2_D02_XR2_P2
DC2_D04_XR2_P1
DC2_D02_XS2_P2
DC2_D04_XS2_P1
XIN_CT2024
XIN_CT2025
XIN_CT2026
XIN_CT2027
XIN_CT2028
XIN_CT2029
XIP_CT2024
XIP_CT2025
XIP_CT2026
XIP_CT2027
XIP_CT2028
XIP_CT2029
B-16.9 /
B-16.9 /
B-16.9 /
B-16.9 /
=DLL_D02/B-1.1 /
=DLL_D02/B-1.1 /
B-16.9 /
B-16.9 /
=DLL_D04/B-1.10 /
=DLL_D04/B-1.10 /
B-16.9 /
B-16.9 /
=DLL_D02/B-2.1 /
=DLL_D02/B-2.1 /
B-16.9 /
B-16.9 /
=DLL_D04/B-2.10 /
=DLL_D04/B-2.10 /
B-16.9 /
B-16.9 /
=DLL_D02 =DLL_D04 =DLL_D02 =DLL_D04
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB2 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-7
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC2_XB2P_2 -TBP2 13 14 15 16 17 18
B-7.10 /
DC2_XB2N_2 13 14 15 16 17 18
B-7.10 /
3 1 3 1 3 1 3 1 3 1
E09_DC_XR2_N1
E09_DC_XS2_N1
E09_DC_XR2_P1
E09_DC_XS2_P1
XDCN_DC_M2
XI1_ISO6852
XI2_ISO6852
XDCP_DC_M2
XIN_CT2030
XIN_CT2031
XIN_CT2032
XIN_CT2033
XIN_CT2034
XIP_CT2030
XIP_CT2031
XIP_CT2032
XIP_CT2033
XIP_CT2034
DC_XR2N
DC_XS2N
DC_XR2P
DC_XS2P
=ELL_E02/B-1.1 /
=ELL_E02/B-1.1 /
B-17.9 /
B-17.9 /
=ELL_E09/B-1.10 /
=ELL_E09/B-1.10 /
B-17.9 /
B-17.9 /
=ELL_E02/B-2.1 /
=ELL_E02/B-2.1 /
B-17.9 /
B-17.9 /
=ELL_E09/B-2.10 /
=ELL_E09/B-2.10 /
B-17.9 /
B-17.9 /
=M1/B-1.2 /
=M1/B-1.3 /
B-17.9 /
B-17.9 /
B-13.5 /
B-13.7 /
=ELL_E02 ELL_E09 =ELL_E02 =ELL_E09 =M1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB2 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-8
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
=AC
/=AC/B-13.1
/=AC/B-13.2
-KAT
XDC1P 13 14
XDCP_DC_AC
XDCN_DC_AC
B-1.4 /
/B-9.2
-KAT
XDC2P 21 22
B-2.4 /
/B-9.2
Unauthorized duplication prohibited without written consent
-FDC
3 4 -XDC 1 2 3 4 5 6 7 8 9 10
1 2 11 12 13 14 15 16 17 18 19 20
A1
-KAT 10A
440VDC
A2
XDC_U1_N
XDC_U1_P
XDC_N
XDC_P
-KAT
XDC1N 43 44
B-1.4 /
B-10.1 /
B-10.1 /
B-19.2 /
B-19.2 /
/B-9.2
-KAT
XDC2N 31 32
B-2.4 /
/B-9.2
13 14 /B-9.3
21 22 /B-9.3
31 32 /B-9.3
43 44 /B-9.3
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
POWER SUPPLY DC + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-9
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
/B-9.6
/B-9.6
XDC_N
XDC_P
-XM2_L
4M 4F
/B-45.5
5M 5F
/B-45.5
3 1 3 1 3 1 3 1 3 1
XN_ISO1
XN_ISO2
XP_ISO1
XP_ISO2
XN_R1
XN_R2
XP_R1
XP_R2
XS_N
XS_P
B-22.4 /
B-22.4 /
B-24.4 /
B-24.4 /
B-12.2 /
B-12.2 /
B-13.2 /
B-13.2 /
B-11.1 /
B-11.4 /
14 11 /B-10.8 14 11 /B-10.8 14 11 /B-11.2 14 11 /B-11.6 14 11 /B-11.3
12 12 12 12 12
14 11 /B-11.5
12
=AC
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC1 -F11 -FVM11 -FDC2 -F21 -FVM21 -FR1 -FR2
/B-1.4 11 /B-1.5 11 /B-1.5 11 /B-2.4 11 /B-2.5 11 /B-2.5 11 /B-10.1 11 /B-10.3 11
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
POWER SUPPLY DC + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-10
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
AC =INV
XS_P XS_N
B-10.7 / B-10.7 /
/ =AC/B-12.7
/ =AC/B-12.7
/=INV/B-1.9
/=INV/B-1.9
XSP_CH1 XSN_AC
B-42.5 / B-42.5 /
-XS 1 -XS 21
XSP_CH2
AC1_DC_XCSN
AC1_DC_XBSL
AC1_DC_INV_XBSL
AC1_DC_INV_XCSN
B-42.5 /
2 22
XSP_DC_AC XSP_F2759 XSN_LED
=AC/B-2.3 / /B-21.1 /B-39.1
3 23
AC XSP_C XSN_K
/B-26.1 /B-20.2
4 24
XSP_BP XSN_FDC00
/B-27.6 /B-36.3
5 25
XSP_VM XSN_VM -WACDC_2 1 2
/B-18.1 /B-18.1
6 26
XSP_DOOR XSN_IO1
/B-28.5 /B-26.1 -XAC 1 3 2 4
7 27
XSP_FDC00_IND XSN_IO2
/B-20.3 /B-30.1
Unauthorized duplication prohibited without written consent
8 28
XSP_FDC11_IND
/B-20.5
9 29
XSP_FDC21_IND
/B-20.8
10 30
XSP_BCU
/B-36.3
11
XSP_SWAM
/B-27.7
12
XSP_TRIP_FAC
/B-42.5
13
XSP_FDC1X_OFF 1 3
/B-30.1
14 11 /B-11.4
14 -FAC
XSP_FDC2X_OFF 10A
12
/B-34.2 2 4
230VAC
15
XSP_FDC00
/B-36.5
16
17
18
19
20 1M
-XM8
/B-45.9
1F
3 2 21 21
-XM2_L -HG %rF -LS2 -LS1
XSP_MCB_F 1M 1F /B-28.5 /B-28.5
B-10.9 / L 22 22
/B-45.5
X1 X1 X1
12 14 12 14 12 14 12 14 12 14 -R1 -H2 -H1
-FISO1 -FS -FAC -FR2 -FISO2 X2 X2 X2
/B-10.4 11 /B-10.7 11 /B-11.9 11 /B-10.3 11 /B-10.6 11 2F
-XM8
/B-45.9 2M
-XM2_L
XSP_MCB_F_1 2M 2F
B-10.9 /
/B-45.5
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
POWER SUPPLY DC,AC + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-11
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XP_ISO1 XP_ISO1_EDS1
B-10.4 / /B-14.2
XN_ISO1 XN_ISO1_EDS1
B-10.4 / /B-14.2
XI1_ISO6851 XI2_ISO6851
/B-5.9 /B-5.9
PE
BENDER IS0685_1
/B-40.6
Unauthorized duplication prohibited without written consent
ON
IT-System
EDS MENU
OK
PGH ON >20 M TEST
SERVICE
DATA INFO
ALARM 1
R(an) 40k/10k
ALARM 2
X1
I1 I2 I3 A B
A_EDS2_ISO
B-15.4 /
B_EDS2_ISO
B-15.4 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION ISO685-1 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-12
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XP_ISO2 XP_ISO2_EDS3
B-10.6 / /B-16.2
XN_ISO2 XN_ISO2_EDS3
B-10.6 / /B-16.2
XI1_ISO6852 XI2_ISO6852
/B-8.9 /B-8.9
PE
BENDER IS0685_2
/B-40.8
Unauthorized duplication prohibited without written consent
ON
IT-System
EDS MENU
OK
PGH ON >20 M TEST
SERVICE
DATA INFO
ALARM 1
R(an) 40k/10k
ALARM 2
X1
I1 I2 I3 A B
A_EDS4_ISO2
B-17.4 /
B_EDS4_ISO2
B-17.4 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION ISO685-2 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-13
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XIP_CT201
/B-3.3
XIP_CT202
/B-3.4
XIP_CT203
/B-3.5
XIP_CT204
/B-3.7
XIP_CT205
/B-3.8
XIP_CT206
/B-3.10
XP_ISO1_EDS1 XP_EDS1_EDS2 XIP_CT207
B-12.5 / /B-15.2 /B-4.3
XIP_CT208
/B-4.4
XN_ISO1_EDS1 XN_EDS1_EDS2 XIP_CT209
B-12.5 / /B-15.2 /B-4.5
XIP_CT2010
/B-4.7
XIP_CT2011
/B-4.8
XIP_CT2012
/B-4.10
XIN_CT2012
Unauthorized duplication prohibited without written consent
I /B-4.10
XIN_CT2011
K
BENDER -EDS440_1
/B-4.8
XIN_CT2010
/B-4.7
XIN_CT209
/B-4.6
XIN_CT208
/B-4.4
XIN_CT207
/B-4.3
XIN_CT206
/B-3.10
XIN_CT205
/B-3.8
XIN_CT204
/B-3.7
XIN_CT203
/B-3.6
XIN_CT202
/B-3.4
XIN_CT201
/B-3.3
ON CHANEL
1 2 3 4 5 6
MENU
PGH ON
7 8 9 10 11 12
X1 T3 T4 23 24
I1 I2 A B
A_EDS1_EDS2
/B-15.3
B_EDS1_EDS2
/B-15.3
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION EDS440-1 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-14
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XIP_CT2013
/B-5.3
XIP_CT2014
/B-5.4
XIP_CT2015
/B-5.5
XIP_CT2016
/B-5.7
XIP_CT2017
/B-5.8
XP_EDS1_EDS2
B-14.4 /
XN_EDS1_EDS2
B-14.4 /
I
K
BENDER -EDS440_2
XIN_CT2017
/B-5.8
XIN_CT2016
/B-5.7
XIN_CT2015
/B-5.6
XIN_CT2014
/B-5.4
XIN_CT2013
/B-5.3
ON CHANEL
1 2 3 4 5 6
MENU
PGH ON
7 8 9 10 11 12
X1 T3 T4 23 24
I1 I2 A B
A_EDS1_EDS2 A_EDS2_ISO
B-14.4 / /B-12.3
B_EDS1_EDS2 B_EDS2_ISO
B-14.4 / /B-12.3
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION EDS440-2 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-15
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XIP_CT2018
/B-6.3
XIP_CT2019
/B-6.4
XIP_CT2020
/B-6.5
XIP_CT2021
/B-6.7
XIP_CT2022
/B-6.8
XIP_CT2023
/B-6.10
XP_ISO2_EDS3 XP_EDS3_EDS4 XIP_CT2024
B-13.5 / /B-17.2 /B-7.3
XIP_CT2025
/B-7.4
XN_ISO2_EDS3 XN_EDS3_EDS4 XIP_CT2026
B-13.5 / /B-17.2 /B-7.5
XIP_CT2027
/B-7.7
XIP_CT2028
/B-7.8
XIP_CT2029
/B-7.10
XIN_CT2018
Unauthorized duplication prohibited without written consent
I /B-6.3
XIN_CT2019
K
BENDER -EDS440_3
/B-6.4
XIN_CT2020
/B-6.6
XIN_CT2021
/B-6.7
XIN_CT2022
/B-6.8
XIN_CT2023
/B-6.10
XIN_CT2024
/B-7.3
XIN_CT2025
/B-7.4
XIN_CT2026
/B-7.6
XIN_CT2027
/B-7.7
XIN_CT2028
/B-7.8
XIN_CT2029
/B-7.10
ON CHANEL
1 2 3 4 5 6
MENU
PGH ON
7 8 9 10 11 12
X1 T3 T4 23 24
I1 I2 A B
A_EDS3_EDS4
/B-17.3
B_EDS3_EDS4
/B-17.3
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION EDS440-3 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-16
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XIP_CT2030
/B-8.3
XIP_CT2031
/B-8.4
XIP_CT2032
/B-8.5
XIP_CT2033
/B-8.7
XIP_CT2034
/B-8.8
XP_EDS3_EDS4
B-16.4 /
XN_EDS3_EDS4
B-16.4 /
I
K
BENDER -EDS440_4
XIN_CT2034
/B-8.8
XIN_CT2033
/B-8.7
XIN_CT2032
/B-8.6
XIN_CT2031
/B-8.4
XIN_CT2030
/B-8.3
ON CHANEL
1 2 3 4 5 6
MENU
PGH ON
7 8 9 10 11 12
X1 T3 T4 23 24
I1 I2 A B
A_EDS3_EDS4 A_EDS4_ISO2
B-16.4 / /B-13.3
B_EDS3_EDS4 B_EDS4_ISO2
B-16.4 / /B-13.3
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION EDS440-4 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-17
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20 DC1_485_15
B-19.9 /
DC1_485_14
B-19.9 /
14 15 14 15
-V1 -V2
1 3 13 9 10 1 3 13 9 10
Unauthorized duplication prohibited without written consent
DC1_XVMP1 PE DC2_XVMP2 PE
B-1.5 / B-2.5 /
-GND -GND
DC1_XVMN1 DC2_XVMN2
B-1.6 / B-2.6 /
-XM2_C
XSP_VM 1M 1F
B-11.3 /
/B-45.6
XSN_VM 2M 2F
B-11.6 /
/B-45.6
14 15 14 15
-A1 -A2
5 6 13 9 10 5 6 13 9 10
DC1_XAMP1 PE DC2_XAMP2 PE
B-1.7 / B-2.7 /
-GND -GND
DC1_XAMN1 DC2_XAMN2
B-1.7 / B-2.7 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
METTER + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-18
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
=SVR
/
T1_DC1_SVR
XDC_U1_P
B-9.6 /
XDC_U1_N
B-9.7 /
-U1
Unauthorized duplication prohibited without written consent
POWER SUPLY
DC1_485_15
/B-18.1
DC1_485_14
/B-18.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION METTER + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-19
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
/B-11.3
/B-11.3
/B-11.3
XSP_FDC00_IND
XSP_FDC11_IND
XSP_FDC21_IND
1M 1M 1M
-XM00 -XM11 -XM21
/B-45.1 /B-45.2 /B-45.4
1F 1F 1F
Unauthorized duplication prohibited without written consent
12 14 96 98 12 14 96 98 12 14 96 98
-FDC00 FDC00 -FDC11 -FDC11 -FDC21 -FDC21
/B-1.6 11 /B-1.6 95 /B-1.3 11 /B-1.3 95 /B-2.3 11 /B-2.3 95
2F 3F 2F 3F 2F 3F
A1 A1 A1 A1 A1 A1
-K00 -KT00 -K11 -KT11 -K21 -KT21
A2 A2 A2 A2 A2 A2
XSN_K DC1_XSN_K_1
B-11.6 / /B-21.1
13 14 /B-40.2 13 14 /B-39.2 13 14 /B-40.3 13 14 /B-39.3 13 14 /B-40.4 13 14 /B-39.4
21 22 /B-40.2 21 22 21 22 /B-40.4 21 22 21 22 /B-40.5 21 22
31 32 31 32 31 32 31 32 31 32 31 32
43 44 /B-26.2 43 44 /B-26.3 43 44 /B-26.4 43 44 /B-26.5 43 44 /B-26.6 43 44 /B-26.7
FAC00 CLOSED FAC00 TRIPED FAC11 CLOSED FAC11 TRIPED FAC21 CLOSED FAC21 TRIPED
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
AUXILIARY RELAYS FOR INCOMING APTOMAT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-20
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XSP_F2759
B-11.3 /
12 14 12 14 12 14 12 14 12 14 12 14
-F27_1 -F59_11 -F27_2 -F59_21 -F59_12 -F59_22
/B-1.6 11 /B-1.8 11 /B-2.6 11 /B-2.7 11 /B-1.9 11 /B-2.9 11
Unauthorized duplication prohibited without written consent
21 21 31 31
-KT27_1 -KT27_2 -KT27_1 -KT27_2
/B-21.2 22 /B-21.4 22 /B-21.2 32 /B-21.4 32
A1 A1 A1 A1 A1 A1
-KT27_1 -KT59_11 -KT27_2 -KT59_21 -KT59_12 -KT59_22
A2 A2 A2 A2 A2 A2
DC1_XSN_K_1 DC1_XSN_KBP
B-20.10 / /B-41.5
F27_1 TRIP F59_1 ALARM F27_2 TRIP F59_2 ALARM F59_1 TRIP F59_2 TRIP
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
AUXILIARY RELAYS FOR OVER AND UNDER + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-21
VOLTAGE RELAY PECC4-20-09 CSE_ DC
Leading Integration
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
=SVR
-IO1
/B-23.2
SVR_DC_IO1
/=SVR/B-8.7
TX RX TX RX
PORT 1A PORT 1B
Unauthorized duplication prohibited without written consent
XP_R1
B-10.1 /
XN_R1
B-10.1 /
Z05 Z06 Z07 Z08
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION IO1 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-22
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20 -IO1
/B-22.7
TX RX
PORT2
PORT 1A
/B-22.8
Z05
TX RX /B-22.6 Z06
PORT3
PORT 1B Z07
SEL-2440 Z08
SCHWEITZER
ENGINEERING
LABORATORIES Z09
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 MODULE + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-23
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
=SVR
-IO2
/B-25.2
SVR_DC_IO2
/=SVR/B-8.7
TX RX TX RX
PORT 1A PORT 1B
Unauthorized duplication prohibited without written consent
XP_R2
B-10.3 /
XN_R2
B-10.3 /
Z05 Z06 Z07 Z08
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION IO2 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-24
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
-IO2
/B-24.7
TX RX
PORT2
PORT 1A
/B-24.8
Z05
TX RX Z06
/B-24.6
PORT3
PORT 1B Z07
SEL-2440 Z08
SCHWEITZER
ENGINEERING
LABORATORIES Z09
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 MODULE + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-25
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
FDC00 CLOSED FDC00 TRIPPED FDC11 CLOSED FDC11 TRIPPED FDC21 CLOSED FDC21 TIRPPED F27_1 TIRPPED F59_1 TRIPPED
XSP_C XSP_T
B-11.3 / /B-27.1
Unauthorized duplication prohibited without written consent
-IO1
/B-22.5
B01 B03 B05 B07 B09 B11 B13 B15
XSN_IO1 XSN_IO1_1
B-11.6 / /B-27.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-26
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
F27_2 TRIPPED F59_2 TRIPPED F59_1 ALARM F59_2 ALARM SW BYPASS SW ON AUTO SPARE SPARE
XSP_T XSP_LED
B-26.10 / /B-39.1
/B-11.3
/B-11.3
XSP_SWAM
XSP_BP
Unauthorized duplication prohibited without written consent
3M
-XM2_C
/B-45.6
3F
DC1_XSP_SWAM_1
-KT27_2 43 43 43 43 13 3
/B-21.4 -KT59_22 -KT59_11 -KT59_21 -KBP -SWAM
44 /B-21.7 44 /B-21.3 44 /B-21.5 44 /B-41.6 14 /B-45.4 4
B-36.3 /
4F
-XM2_C
/B-45.6 4M
-IO1
/B-22.5
B17 B19 B21 B23 B25 B27 B29 B31
XSN_IO1_1 XSN_IO1_2
B-26.10 / /B-28.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-27
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
SPARE SPARE SPARE DOOR CLOSED CHAGER 1 ALARM CHAGER 1 FAIL CHAGER 2 ALARM CHAGER 2 FAIL
/B-11.3
/B-42.5
/B-42.5
/B-42.5
/B-42.5
XSP_CH1_AL
XSP_CH1_F
XSP_CH2_AL
XSP_CH2_F
XSP_DOOR
Unauthorized duplication prohibited without written consent
13
-LS1
/B-11.9 14
3M
-XM8
/B-45.9
3F
13
-LS2
/B-11.8 14
4F
-XM8
/B-45.9
4M
-IO1
/B-22.5
C01 C03 C05 C07 C09 C11 C13 C15
XSN_IO1_2 XSN_IO1_3
B-27.10 / /B-29.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-28
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
CONTACT MCB CONTACT MCCB CONTACT MCCB CONTACT MCB CONTACT MCCB CONTACT MCCB SPARE SPARE
INPUT CHANGE 1 BATTERY CHANGE 1 OUTPUT CHANGE 1 INPUT CHANGE 2 BATTERY CHANGE 2 OUTPUT CHANGE 2
/ B-42.5
/ B-42.5
/ B-42.5
/ B-42.5
/ B-42.5
/ B-42.5
Unauthorized duplication prohibited without written consent
XSP_CH1_1
XSP_CH1_2
XSP_CH1_3
XSP_CH2_1
XSP_CH2_2
XSP_CH2_3
NGAYF 03/07
-IO1
/B-22.5
C17 C19 C21 C23 C25 C27 C29 C31
XSN_IO1_3
B-28.10 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-29
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
FDC101 OFF FDC102 OFF FDC103 OFF FDC104 OFF FDC105 OFF FDC106 OFF FDC107 OFF FDC108 OFF
XSP_FDC1X_OFF XSP_FDC1X_OFF_1
B-11.3 / /B-31.1
Unauthorized duplication prohibited without written consent
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC101 -FDC102 -FDC103 -FDC104 -FDC105 -FDC106 -FDC107 -FDC108
/B-3.2 11 /B-3.3 11 /B-3.5 11 /B-3.6 11 /B-3.8 11 /B-3.9 11 /B-4.2 11 /B-4.3 11
1F 2F 3F 4F 5F
8F 9F 10F -XM3
-XM2_L /B-45.2 1M 2M 3M 4M 5M
/B-45.5
8M 9M 10M
-IO2
/B-24.5
A01 A03 A05 A07 A09 A11 A13 A15
-XM4
XSN_IO2 7M 7F XSN_IO2_1
B-11.6 / /B-31.1
/B-45.4
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-30
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
FDC109 OFF FDC110 OFF FDC111 OFF FDC112 OFF FDC113 OFF FDC114 OFF FDC115 OFF FDC116 OFF
XSP_FDC1X_OFF_1
B-30.10 /
Unauthorized duplication prohibited without written consent
XSP_FDC1X_OFF_2
/B-32.1
12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC109 -FDC110 -FDC111 -FDC112 -FDC113 -FDC114 -FDC115 12 14
/B-4.5 11 /B-4.6 11 /B-4.8 11 /B-4.9 11 /B-5.2 11 /B-5.3 11 /B-5.5 11 -FDC116
/B-5.6 11
6F 7F 8F 9F 10F 1F 2F 3F
-XM3 -XM4
/B-45.2 6M 7M 8M 9M 10M /B-45.4 1M 2M 3M
-IO2
/B-24.5
A17 A19 A21 A23 A25 A27 A29 A31
XSN_IO2_1 XSN_IO2_2
B-30.10 / /B-32.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-31
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
FDC117 OFF AC PANEL MCB OFF SPARE SPARE SPARE SPARE SPARE SPARE
XSP_FDC1X_OFF_2 XSP_FDC1X_T
B-31.10 / /B-43.1
Unauthorized duplication prohibited without written consent
AC
/ =AC/B-2.3
XSP_AC_MCB_F
12 14
-FDC117
/B-5.8 11
4F
-XM4
/B-45.4 4M -XS 39
9M
-XM4
/B-45.4
9F
-IO2
/B-24.5
B01 B03 B05 B07 B09 B11 B13 B15
XSN_IO2_2 XSN_IO2_3
B-31.10 / /B-33.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-32
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
FDC217 OFF FDC2X TRIPPED FDC1X TRIPED SPARE SPARE SPARE SPARE SPARE
XSP_FDC2X_OFF_2 XSP_FDC2X_T
Unauthorized duplication prohibited without written consent
B-35.10 / /B-44.1
/B-44.3
/B-43.3
XSP_FDC2X_T1
FDC1X_T
12 14
-FDC217
/B-8.8 11
-IO2
/B-24.5
B17 B19 B21 B23 B25 B27 B29 B31
XSN_IO2_3 XSN_IO2_4
B-32.10 / /B-34.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-33
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
FDC201 OFF FDC202 OFF FDC203 OFF FDC204 OFF FDC205 OFF FDC206 OFF FDC207 OFF FDC208 OFF
/B-11.3
XSP_FDC2X_OFF
3M
-XM2_L
/B-45.5
3F
XSP_FDC2X_OFF_1
Unauthorized duplication prohibited without written consent
/B-35.1
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC201 -FDC202 -FDC203 -FDC204 -FDC205 -FDC206 -FDC207 -FDC208
/B-6.2 11 /B-6.3 11 /B-6.5 11 /B-6.6 11 /B-6.8 11 /B-6.9 11 /B-7.2 11 /B-7.3 11
-IO2
/B-24.5
C01 C03 C05 C07 C09 C11 C13 C15
XSN_IO2_4 XSN_IO2_5
B-33.10 / /B-35.1
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-34
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
FDC209 OFF FDC210 OFF FDC211 OFF FDC212 OFF FDC213 OFF FDC214 OFF FDC215 OFF FDC216 OFF
XSP_FDC2X_OFF_1 XSP_FDC2X_OFF_2
Unauthorized duplication prohibited without written consent
B-34.10 / /B-33.1
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC209 -FDC210 -FDC211 -FDC212 -FDC213 -FDC214 -FDC215 -FDC216
/B-7.5 11 /B-7.6 11 /B-7.8 11 /B-7.9 11 /B-8.2 11 /B-8.3 11 /B-8.5 11 /B-8.6 11
-IO2
/B-24.5
C17 C19 C21 C23 C25 C27 C29 C31
XSN_IO2_5
B-34.10 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-35
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC1_XSP_SWAM_1 DC1_XSP_SWBP
B-27.8 / /B-41.5
1
-SWAM
/B-45.4 2
DC1_XSP_MA
/B-37.3
XSP_BCU DC1_XSP_CL
B-11.3 / /B-37.3
4F 5F
Unauthorized duplication prohibited without written consent
-XM5 -XM5
/B-45.5 4M /B-45.5 5M
23 -IO1 A01
-KBP OUT101
/B-23.1
/B-41.6 24 FDC00 INTERLOCK A02
XSP_FDC00
/B-11.3
XSP_FDC11
/B-37.6
4M 5M 6M
-XM00
/B-45.1
4F 5F 6F
C11 A1 U1
-FDC00
/B-1.6
U2
8F
-XM00
/B-45.1
8M
XSN_FDC00 DC1_XSN_CTRL_1
B-11.6 / /B-37.3
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONTROL FDC00 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-36
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC1_XSP_MA
B-36.7 /
DC1_XSP_CL DC1_XSP_CL_1
B-36.7 / /B-38.3
DC1_XSP_MA_1
/B-38.3
6F 7F
-XM5
/B-45.5
6M 7M
33 -IO1 A03
-KBP OUT102
/B-23.1
/B-41.6 34 FDC11 INTERLOCK A04
XSP_FDC11
/B-36.5
XSP_FDC21
/B-38.6
4M 5M 6M
-XM11
/B-45.2
4F 5F 6F
C11 A1 U1
-FDC11
/B-1.3
U2
8F
-XM11
/B-45.2
8M
DC1_XSN_CTRL_1 DC1_XSN_CTRL_2
B-36.7 / /B-38.3
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONTROL FDC11 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-37
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC1_XSP_MA_1
B-37.7 /
DC1_XSP_CL_1
B-37.7 /
8F 9F
-XM5 -XM5
/B-45.5 /B-45.5
8M 9M
43 -IO1 A05
-KBP OUT103
/B-23.1
/B-41.6 44 FDC21 INTERLOCK A06
XSP_FDC21
/B-37.6
4M 5M 6M
-XM21
/B-45.4
4F 5F 6F
C11 A1 U1
-FDC11
/B-1.3
U2
8F
-XM21
/B-45.4
8M
DC1_XSN_CTRL_2
B-37.7 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONTROL FDC21 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-38
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XSP_LED DC1_XSP_LED_1
B-27.6 / /B-40.1
13 13 13 13 13 13 13 13 13
-KT00 -KT11 -KT21 -KT27_1 -KT59_12 -KT27_2 -KT59_22 -KT59_11 -KT59_21
/B-20.4 14 /B-20.6 14 /B-20.9 14 /B-21.2 14 /B-21.6 14 /B-21.4 14 /B-21.7 14 /B-21.3 14 /B-21.5 14
Unauthorized duplication prohibited without written consent
1M 2M 3M 4M 5M 6M 7M 8M 9M
-XM6
/B-45.6
1F 2F 3F 4F 5F 6F 7F 8F 9F
x1 x1 x1 x1 x1 x1 x1 x1 x1
-HT00 -HT11 -HT21 -HT27_1 -HT59_1 -HT27_2 -HT59_2 -HA59_1 -HA59_2
x2 x2 x2 x2 x2 x2 x2 x2 x2
-XM5
XSN_LED 10M 10F DC1_XSN_LED_1
B-11.6 / /B-40.1
/B-45.5
FDC00 TRIP FDC11 TRIP FDC21 TRIP F27_1TRIP F59_1 TRIP F27_2 TRIP F59_2 TRIP F59_1 ALARM F59_2 ALARM
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
FAULT INDICATOR SIGNAL + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-39
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
-XM2_L
DC1_XSP_LED_1 6M 6F
B-39.10 /
/B-45.5
Unauthorized duplication prohibited without written consent
13 21 13 21 13 21 11 13 13 11 13 13
-K00 -K00 -K11 -K11 -K21 -K21 IS0685_1 -EDS440_1 -EDS440_2 IS0685_2 -EDS440_3 -EDS440_4
/B-20.3 14 /B-20.3 22 /B-20.5 14 /B-20.5 22 /B-20.8 14 /B-20.8 22 /B-12.3 12 /B-14.3 14 /B-15.3 14 /B-13.3 12 /B-16.3 14 /B-17.3 14
8M
-XM4
/B-45.4
8F
10M 1M 2M 3M 4M 5M 7M 8M
-XM6 -XM7 -XM7
/B-45.6 /B-45.8 /B-45.8
10F 1F 2F 3F 4F 5F 7F 8F
2 3 2 3 2 3
x1 x1
1 1 1
DC1_XSN_LED_1
B-39.10 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
FDC11, FDC21 & FDC00 STATUS + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-40
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
DC1_XSP_SWBP
B-36.5 /
3
SWBP
/B-45.5 4
Unauthorized duplication prohibited without written consent
6F
-XM7
/B-45.8 6M
A1 13 14 /B-27.6
-KBP 23 24 /B-36.3
33 34 /B-37.4
A2
43 44 /B-38.4
DC1_XSN_KBP
B-21.8 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BYPASS SWITCH + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-41
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XSP_TRIP_FAC
/B-11.3
-XS 32 2 XSP_TRIP_FAC202
/=AC/B-53.7
XSN_AC 3 XSN_TRIP_FAC102
Unauthorized duplication prohibited without written consent
B-11.4 / /=AC/B-53.7
=CHARGED1
XSP_CH1_1 4 -X34A 5
B-29.2 /
XSP_CH1_2 5 -X34B 5
B-29.3 /
XSP_CH1_3 6 -X34C 5
B-29.4 /
=CHARGED2
XSP_CH2_1 4 -X34A 5
B-29.5 /
XSP_CH2_2 5 -X34B 5
B-29.6 /
XSP_CH2_3 6 -X34C 5
B-29.7 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TRIP MCCB CHARGE + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-42
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XSP_FDC1X_T
B-32.2 /
98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96
-FDC101 -FDC102 -FDC103 -FDC104 -FDC105 -FDC106 -FDC107 -FDC108 -FDC109 -FDC110
/B-3.2 95 /B-3.3 95 /B-3.5 95 /B-3.6 95 /B-3.8 95 /B-3.9 95 /B-4.2 95 /B-4.3 95 /B-4.5 95 /B-4.6 95
Unauthorized duplication prohibited without written consent
98 96 98 96 98 96 98 96 98 96 98 96 98 96
-FDC117 -FDC116 -FDC115 -FDC114 -FDC113 -FDC112 -FDC111
/B-5.8 95 /B-5.6 95 /B-5.5 95 /B-5.3 95 /B-5.2 95 /B-4.9 95 /B-4.8 95
-XM2_L
FDC1X_T 7M 7F
B-33.4 /
/B-45.5
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
F1X TRIP + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-43
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
XSP_FDC2X_T
B-33.2 /
98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96
-FDC201 -FDC202 -FDC203 -FDC204 -FDC205 -FDC206 -FDC207 -FDC208 -FDC209 -FDC210
/B-6.2 95 /B-6.3 95 /B-6.5 95 /B-6.6 95 /B-6.8 95 /B-6.9 95 /B-7.2 95 /B-7.3 95 /B-7.5 95 /B-7.6 95
Unauthorized duplication prohibited without written consent
98 96 98 96 98 96 98 96 98 96 98 96 98 96
-FDC217 -FDC216 -FDC215 -FDC214 -FDC213 -FDC212 -FDC211
/B-8.8 95 /B-8.6 95 /B-8.5 95 /B-8.3 95 /B-8.2 95 /B-7.9 95 /B-7.8 95
XSP_FDC2X_T1
B-33.3 /
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
F2X TRIP + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-44
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
-SWAM SWBP
-PG00 -PG11 -PG21
1 2 1 2
GREEN GREEN GREEN
M A OFF ON
CONTACT
CONTACT
NO COM /B-36.6 NO COM /B-37.7 NO COM /B-38.7 POSITION POSITION
NC NC NC
1 2 2 1
NC NC NC
-XM1
-XM3 -XM4 -XM5 -XM6 -XM7 -XM8
1 /B-1.10
1 /B-30.5 1 /B-31.7 1 1 /B-39.2 1 /B-40.2 1 /B-11.8
2 /B-1.10
2 /B-30.6 2 /B-31.8 2 2 /B-39.3 2 /B-40.3 2 /B-11.8
3 /B-1.6
3 /B-30.7 3 /B-31.10 3 3 /B-39.4 3 /B-40.4 3 /B-28.5
4 /B-1.6
4 /B-30.8 4 /B-32.2 4 /B-36.4 4 /B-39.5 4 /B-40.4 4 /B-28.5
5 /B-2.10
5 /B-30.9 5 5 /B-36.6 5 /B-39.6 5 /B-40.5 5
6 /B-2.10
6 /B-31.2 6 6 /B-37.5 6 /B-39.7 6 /B-41.6 6
7 /B-2.6
7 /B-31.3 7 /B-30.1 7 /B-37.7 7 /B-39.8 7 /B-40.6 7
8 /B-2.6
8 /B-31.4 8 /B-40.8 8 /B-38.5 8 /B-39.8 8 /B-40.8 8
9
9 /B-31.5 9 /B-32.3 9 /B-38.7 9 /B-39.9 9 9
10
10 /B-31.6 10 10 /B-39.2 10 /B-40.2 10 10
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
EQUIPMENT DESCRIPTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-45
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=ELL_E09+RP-WSE09DC_6
=ELL_E02+RP-WSDCE02_6
=ELL_E09+RP-WSE09DC_1
=ELL_E02+RP-WSDCE02_1
=DLL_D04+RP-WSD04DC_6
=DLL_D02+RP-WDCD02_6
=DLL_D04+RP-WSD04DC_1
=DLL_D02+RP-WSDCD02_1
Strip
Cable name
Cable name
=DC+RP-X16_1
2x2.5mm2
2x2.5mm2
2x2.5mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
1 =DC+RP-FDC108 4 =DC+RP/B-4.3
2 =DC+RP-FDC108 2 =DC+RP/B-4.4
Unauthorized duplication prohibited without written consent
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 100
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=ELL_E09+RP-WSE09DC_7
=ELL_E02+RP-WSDCE02_7
=ELL_E09+RP-WSE09DC_2
=ELL_E02+RP-WSDCE02_4
=DLL_D04+RP-WSD04DC_7
=DLL_D02+RP-WDCD02_7
=DLL_D04+RP-WSD04DC_2
=DLL_D02+RP-WSDCD02_4
Strip
Cable name
Cable name
=DC+RP-X16_2
2x2.5mm2
2x2.5mm2
2x2.5mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
1 =DC+RP-FDC207 4 =DC+RP/B-7.2
2 =DC+RP-FDC207 2 =DC+RP/B-7.2
Unauthorized duplication prohibited without written consent
3 =DC+RP-FDC208 4 =DC+RP/B-7.3
4 =DC+RP-FDC208 2 =DC+RP/B-7.4
1 =DLL_D02+RP-XDC2 1 5 =DC+RP-FDC209 4 =DC+RP/B-7.5
2 =DLL_D02+RP-XDC2 5 6 =DC+RP-FDC209 2 =DC+RP/B-7.5
1 =DLL_D04+RP-XDC2 4 7 =DC+RP-FDC210 4 =DC+RP/B-7.6
2 =DLL_D04+RP-XDC2 8 8 =DC+RP-FDC210 2 =DC+RP/B-7.6
1 =DLL_D02+RP-XDC2 9 9 =DC+RP-FDC211 4 =DC+RP/B-7.8
2 =DLL_D02+RP-XDC2 11 10 =DC+RP-FDC211 2 =DC+RP/B-7.8
1 =DLL_D04+RP-XDC2 10 11 =DC+RP-FDC212 4 =DC+RP/B-7.9
2 =DLL_D04+RP-XDC2 12 12 =DC+RP-FDC212 2 =DC+RP/B-7.9
1 =ELL_E02+RP-XDC2 1 13 =DC+RP-FDC213 4 =DC+RP/B-8.2
2 =ELL_E02+RP-XDC2 5 14 =DC+RP-FDC213 2 =DC+RP/B-8.2
1 =ELL_E09+RP-XDC2 4 15 =DC+RP-FDC214 4 =DC+RP/B-8.3
2 =ELL_E09+RP-XDC2 8 16 =DC+RP-FDC214 2 =DC+RP/B-8.4
1 =ELL_E02+RP-XDC2 9 17 =DC+RP-FDC215 4 =DC+RP/B-8.5
2 =ELL_E02+RP-XDC2 11 18 =DC+RP-FDC215 2 =DC+RP/B-8.5
1 =ELL_E09+RP-XDC2 10 19 =DC+RP-FDC216 4 =DC+RP/B-8.6
2 =ELL_E09+RP-XDC2 12 20 =DC+RP-FDC216 2 =DC+RP/B-8.6
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 101
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=INV+RP-WDCINV22
Strip
Cable name
Cable name
=DC+RP-X25_2
2x6mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 102
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=INV+RP-WDCINV11
Strip
Cable name
Cable name
=DC+RP-X32_1
2x6mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
1 =DC+RP-FDC104 4 =DC+RP/B-3.6
2 =DC+RP-FDC104 2 =DC+RP/B-3.6
Unauthorized duplication prohibited without written consent
3 =DC+RP-FDC105 4 =DC+RP/B-3.8
4 =DC+RP-FDC105 2 =DC+RP/B-3.8
1 =INV+RP-XDC1 1 5 =DC+RP-FDC106 4 =DC+RP/B-3.9
2 =INV+RP-XDC1 3 6 =DC+RP-FDC106 2 =DC+RP/B-3.9
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 103
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=INV+RP-WDCINV12
Strip
Cable name
Cable name
=DC+RP-X32_2
2x6mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 104
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=DLL_D04+RP-WSDCMK4_1
=DLL_D02+RP-WSDCMK2_1
Strip
Cable name
Cable name
=DC+RP-X50_1
2x4mm2
2x4mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 105
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=ELL_E09+RP-WSMK09DC_1
=ELL_E02+RP-WSDCMK02_1
Strip
Cable name
Cable name
=DC+RP-X50_2
2x4mm2
2x4mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 106
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
Strip
Cable name
Cable name
=DC+RP-X63_1
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
1 =DC+RP-FDC101 4 =DC+RP/B-3.2
2 =DC+RP-FDC101 2 =DC+RP/B-3.2
Unauthorized duplication prohibited without written consent
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 107
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
Strip
Cable name
Cable name
=DC+RP-X63_2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
1 =DC+RP-FDC201 4 =DC+RP/B-6.2
2 =DC+RP-FDC201 2 =DC+RP/B-6.2
Unauthorized duplication prohibited without written consent
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 108
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=DC+RP-WCH1DC_2
=DC+RP-WCH1DC_1
Strip
Cable name
Cable name
=DC+RP-X100_1
1x50
1x50
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 109
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=DC+RP-WCH2DC_2
=DC+RP-WCH2DC_1
Strip
Cable name
Cable name
=DC+RP-X100_2
1x50
1x50
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 110
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=INV+RP-WSACDCINV_1
=DC+RP-WACDC_2
Strip
Cable name
Cable name
=DC+RP-XAC
2x2.5mm2
2x2.5mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 111
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=AC+RP-WSDCAC_1
Strip
Cable name
Cable name
=DC+RP-XDC
2x2.5mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
3 =DC+RP-U1 =DC+RP/B-9.7
4 =DC+RP/B-9.7
5 =DC+RP/B-9.7
6 =DC+RP/B-9.7
7 =DC+RP/B-9.8
8 =DC+RP/B-9.8
9 =DC+RP/B-9.8
10 =DC+RP/B-9.8
2 =AC+RP-XDC 3 11 =DC+RP-FDC 2 =DC+RP/B-9.5
12 =DC+RP-FR1 1 =DC+RP/B-9.6
13 =DC+RP-U1 =DC+RP/B-9.7
14 =DC+RP/B-9.7
15 =DC+RP/B-9.7
16 =DC+RP/B-9.7
17 =DC+RP/B-9.8
18 =DC+RP/B-9.8
19 =DC+RP/B-9.8
20 =DC+RP/B-9.8
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 112
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=INV+RP-WDCINV21
Strip
Cable name
Cable name
=DC+RP-XINV_1
2x6mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 113
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=DC+RP-WDCCH2_3
=DC+RP-WDCCH1_3
=DC+RP-WACDC_1
=DC+RP-WDCCH1_3
=DC+RP-WDCCH2_3
=AC+RP-WACDC_1
=DC+RP-WACDC_1
Strip
Cable name
Cable name
=DC+RP-XS
7x1.5mm2
7x1.5mm2
7x1.5mm2
7x1.5mm2
7x1.5mm2
7x1.5mm2
7x1.5mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 114
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=DC+RP-WDCCH2_3
=AC+RP-WACDC_1
=DC+RP-WDCCH1_3
=DC+RP-WDCCH2_3
Strip
Cable name
Cable name
=DC+RP-XS
7x1.5mm2
7x1.5mm2
7x1.5mm2
7x1.5mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 115
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Terminal diagram
=M1+RP-WSDCM1
Strip
Cable name
Cable name
=DC+RP-X16_2
2x2.5mm2
Connection
Connection
Cable type
Cable type
Terminal
Jumper
point
point
Function text Target designation Target designation Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 116
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Cable diagram
=DC+RP-WACDC_1 CAB7x1.5
Page / column Target designation from Conductor Target designation to Page / column
4
5
6
7
=DC+RP-WACDC_2 CAB2x2.5
Unauthorized duplication prohibited without written consent
Page / column Target designation from Conductor Target designation to Page / column
=DC+RP-WCH1DC_1 CAB1x50
Page / column Target designation from Conductor Target designation to Page / column
=DC+RP-WCH1DC_2 CAB1x50
Page / column Target designation from Conductor Target designation to Page / column
=DC+RP-WCH2DC_1 CAB1x50
Page / column Target designation from Conductor Target designation to Page / column
=DC+RP-WCH2DC_2 CAB1x50
Page / column Target designation from Conductor Target designation to Page / column
=DC+RP-WDCCH1_3 CAB7x1.5
Page / column Target designation from Conductor Target designation to Page / column
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CABLE DIAGRAM + CAB
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 300
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10
25-MAY-20
Cable diagram
=DC+RP-WDCCH1_3 CAB7x1.5
Page / column Target designation from Conductor Target designation to Page / column
7
=DC+RP-WDCCH2_3 CAB7x1.5
Page / column Target designation from Conductor Target designation to Page / column
5
Unauthorized duplication prohibited without written consent
REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CABLE DIAGRAM + CAB
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 301
Leading Integration
PECC4-20-09 CSE_ DC