You are on page 1of 79

Project: 220KV CHU SE SUBSTATION

Job number PECC4-20-09

Drawing number CSE_ DC

Issued Date 30.09.2020


Issued stage FINAL

Contract number 17/2020/NPT-CPMB-ATS/CS

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V 220V DC MAIN 1 DISTRIBUTION 220KV CHU SE SUBSTATION + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A1-1
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Table of contents
Page Description

=DC+R/A1-1 220V DC MAIN 1 DISTRIBUTION

=DC+R/A1-2 Table of contents

=DC+R/A1-3 Table of contents

=DC+R/A1-4 Table of contents

=DC+R/A2-1 DC SINGLE LINE DIAGRAM

=DC+R/A2-2 DIMENSION

=DC+R/A2-3 DC CUBICLE LAYOUT

=DC+R/A3-1 BILL OF MATERIALS

=DC+R/A3-2 BILL OF MATERIALS

=DC+R/A3-3 BILL OF MATERIALS


Unauthorized duplication prohibited without written consent

=DC+R/A3-4 BILL OF MATERIALS

=DC+R/A3-5 BILL OF MATERIALS

=DC+R/A3-6 BILL OF MATERIALS

=DC+R/A3-7 BILL OF MATERIALS

=DC+R/A3-8 BILL OF MATERIALS

=DC+RP/B-1 INCOMING 220V DC1

=DC+RP/B-2 INCOMING 220V DC2

=DC+RP/B-3 BB1 DISTRIBUTION

=DC+RP/B-4 BB1 DISTRIBUTION

=DC+RP/B-5 BB1 DISTRIBUTION

=DC+RP/B-6 BB2 DISTRIBUTION

=DC+RP/B-7 BB2 DISTRIBUTION

=DC+RP/B-8 BB2 DISTRIBUTION

=DC+RP/B-9 POWER SUPPLY DC

=DC+RP/B-10 POWER SUPPLY DC

=DC+RP/B-11 POWER SUPPLY DC,AC

=DC+RP/B-12 CONNECTION ISO685-1

=DC+RP/B-13 CONNECTION ISO685-2

=DC+RP/B-14 CONNECTION EDS440-1

=DC+RP/B-15 CONNECTION EDS440-2

=DC+RP/B-16 CONNECTION EDS440-3

=DC+RP/B-17 CONNECTION EDS440-4

=DC+RP/B-18 METTER

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
Table of contents + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A1-2
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Table of contents
Page Description

=DC+RP/B-19 CONNECTION METTER

=DC+RP/B-20 AUXILIARY RELAYS FOR INCOMING APTOMAT

=DC+RP/B-21 AUXILIARY RELAYS FOR OVER AND UNDER VOLTAGE RELAY

=DC+RP/B-22 CONNECTION IO1

=DC+RP/B-23 IO1 MODULE

=DC+RP/B-24 CONNECTION IO2

=DC+RP/B-25 IO2 MODULE

=DC+RP/B-26 IO1 DIGITAL INPUT

=DC+RP/B-27 IO1 DIGITAL INPUT

=DC+RP/B-28 IO1 DIGITAL INPUT


Unauthorized duplication prohibited without written consent

=DC+RP/B-29 IO1 DIGITAL INPUT

=DC+RP/B-30 IO2 DIGITAL INPUT

=DC+RP/B-31 IO2 DIGITAL INPUT

=DC+RP/B-32 IO2 DIGITAL INPUT

=DC+RP/B-33 IO2 DIGITAL INPUT

=DC+RP/B-34 IO2 DIGITAL INPUT

=DC+RP/B-35 IO2 DIGITAL INPUT

=DC+RP/B-36 CONTROL FDC00

=DC+RP/B-37 CONTROL FDC11

=DC+RP/B-38 CONTROL FDC21

=DC+RP/B-39 FAULT INDICATOR SIGNAL

=DC+RP/B-40 FDC11, FDC21 & FDC00 STATUS

=DC+RP/B-41 BYPASS SWITCH

=DC+RP/B-42 TRIP MCCB CHARGE

=DC+RP/B-43 F1X TRIP

=DC+RP/B-44 F2X TRIP

=DC+RP/B-45 EQUIPMENT DESCRIPTION

=DC+TP1/100 TERMINAL DIAGRAM

=DC+TP1/101 TERMINAL DIAGRAM

=DC+TP1/102 TERMINAL DIAGRAM

=DC+TP1/103 TERMINAL DIAGRAM

=DC+TP1/104 TERMINAL DIAGRAM

=DC+TP1/105 TERMINAL DIAGRAM

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
Table of contents + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A1-3
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Table of contents
Page Description

=DC+TP1/106 TERMINAL DIAGRAM

=DC+TP1/107 TERMINAL DIAGRAM

=DC+TP1/108 TERMINAL DIAGRAM

=DC+TP1/109 TERMINAL DIAGRAM

=DC+TP1/110 TERMINAL DIAGRAM

=DC+TP1/111 TERMINAL DIAGRAM

=DC+TP1/112 TERMINAL DIAGRAM

=DC+TP1/113 TERMINAL DIAGRAM

=DC+TP1/114 TERMINAL DIAGRAM

=DC+TP1/115 TERMINAL DIAGRAM


Unauthorized duplication prohibited without written consent

=DC+TP1/116 TERMINAL DIAGRAM

=DC+CAB/300 CABLE DIAGRAM

=DC+CAB/301 CABLE DIAGRAM

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
Table of contents + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A1-4
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

FROM DISTRIBUTION PANEL AC BATTERY 1 BATTERY 2 FROM DISTRIBUTION PANEL AC


BATERY ROOM SUPERVISOR EQUIPMENT
300Ah/5h ACCU ONLINE

V V
I> I>
PROCESSOR

CHARGE 220VDC 1 CHARGE 220VDC 2


A A

A A

=FUSE+BOX

=FUSE+BOX
V A A V

F1 F2
3P 3P
100A 100A

DISTRIBUTION 220VDC
Unauthorized duplication prohibited without written consent

COMPUTER SYSTEM

F:6A R R F:6A

220 DC DISTRIBUTION
27/59 27/59
BOARD No.1 MCCB MCCB
3P
DC1 100A
-FDC11 -FDC21
3P
100A
M AUTO CHANGEOVER M
ON OFF ON OFF
SEL-2440

SHUNT A A SHUNT

V V

EDS1 IDM1 220 DC DISTRIBUTION IDM2 EDS2


MCCB -FDC00
BOARD No.2

M
F:6A

F:6A
SUPERVISOR
RS485 3P RS485

220VDC BB1-150A
100A
DC2 220VDC BB2-150A
SEL-2440

FDC117 FDC116 FDC115 FDC114 FDC113 FDC112 FDC111 FDC110 FDC109 FDC108 FDC107 FDC106 FDC105 FDC104 FDC103 FDC102 FDC101 FDC201 FDC202 FDC203 FDC204 FDC205 FDC206 FDC207 FDC208 FDC209 FDC210 FDC211 FDC212 FDC213 FDC214 FDC215 FDC216 FDC217
2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P ON OFF 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P 2P
16A 16A 16A 16A 16A 16A 16A 16A 16A 16A 25A 32A 32A 32A 50A 50A 63A 63A 50A 50A 32A 32A 25A 16A 16A 16A 16A 16A 16A 16A 16A 16A 16A 16A
TRIP CIRCUIT 220kV D04+RP

TRIP CIRCUIT 220kV D02+RP

TRIP CIRCUIT 220kV D02+RP

TRIP CIRCUIT 220kV D04+RP


TRIP CIRCUIT 220kV E02+RP

TRIP CIRCUIT 110kV E02+RP

TRIP CIRCUIT 110kV E09+RP


MOTOR CB AND DS E02+MK

MOTOR CB AND DS E09+MK


INVERTER FOR COMPUTER

MOTOR CB AND DS 220KV

MOTOR CB AND DS 220KV

INVERTER FOR COMPUTER


SUPPLY POWER RELAY2

SUPPLY POWER SIGNAL


SUPPLY POWER SIGNAL

SUPPLY POWER SIGNAL

WAN CUBICLE (CH48)


INVERTER FOR FAULT

INVERTER FOR FAULT


SUPPLY POWER SIGNAL

POWER SUPPLY FOR

POWER SUPPLY FOR

POWER SUPPLY FOR

POWER SUPPLY FOR

POWER SUPPLY FOR


SUPPLY RELAY AND

SUPPLY RELAY AND

SUPPLY RELAY AND

SUPPLY RELAY AND

SUPPLY RELAY AND

SUPPLY RELAY AND

SUPPLY RELAY AND


POWER SUPPLY FOR
LIGHTING SYSTEM

LIGHTING SYSTEM

SUPPLY SIGNAL 1,

SUPPLY SIGNAL 1,

SUPPLY SIGNAL 1,

SUPPLY SIGNAL 1,
BCU D02+RP

BCU D04+RP

BCU E02+RP

BCU E09+RP

METTER M1
220kV D04
110kV E09

110kV E02

110kV E09

SYSTEM
220kV D02

SYSTEM
SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE
NOTE: 1. INTERLOCK: 2. AUTO CHANGOVER :

* FDC00 CLOSED = (FDC11 CLOSED & FDC21 TRIP) ^ (FDC21 CLOSED & FDC11 TRIP )
ON ON ON
* FDC21 CLOSED = (FDC11 TRIP & FDC00 CLOSED & F27 / 59 - (2) NOT TRIP).
-FDC11
* FDC11 CLOSED = (FDC21 TRIP & FDC00 CLOSED & F27 / 59 - (1) NOT TRIP).
-FDC21
3. AUXILIARY POWER FOR CONTROL, PLC, FAULT SIGNAL, LAMP STATUS,
-FDC00 TRIP SIGNAL, MOTORIZED OF MCCB, etc: 220VDC

4. ALL MCB, MCCB RATINGS AND QUANTITY WILL BE CORRECTED WITH EQUIPMENT IN DETAIL DESIGN BY ATS

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
DC SINGLE LINE DIAGRAM + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A2-1
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

BOTTOM VIEW
800 800
24-Ø13x20
Front CSE_DC Indoor
SPECIFICATION:

1000

798

894
* Enclosure material : Tole 2.0 mm
* Indoor electrosatic power coating
Rear * Painting color : RAL 7032
695 695
* Protection Degree : IP 41
Unauthorized duplication prohibited without written consent

720 720

FRONT VIEW SIDE VIEW REAR VIEW


800 800 1000 1600

H11 H2 1

A Dteck ADteck ADteck ADte ck

ENT ER ENT ER ENTER E NTER

H2 7_ 1 H59_ 11 H5 9_ 12 H2 7_2 H5 9_ 21 H5 9_22

Ø 1 2 Ø 1 2

SWBP SWAM

P R1 1 PG11 PR21 PG21

HT1 1 HT21
PR0 0
2100

HT0 0
2200

PG00
2200
100

CSE_DC1 CSE_DC2 CSE_DC2 CSE_DC1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
DIMENSION + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A2-2
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

CSE_DC Indoor

SCHWEITZER
ENGINEERING
DPAC SCHWEITZER
ENGINEERING
DPAC
LABORATO RIES LABORATO RIES
PU LLMA N, WA SH IN GT ON USA
SEL -2440 PU LLMA N, WA SH IN GT ON USA
SEL -2440
DISCRETE DISCRETE
PRO GRAMMABL E PRO GRAMMABL E
AUTOMAT ION AUTOMAT ION
CON TROL LER CON TROL LER

1A 1B 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 6 1A 1 B 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 1 4 15 1 6
ENA BL ED LN K 100 ENA BL ED LN K 100
LAMP ALA RM TX 200 LAMP ALA RM TX 200
TE ST T E ST
MODE RX 300 MODE RX 300
Unauthorized duplication prohibited without written consent

A BB AB B ABB AB B ABB A BB A BB AB B ABB AB B ABB A BB

A BB AB B ABB AB B ABB A BB ABB A BB AB B ABB AB B A BB AB B ABB AB B ABB A BB ABB A BB AB B ABB AB B

CSE_DC1 CSE_DC2

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
DC CUBICLE LAYOUT + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A2-3
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

Parts list
25-MAY-20

Index Page References Device tag Part number Description Manufacturer

1 =DC+RP/B-18 -A1 CS1-VA-DV5-8-ADH DC Voltage meters Chang Shuan/Đài Loan

2 =DC+RP/B-18 -A2 CS1-VA-DV5-8-ADH DC Voltage meters Chang Shuan/Đài Loan

3 =DC+RP/B-14 -EDS440_1 EDS-440 ISOSCAN BENDER

4 =DC+RP/B-15 -EDS440_2 EDS-440 ISOSCAN BENDER

5 =DC+RP/B-16 -EDS440_3 EDS-440 ISOSCAN BENDER

6 =DC+RP/B-17 -EDS440_4 EDS-440 ISOSCAN BENDER

7 =DC+RP/B-1 -F11 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

8 =DC+RP/B-1 -F11 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU


Unauthorized duplication prohibited without written consent

9 =DC+RP/B-2 -F21 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

10 =DC+RP/B-2 -F21 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

11 =DC+RP/B-1 -F27_1 3UG4633-1AL30 The single phase Voltage monitoring relay SIE

12 =DC+RP/B-2 -F27_2 3UG4633-1AL30 The single phase Voltage monitoring relay SIE

13 =DC+RP/B-1 -F59_11 3UG4633-1AL30 The single phase Voltage monitoring relay SIE

14 =DC+RP/B-1 -F59_12 3UG4633-1AL30 The single phase Voltage monitoring relay SIE

15 =DC+RP/B-2 -F59_21 3UG4633-1AL30 The single phase Voltage monitoring relay SIE

16 =DC+RP/B-2 -F59_22 3UG4633-1AL30 The single phase Voltage monitoring relay SIE

17 =DC+RP/B-11 -FAC 2CDS252001R0104 MCB - S200 - 2P - C - 10 A - 440VAC/6kA ABB/EU

18 =DC+RP/B-11 -FAC 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

19 =DC+RP/B-9 -FDC 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

20 =DC+RP/B-9 -FDC 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

21 =DC+RP/B-1 -FDC00 1SDA066807R1 XT1B 160 TMD 100-1000 3p F F ABB/EU

22 =DC+RP/B-1 -FDC00 1SDA066460R1 Direct action motor operator - MOD: MOD 220...250V AC/DC ABB/EU

23 =DC+RP/B-1 -FDC00 1SDA066431R1 Auxiliary contacts - AUX: AUX-C 1Q+1SY 250V ABB/EU

24 =DC+RP/B-1 -FDC1 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

25 =DC+RP/B-1 -FDC1 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

26 =DC+RP/B-2 -FDC2 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

27 =DC+RP/B-2 -FDC2 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

28 =DC+RP/B-1 -FDC11 1SDA066807R1 XT1B 160 TMD 100-1000 3p F F ABB/EU

29 =DC+RP/B-1 -FDC11 1SDA066460R1 Direct action motor operator - MOD: MOD 220...250V AC/DC ABB/EU

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-1
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

Parts list
25-MAY-20

Index Page References Device tag Part number Description Manufacturer

30 =DC+RP/B-1 -FDC11 1SDA066431R1 Auxiliary contacts - AUX: AUX-C 1Q+1SY 250V ABB/EU

31 =DC+RP/B-2 -FDC21 1SDA066807R1 XT1B 160 TMD 100-1000 3p F F ABB/EU

32 =DC+RP/B-2 -FDC21 1SDA066460R1 Direct action motor operator - MOD: MOD 220...250V AC/DC ABB/EU

33 =DC+RP/B-2 -FDC21 1SDA066431R1 Auxiliary contacts - AUX: AUX-C 1Q+1SY 250V ABB/EU

34 =DC+RP/B-3 -FDC101 2CDS272061R0634 S202M-C63UC Miniature Circuit Breaker 2P ABB/EU

35 =DC+RP/B-3 -FDC101 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

36 =DC+RP/B-3 -FDC101 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

37 =DC+RP/B-3 -FDC102 2CDS272061R0504 S202M-C50UC Miniature Circuit Breaker 2P ABB/EU


Unauthorized duplication prohibited without written consent

38 =DC+RP/B-3 -FDC102 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

39 =DC+RP/B-3 -FDC102 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

40 =DC+RP/B-3 -FDC103 2CDS272061R0504 S202M-C50UC Miniature Circuit Breaker 2P ABB/EU

41 =DC+RP/B-3 -FDC103 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

42 =DC+RP/B-3 -FDC103 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

43 =DC+RP/B-3 -FDC104 2CDS272061R0324 S202M-C32UC Miniature Circuit Breaker 2P ABB/EU

44 =DC+RP/B-3 -FDC104 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

45 =DC+RP/B-3 -FDC104 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

46 =DC+RP/B-3 -FDC105 2CDS272061R0324 S202M-C32UC Miniature Circuit Breaker 2P ABB/EU

47 =DC+RP/B-3 -FDC105 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

48 =DC+RP/B-3 -FDC105 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

49 =DC+RP/B-3 -FDC106 2CDS272061R0324 S202M-C32UC Miniature Circuit Breaker 2P ABB/EU

50 =DC+RP/B-3 -FDC106 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

51 =DC+RP/B-3 -FDC106 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

52 =DC+RP/B-4 -FDC107 2CDS272061R0254 S202M-C25UC Miniature Circuit Breaker 2P ABB/EU

53 =DC+RP/B-4 -FDC107 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

54 =DC+RP/B-4 -FDC107 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

55 =DC+RP/B-4 -FDC108 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

56 =DC+RP/B-4 -FDC108 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

57 =DC+RP/B-4 -FDC108 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

58 =DC+RP/B-4 -FDC109 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-2
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

Parts list
25-MAY-20

Index Page References Device tag Part number Description Manufacturer

59 =DC+RP/B-4 -FDC109 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

60 =DC+RP/B-4 -FDC109 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

61 =DC+RP/B-4 -FDC110 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

62 =DC+RP/B-4 -FDC110 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

63 =DC+RP/B-4 -FDC110 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

64 =DC+RP/B-4 -FDC111 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

65 =DC+RP/B-4 -FDC111 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

66 =DC+RP/B-4 -FDC111 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU


Unauthorized duplication prohibited without written consent

67 =DC+RP/B-4 -FDC112 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

68 =DC+RP/B-4 -FDC112 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

69 =DC+RP/B-4 -FDC112 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

70 =DC+RP/B-5 -FDC113 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

71 =DC+RP/B-5 -FDC113 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

72 =DC+RP/B-5 -FDC113 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

73 =DC+RP/B-5 -FDC114 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

74 =DC+RP/B-5 -FDC114 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

75 =DC+RP/B-5 -FDC114 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

76 =DC+RP/B-5 -FDC115 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

77 =DC+RP/B-5 -FDC115 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

78 =DC+RP/B-5 -FDC115 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

79 =DC+RP/B-5 -FDC116 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

80 =DC+RP/B-5 -FDC116 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

81 =DC+RP/B-5 -FDC116 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

82 =DC+RP/B-5 -FDC117 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

83 =DC+RP/B-5 -FDC117 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

84 =DC+RP/B-5 -FDC117 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

85 =DC+RP/B-6 -FDC201 2CDS272061R0634 S202M-C63UC Miniature Circuit Breaker 2P ABB/EU

86 =DC+RP/B-6 -FDC201 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

87 =DC+RP/B-6 -FDC201 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-3
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

Parts list
25-MAY-20

Index Page References Device tag Part number Description Manufacturer

88 =DC+RP/B-6 -FDC202 2CDS272061R0504 S202M-C50UC Miniature Circuit Breaker 2P ABB/EU

89 =DC+RP/B-6 -FDC202 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

90 =DC+RP/B-6 -FDC202 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

91 =DC+RP/B-6 -FDC203 2CDS272061R0504 S202M-C50UC Miniature Circuit Breaker 2P ABB/EU

92 =DC+RP/B-6 -FDC203 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

93 =DC+RP/B-6 -FDC203 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

94 =DC+RP/B-6 -FDC204 2CDS272061R0324 S202M-C32UC Miniature Circuit Breaker 2P ABB/EU

95 =DC+RP/B-6 -FDC204 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU


Unauthorized duplication prohibited without written consent

96 =DC+RP/B-6 -FDC204 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

97 =DC+RP/B-6 -FDC205 2CDS272061R0324 S202M-C32UC Miniature Circuit Breaker 2P ABB/EU

98 =DC+RP/B-6 -FDC205 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

99 =DC+RP/B-6 -FDC205 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

100 =DC+RP/B-6 -FDC206 2CDS272061R0254 S202M-C25UC Miniature Circuit Breaker 2P ABB/EU

101 =DC+RP/B-6 -FDC206 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

102 =DC+RP/B-6 -FDC206 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

103 =DC+RP/B-7 -FDC207 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

104 =DC+RP/B-7 -FDC207 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

105 =DC+RP/B-7 -FDC207 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

106 =DC+RP/B-7 -FDC208 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

107 =DC+RP/B-7 -FDC208 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

108 =DC+RP/B-7 -FDC208 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

109 =DC+RP/B-7 -FDC209 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

110 =DC+RP/B-7 -FDC209 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

111 =DC+RP/B-7 -FDC209 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

112 =DC+RP/B-7 -FDC210 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

113 =DC+RP/B-7 -FDC210 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

114 =DC+RP/B-7 -FDC210 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

115 =DC+RP/B-7 -FDC211 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

116 =DC+RP/B-7 -FDC211 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-4
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

Parts list
25-MAY-20

Index Page References Device tag Part number Description Manufacturer

117 =DC+RP/B-7 -FDC211 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

118 =DC+RP/B-7 -FDC212 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

119 =DC+RP/B-7 -FDC212 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

120 =DC+RP/B-7 -FDC212 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

121 =DC+RP/B-8 -FDC213 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

122 =DC+RP/B-8 -FDC213 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

123 =DC+RP/B-8 -FDC213 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

124 =DC+RP/B-8 -FDC214 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU


Unauthorized duplication prohibited without written consent

125 =DC+RP/B-8 -FDC214 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

126 =DC+RP/B-8 -FDC214 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

127 =DC+RP/B-8 -FDC215 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

128 =DC+RP/B-8 -FDC215 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

129 =DC+RP/B-8 -FDC215 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

130 =DC+RP/B-8 -FDC216 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

131 =DC+RP/B-8 -FDC216 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

132 =DC+RP/B-8 -FDC216 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

133 =DC+RP/B-8 -FDC217 2CDS272061R0164 S202M-C16UC Miniature Circuit Breaker 2P ABB/EU

134 =DC+RP/B-8 -FDC217 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

135 =DC+RP/B-8 -FDC217 2CDS200922R0001 S2C-S/H6R - Signal/Auxiliary Contact ABB/EU

136 =DC+RP/B-10 -FISO1 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

137 =DC+RP/B-10 -FISO1 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

138 =DC+RP/B-10 -FISO2 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

139 =DC+RP/B-10 -FISO2 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

140 =DC+RP/B-10 -FR1 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

141 =DC+RP/B-10 -FR1 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

142 =DC+RP/B-10 -FR2 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

143 =DC+RP/B-10 -FR2 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

144 =DC+RP/B-10 -FS 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

145 =DC+RP/B-10 -FS 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-5
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

Parts list
25-MAY-20

Index Page References Device tag Part number Description Manufacturer

146 =DC+RP/B-1 -FVM11 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

147 =DC+RP/B-1 -FVM11 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

148 =DC+RP/B-2 -FVM21 2CDS272061R0104 S202M-C10UC Miniature Circuit Breaker 2P ABB/EU

149 =DC+RP/B-2 -FVM21 2CDS200912R0001 S2C-H6R Auxiliary Contact ABB/EU

150 =DC+RP/B-11 -H1 APN9505 Led: whilte, HxD: 200x100 mm, P: max40W, sockets: E27 Viet nam

151 =DC+RP/B-11 -H2 APN9505 Led: whilte, HxD: 200x100 mm, P: max40W, sockets: E27 Viet nam

152 =DC+RP/B-1 -H11 YW1P-2EQM3R YW control unit dome full voltage LED red IDEC /Japan

153 =DC+RP/B-2 -H21 YW1P-2EQM3R YW control unit dome full voltage LED red IDEC /Japan
Unauthorized duplication prohibited without written consent

154 =DC+RP/B-39 -HA59_1 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

155 =DC+RP/B-39 -HA59_2 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

156 =DC+RP/B-11 -HG 01220.0-00 Mechanical Hygrostat MFR 012 China

157 =DC+RP/B-39 -HT00 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

158 =DC+RP/B-39 -HT11 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

159 =DC+RP/B-39 -HT21 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

160 =DC+RP/B-39 -HT27_1 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

161 =DC+RP/B-39 -HT27_2 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

162 =DC+RP/B-39 -HT59_1 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

163 =DC+RP/B-39 -HT59_2 YW1P-2EQM3Y YW control unit dome full voltage LED yellow IDEC /Japan

164 =DC+RP/B-22 -IO1 24402H11G1G11840 Discrete Programmable Automation Controller SEL/USA

165 =DC+RP/B-24 -IO2 24402H12G1G11840 Discrete Programmable Automation Controller SEL/USA

166 =DC+RP/B-12 IS0685_1 ISO-685 ISOMETER BENDER

167 =DC+RP/B-13 IS0685_2 ISO-685 ISOMETER BENDER

168 =DC+RP/B-20 -K00 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

169 =DC+RP/B-20 -K11 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

170 =DC+RP/B-20 -K21 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

171 =DC+RP/B-9 -KAT CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

172 =DC+RP/B-41 -KBP CA3KN40MD Auxiliary Relay 4NO Schneider/China

173 =DC+RP/B-20 -KT00 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

174 =DC+RP/B-20 -KT11 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-6
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

Parts list
25-MAY-20

Index Page References Device tag Part number Description Manufacturer

175 =DC+RP/B-20 -KT21 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

176 =DC+RP/B-21 -KT27_1 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

177 =DC+RP/B-21 -KT27_2 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

178 =DC+RP/B-21 -KT59_11 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

179 =DC+RP/B-21 -KT59_12 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

180 =DC+RP/B-21 -KT59_21 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

181 =DC+RP/B-21 -KT59_22 CA3KN22MD Auxiliary Relay 2NO 2NC Schneider/China

182 =DC+RP/B-40 -LD00 1280BIL522 Position Indicators Gossen/Germany


Unauthorized duplication prohibited without written consent

183 =DC+RP/B-40 -LD11 1280BIL522 Position Indicators Gossen/Germany

184 =DC+RP/B-40 -LD21 1280BIL522 Position Indicators Gossen/Germany

185 =DC+RP/B-45 -PG00 XB6ECA31P Button with green overview Schneider/China

186 =DC+RP/B-45 -PG11 XB6ECA31P Button with green overview Schneider/China

187 =DC+RP/B-45 -PG21 XB6ECA31P Button with green overview Schneider/China

188 =DC+RP/B-45 -PR00 XB6ECA41P Button with red overview Schneider/China

189 =DC+RP/B-45 -PR11 XB6ECA41P Button with red overview Schneider/China

190 =DC+RP/B-45 -PR21 XB6ECA41P Button with red overview Schneider/China

191 =DC+RP/B-11 -R1 HSH-210C-660R Heating / Dehumidifying Resistors DanothermEle/Danmark

192 =DC+RP/B-1 -SHUNT SH100A60MV Shunt Resistor Rishabh/ Indian

193 =DC+RP/B-2 -SHUNT2 SH100A60MV Shunt Resistor Rishabh/ Indian

194 =DC+RP/B-45 -SWAM CA4-A721-600-FS2 Switch 2 position 4 contact without OFF 60ø Switching K&N/NewZealand

195 =DC+RP/B-45 SWBP CA4-A720-600-FS2 Switch 2 position 2 contact without OFF 60ø Switching K&N/NewZealand

196 =DC+RP/B-19 -T1 Nport5150 RS485/Ethernet converter Moxa/Taiwan

197 =DC+RP/B-19 -U1 STEP-PS/ 1AC/24DC/1.75 24Vdc Power supply Phoenix/China

198 =DC+RP/B-18 -V1 CS1-VA-DVB-8-ADH DC Voltage meters Chang Shuan/Đài Loan

199 =DC+RP/B-18 -V2 CS1-VA-DVB-8-ADH DC Voltage meters Chang Shuan/Đài Loan

200 =DC+RP/B-42 -WACDC_1 CAB7x1.5 CABLE 7 CORE 7x1.5m2 LSVina

201 =DC+RP/B-11 -WACDC_2 CAB2x2.5 CCV-S-2x2.5 mm² LSVina

202 =DC+RP/B-1 -WCH1DC_1 CAB1x50 CABLE 1CORE 1x50mm2 LSVina

203 =DC+RP/B-1 -WCH1DC_2 CAB1x50 CABLE 1CORE 1x50mm2 LSVina

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-7
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

Parts list
25-MAY-20

Index Page References Device tag Part number Description Manufacturer

204 =DC+RP/B-2 -WCH2DC_1 CAB1x50 CABLE 1CORE 1x50mm2 LSVina

205 =DC+RP/B-2 -WCH2DC_2 CAB1x50 CABLE 1CORE 1x50mm2 LSVina

206 =DC+RP/B-42 -WDCCH1_3 CAB7x1.5 CABLE 7 CORE 7x1.5m2 LSVina

207 =DC+RP/B-42 -WDCCH2_3 CAB7x1.5 CABLE 7 CORE 7x1.5m2 LSVina

208 =DC+RP/B-45 -XM00 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

209 =DC+RP/B-45 -XM1 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

210 =DC+RP/B-45 -XM2_C 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

211 =DC+RP/B-45 -XM2_L 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX
Unauthorized duplication prohibited without written consent

212 =DC+RP/B-45 -XM3 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

213 =DC+RP/B-45 -XM4 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

214 =DC+RP/B-45 -XM5 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

215 =DC+RP/B-45 -XM6 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

216 =DC+RP/B-45 -XM7 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

217 =DC+RP/B-45 -XM8 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

218 =DC+RP/B-45 -XM11 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

219 =DC+RP/B-45 -XM21 1859250,1825394 Terminal Plug. Female UMSTBVK 2.5/10-STF-5.08 PHOENIX

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BILL OF MATERIALS + R
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page A3-8
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

-X6 1 -WCH1DC_1 1 -X100_1 1


-F11
-X9 1 -WCH1DC_2 1 -X100_1 2
1 3 4

-TBP1

-TBN1
1 1 2
=CHARGED1 1M
10A -XM1
440VDC /B-45.1
1F
14 11 /B-10.4 -F27_1 -F59_11 -F59_12
12
A1 A1 A1 x1

14 11 /B-20.5
-H11
12 >U< >U< >U< RED x2
98 95 /B-20.6 1 3 5
96
-FDC11 M A2 A2 A2 2F
100A -XM1
250VDC
/B-45.1
18kA I> I> I> 2M
2 4 6

14 11 /B-21.2 14 11 /B-21.3 14 11 /B-21.6


Unauthorized duplication prohibited without written consent

3 1 3 1 12 12 12
14 11 /B-10.3
-FDC1 -FVM11
12
10A 10A
440VDC 4 2 440VDC 4 2
14 11 /B-10.4
12

5M 6M
-XM2_C
/B-45.6
5F 6F

DC1_XVMN1
DC1_XVMP1
XDC1N
XDC1P
B-9.2 /

B-9.2 /

B-18.1 /

B-18.1 /
-XM1
1 3M 3F DC1_XAMP1
/B-18.1
/B-45.1

-SHUNT
-XM1
2 4M 4F DC1_XAMN1
/B-18.1
/B-45.1
14 11 /B-20.3
12
98 95 /B-20.4
96

-FDC00
5 6 DC1_DC2_XB12N
/B-2.1
I>

DC1_XB1N 4 3 4
B-3.1 /
I>

-TBN1
DC1_XB1P 4 1 2 DC1_DC2_XB12P
B-3.1 / /B-2.1
I>

-TBP1

100A
M 250VDC
18kA

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
INCOMING 220V DC1 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-1
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

-X6 1 -WCH2DC_1 1 -X100_2 1


-F21
-X9 1 -WCH2DC_2 1 -X100_2 2
1 3 4

-TBP2

-TBN2
1 1 2
=CHARGED2 5M
10A -XM1
440VDC /B-45.1
5F
14 11 /B-10.6 -F27_2 -F59_21 -F59_22
12
A1 A1 A1 x1
-H21
>U< >U< >U< RED x2

A2 A2 A2 6F
14 11 /B-20.8
12 -XM1
98 95 /B-20.9 1 3 5 /B-45.1
6M
96
-FDC21 M
100A
250VDC
18kA I> I> I>
2 4 6 3 1 3 1
14 11 /B-21.4 14 11 /B-21.5 14 11 /B-21.7
Unauthorized duplication prohibited without written consent

14 11 /B-10.5
-FDC2 -FVM21 12 12 12
12
10A 10A
440VDC 4 2 440VDC 4 2

14 11 /B-10.7
12
7M 8M
-XM2_C
/B-45.6
7F 8F

DC2_XVMN2
DC2_XVMP2
XDC2N
XDC2P
B-9.2 /

B-9.2 /

B-18.6 /

B-18.6 /
-XM1
1 7M 7F DC2_XAMP2
/B-18.6
/B-45.1

-SHUNT2
-XM1
2 8M 8F DC2_XAMN2
/B-18.6
/B-45.1

DC1_DC2_XB12N 4 DC2_XB2N
B-1.9 / /B-6.1
-TBN2

DC1_DC2_XB12P 4 DC2_XB2P
B-1.9 / /B-6.1
-TBP2

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
INCOMING 220V DC2 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-2
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC1_XB1P -TBP1 5 6 7 8 9 10 DC1_XB1P_1


B-1.1 / /B-4.1

DC1_XB1N 5 6 7 8 9 10 DC1_XB1N_1
B-1.1 / /B-4.1

3 1 3 1 3 1 3 1 3 1 3 1

-FDC101 -FDC102 -FDC103 -FDC104 -FDC105 -FDC106


63A 50A 50A 32A 32A 32A
250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2

4 -CT20_1 4 -CT20_2 4 -CT20_3 4 -CT20_4 4 -CT20_5 4 -CT20_6


1 1 1 1 1 1
Unauthorized duplication prohibited without written consent

-X63_1 1 2 -X50_1 1 2 -X50_1 3 4 -X32_1 1 2 -X32_1 3 4 -X32_1 5 6

DC1_MK2_XB1N

DC1_MK4_XB1N
DC1_MK2_XB1P

DC1_MK4_XB1P

DC1_INV_XB1N
DC1_INV_XB1P
XIN_CT201

XIN_CT202

XIN_CT203

XIN_CT204

XIN_CT205

XIN_CT206
XIP_CT201

XIP_CT202

XIP_CT203

XIP_CT204

XIP_CT205

XIP_CT206
B-14.9 /

B-14.9 /

=DLL_D02/B-4.2 /

=DLL_D02/B-4.2 /

B-14.9 /

B-14.9 /

=DLL_D04/B-4.7 /

=DLL_D04/B-4.8 /

B-14.9 /

B-14.9 /

B-14.9 /

B-14.9 /

B-14.9 /

B-14.9 /

=INV/B-2.2 /

=INV/B-2.3 /

B-14.9 /

B-14.9 /
DLL_D02-MK2 DLL_D04-MK4 SPARE =INV

14 11 /B-30.2 14 11 /B-30.3 14 11 /B-30.4 14 11 /B-30.5 14 11 /B-30.6 14 11 /B-30.7


12 12 12 12 12 12
96 95 /B-43.2 96 95 /B-43.3 96 95 /B-43.4 96 95 /B-43.5 96 95 /B-43.5 96 95 /B-43.6
98 98 98 98 98 98

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB1 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-3
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC1_XB1P_1 -TBP1 11 12 13 14 15 16 DC1_XB1P_2


B-3.10 / /B-5.1

DC1_XB1N_1 11 12 13 14 15 16 DC1_XB1N_2
B-3.10 / /B-5.1

3 1 3 1 3 1 3 1 3 1 3 1

-FDC107 -FDC108 -FDC109 -FDC110 -FDC111 -FDC112


25A 16A 16A 16A 16A 16A
250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2

4 -CT20_7 4 -CT20_8 4 -CT20_9 4 -CT20_10 4 -CT20_11 4 -CT20_12


1 1 1 1 1 1
Unauthorized duplication prohibited without written consent

-XINV_1 1 2 -X16_1 1 2 -X16_1 3 4 -X16_1 5 6 -X16_1 7 8 -X16_1 9 10

DC1_D02_XR1_N1

DC1_D04_XR1_N1

DC1_D02_XS1_N1

DC1_D04_XS1_N1
DC1_D02_XR1_P1

DC1_D04_XR1_P1
DC1_INV_XB1N_1

DC1_D02_XS1_P1

DC1_D04_XS1_P1
DC1_INV_XB1P_1

XIN_CT2010

XIN_CT2011

XIN_CT2012
XIP_CT2010

XIP_CT2011

XIP_CT2012
XIN_CT207

XIN_CT208

XIN_CT209
XIP_CT207

XIP_CT208

XIP_CT209
=INV/B-2.7 /

=INV/B-2.7 /

B-14.9 /

B-14.9 /

B-14.9 /

B-14.9 /

=DLL_D02/B-1.1 /

=DLL_D02/B-1.1 /

B-14.9 /

B-14.9 /

=DLL_D04/B-1.10 /

=DLL_D04/B-1.10 /

B-14.9 /

B-14.9 /

=DLL_D02/B-2.1 /

=DLL_D02/B-2.1 /

B-14.9 /

B-14.9 /

=DLL_D04/B-2.10 /

=DLL_D04/B-2.10 /

B-14.9 /

B-14.9 /
=INV =DLL_D02 =DLL_D04 =DLL_D02 =DLL_D04

14 11 /B-30.8 14 11 /B-30.9 14 11 /B-31.2 14 11 /B-31.3 14 11 /B-31.4 14 11 /B-31.5


12 12 12 12 12 12
96 95 /B-43.7 96 95 /B-43.8 96 95 /B-43.9 96 95 /B-43.9 96 95 /B-43.9 96 95 /B-43.8
98 98 98 98 98 98

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB1 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-4
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC1_XB1P_2 -TBP1 13 14 15 16 17 17
B-4.10 /

DC1_XB1N_2 13 14 15 16 17 17
B-4.10 /

3 1 3 1 3 1 3 1 3 1

-FDC113 -FDC114 -FDC115 -FDC116 -FDC117


16A 16A 16A 16A 16A
250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2

4 -CT20_13 4 -CT20_14 4 -CT20_15 4 -CT20_16 4 -CT20_17


1 1 1 1 1
Unauthorized duplication prohibited without written consent

-X16_1 11 12 -X16_1 13 14 -X16_1 15 16 -X16_1 17 18 -X16_1 19 20

E09_DC_XR1_N1

E09_DC_XS1_N1
E09_DC_XR1_P1

E09_DC_XS1_P1

XI1_ISO6851

XI2_ISO6851
XIN_CT2013

XIN_CT2014

XIN_CT2015

XIN_CT2016

XIN_CT2017
XIP_CT2013

XIP_CT2014

XIP_CT2015

XIP_CT2016

XIP_CT2017
DC_XR1N

DC_XS1N
DC_XR1P

DC_XS1P
=ELL_E02/B-1.1 /

=ELL_E02/B-1.1 /

B-15.9 /

B-15.9 /

=ELL_E09/B-1.10 /

=ELL_E09/B-1.10 /

B-15.9 /

B-15.9 /

=ELL_E02/B-2.1 /

=ELL_E02/B-2.1 /

B-15.9 /

B-15.9 /

=ELL_E09/B-2.10 /

=ELL_E09/B-2.10 /

B-15.9 /

B-15.9 /

B-15.9 /

B-15.9 /

B-12.5 /

B-12.7 /
=ELL_E02 ELL_E09 =ELL_E02 =ELL_E09

14 11 /B-31.6 14 11 /B-31.7 14 11 /B-31.8 14 11 /B-31.10 14 11 /B-32.2


12 12 12 12 12
96 95 /B-43.7 96 95 /B-43.6 96 95 /B-43.5 96 95 /B-43.5 96 95 /B-43.4
98 98 98 98 98

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB1 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-5
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC2_XB2N -TBP2 5 6 7 8 9 10 DC2_XB2P_1


B-2.9 / /B-7.1

DC2_XB2P 5 6 7 8 9 10 DC2_XB2N_1
B-2.9 / /B-7.1

3 1 3 1 3 1 3 1 3 1 3 1

-FDC201 -FDC202 -FDC203 -FDC204 -FDC205 -FDC206


63A 50A 50A 32A 32A 25A
250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2

4 -CT20_18 4 -CT20_19 4 -CT20_20 4 -CT20_21 4 -CT20_22 4 -CT20_23


1 1 1 1 1 1
Unauthorized duplication prohibited without written consent

-X63_2 1 2 -X50_2 1 2 -X50_2 3 4 -X32_2 1 2 -X32_2 3 4 -X25_2 1 2

DC2_MKE02_XB1N

DC2_MKE09_XB1N
DC2_MKE02_XB1P

DC2_MKE09_XB1P

DC2_INV_XB2N_1
DC2_INV_XB2P_1
DC2_INV_XB2N
DC2_INV_XB2P
-XDC 1 2
XIN_CT2018

XIN_CT2019

XIN_CT2020

XIN_CT2021

XIN_CT2022

XIN_CT2023
XIP_CT2018

XIP_CT2019

XIP_CT2020

XIP_CT2021

XIP_CT2022

XIP_CT2023
B-16.9 /

B-16.9 /

=ELL_E02/B-4.2 /

=ELL_E02/B-4.2 /

B-16.9 /

B-16.9 /

=ELL_E09/B-4.7 /

=ELL_E09/B-4.8 /

B-16.9 /

B-16.9 /

B-16.9 /

B-16.9 /

=INV/B-2.4 /

=INV/B-2.5 /

B-16.9 /

B-16.9 /

=INV/B-2.9 /

=INV/B-2.9 /

B-16.9 /

B-16.9 /
ELL_E02-MK ELL_E09-MK =CH48 =INV =INV

14 11 /B-34.2 14 11 /B-34.3 14 11 /B-34.4 14 11 /B-34.5 14 11 /B-34.6 14 11 /B-34.7


12 12 12 12 12 12
96 95 /B-44.2 96 95 /B-44.3 96 95 /B-44.4 96 95 /B-44.5 96 95 /B-44.5 96 95 /B-44.6
98 98 98 98 98 98

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB2 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-6
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC2_XB2P_1 -TBP2 11 12 13 14 15 16 DC2_XB2P_2


B-6.10 / /B-8.1

DC2_XB2N_1 11 12 13 14 15 16 DC2_XB2N_2
B-6.10 / /B-8.1

3 1 3 1 3 1 3 1 3 1 3 1

-FDC207 -FDC208 -FDC209 -FDC210 -FDC211 -FDC212


16A 16A 16A 16A 16A 16A
250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2

4 -CT20_24 4 -CT20_25 4 -CT20_26 4 -CT20_27 4 -CT20_28 4 -CT20_29


1 1 1 1 1 1
Unauthorized duplication prohibited without written consent

-X16_2 1 2 -X16_2 3 4 -X16_2 5 6 -X16_2 7 8 -X16_2 9 10 -X16_2 11 12

DC2_D02_XR2_N2

DC2_D04_XR2_N1

DC2_D02_XS2_N2

DC2_D04_XS2_N1
DC2_D02_XR2_P2

DC2_D04_XR2_P1

DC2_D02_XS2_P2

DC2_D04_XS2_P1
XIN_CT2024

XIN_CT2025

XIN_CT2026

XIN_CT2027

XIN_CT2028

XIN_CT2029
XIP_CT2024

XIP_CT2025

XIP_CT2026

XIP_CT2027

XIP_CT2028

XIP_CT2029
B-16.9 /

B-16.9 /

B-16.9 /

B-16.9 /

=DLL_D02/B-1.1 /

=DLL_D02/B-1.1 /

B-16.9 /

B-16.9 /

=DLL_D04/B-1.10 /

=DLL_D04/B-1.10 /

B-16.9 /

B-16.9 /

=DLL_D02/B-2.1 /

=DLL_D02/B-2.1 /

B-16.9 /

B-16.9 /

=DLL_D04/B-2.10 /

=DLL_D04/B-2.10 /

B-16.9 /

B-16.9 /
=DLL_D02 =DLL_D04 =DLL_D02 =DLL_D04

14 11 /B-34.8 14 11 /B-34.9 14 11 /B-35.2 14 11 /B-35.3 14 11 /B-35.4 14 11 /B-35.5


12 12 12 12 12 12
96 95 /B-44.7 96 95 /B-44.8 96 95 /B-44.9 96 95 /B-44.9 96 95 /B-44.9 96 95 /B-44.8
98 98 98 98 98 98

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB2 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-7
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC2_XB2P_2 -TBP2 13 14 15 16 17 18
B-7.10 /

DC2_XB2N_2 13 14 15 16 17 18
B-7.10 /

3 1 3 1 3 1 3 1 3 1

-FDC213 -FDC214 -FDC215 -FDC216 -FDC217


16A 16A 16A 16A 16A
250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2 250VDC 4 2

4 -CT20_30 4 -CT20_31 4 -CT20_32 4 -CT20_33 4 -CT20_34


1 1 1 1 1
Unauthorized duplication prohibited without written consent

-X16_2 13 14 -X16_2 15 16 -X16_2 17 18 -X16_2 19 20 -X16_2 21 22

E09_DC_XR2_N1

E09_DC_XS2_N1
E09_DC_XR2_P1

E09_DC_XS2_P1

XDCN_DC_M2

XI1_ISO6852

XI2_ISO6852
XDCP_DC_M2
XIN_CT2030

XIN_CT2031

XIN_CT2032

XIN_CT2033

XIN_CT2034
XIP_CT2030

XIP_CT2031

XIP_CT2032

XIP_CT2033

XIP_CT2034
DC_XR2N

DC_XS2N
DC_XR2P

DC_XS2P
=ELL_E02/B-1.1 /

=ELL_E02/B-1.1 /

B-17.9 /

B-17.9 /

=ELL_E09/B-1.10 /

=ELL_E09/B-1.10 /

B-17.9 /

B-17.9 /

=ELL_E02/B-2.1 /

=ELL_E02/B-2.1 /

B-17.9 /

B-17.9 /

=ELL_E09/B-2.10 /

=ELL_E09/B-2.10 /

B-17.9 /

B-17.9 /

=M1/B-1.2 /

=M1/B-1.3 /

B-17.9 /

B-17.9 /

B-13.5 /

B-13.7 /
=ELL_E02 ELL_E09 =ELL_E02 =ELL_E09 =M1

14 11 /B-35.6 14 11 /B-35.7 14 11 /B-35.8 14 11 /B-35.9 14 11 /B-33.2


12 12 12 12 12
96 95 /B-44.7 96 95 /B-44.6 96 95 /B-44.5 96 95 /B-44.5 96 95 /B-44.4
98 98 98 98 98

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BB2 DISTRIBUTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-8
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

=AC

/=AC/B-13.1

/=AC/B-13.2
-KAT
XDC1P 13 14

XDCP_DC_AC

XDCN_DC_AC
B-1.4 /
/B-9.2

-KAT
XDC2P 21 22
B-2.4 /
/B-9.2
Unauthorized duplication prohibited without written consent

-FDC

3 4 -XDC 1 2 3 4 5 6 7 8 9 10

1 2 11 12 13 14 15 16 17 18 19 20
A1
-KAT 10A
440VDC
A2

XDC_U1_N
XDC_U1_P
XDC_N
XDC_P
-KAT
XDC1N 43 44
B-1.4 /

B-10.1 /

B-10.1 /

B-19.2 /

B-19.2 /
/B-9.2

-KAT
XDC2N 31 32
B-2.4 /
/B-9.2

13 14 /B-9.3
21 22 /B-9.3
31 32 /B-9.3
43 44 /B-9.3

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
POWER SUPPLY DC + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-9
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

/B-9.6

/B-9.6
XDC_N
XDC_P

-XM2_L
4M 4F

/B-45.5
5M 5F

/B-45.5

3 1 3 1 3 1 3 1 3 1

-FR1 -FR2 -FISO1 -FISO2 -FS


10A 10A 10A 10A 10A
440VDC 4 2 440VDC 4 2 440VDC 4 2 440VDC 4 2 440VDC 4 2
Unauthorized duplication prohibited without written consent

XN_ISO1

XN_ISO2
XP_ISO1

XP_ISO2
XN_R1

XN_R2
XP_R1

XP_R2

XS_N
XS_P
B-22.4 /

B-22.4 /

B-24.4 /

B-24.4 /

B-12.2 /

B-12.2 /

B-13.2 /

B-13.2 /

B-11.1 /

B-11.4 /
14 11 /B-10.8 14 11 /B-10.8 14 11 /B-11.2 14 11 /B-11.6 14 11 /B-11.3
12 12 12 12 12
14 11 /B-11.5
12

=AC

XSP_AC_DC -XS 37 XSP_MCB_F


=AC/B-14.2 / /B-11.1

12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC1 -F11 -FVM11 -FDC2 -F21 -FVM21 -FR1 -FR2
/B-1.4 11 /B-1.5 11 /B-1.5 11 /B-2.4 11 /B-2.5 11 /B-2.5 11 /B-10.1 11 /B-10.3 11

XSP_DC_MCB_F -XS 38 XSP_MCB_F_1


=AC/B-39.7 / /B-11.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
POWER SUPPLY DC + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-10
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

AC =INV

XS_P XS_N
B-10.7 / B-10.7 /

/ =AC/B-12.7

/ =AC/B-12.7

/=INV/B-1.9

/=INV/B-1.9
XSP_CH1 XSN_AC
B-42.5 / B-42.5 /

-XS 1 -XS 21
XSP_CH2

AC1_DC_XCSN
AC1_DC_XBSL

AC1_DC_INV_XBSL

AC1_DC_INV_XCSN
B-42.5 /
2 22
XSP_DC_AC XSP_F2759 XSN_LED
=AC/B-2.3 / /B-21.1 /B-39.1
3 23
AC XSP_C XSN_K
/B-26.1 /B-20.2
4 24
XSP_BP XSN_FDC00
/B-27.6 /B-36.3
5 25
XSP_VM XSN_VM -WACDC_2 1 2
/B-18.1 /B-18.1
6 26
XSP_DOOR XSN_IO1
/B-28.5 /B-26.1 -XAC 1 3 2 4
7 27
XSP_FDC00_IND XSN_IO2
/B-20.3 /B-30.1
Unauthorized duplication prohibited without written consent

8 28
XSP_FDC11_IND
/B-20.5
9 29
XSP_FDC21_IND
/B-20.8
10 30
XSP_BCU
/B-36.3
11
XSP_SWAM
/B-27.7
12
XSP_TRIP_FAC
/B-42.5
13
XSP_FDC1X_OFF 1 3
/B-30.1
14 11 /B-11.4
14 -FAC
XSP_FDC2X_OFF 10A
12
/B-34.2 2 4
230VAC
15
XSP_FDC00
/B-36.5
16

17

18

19

20 1M
-XM8
/B-45.9
1F

3 2 21 21
-XM2_L -HG %rF -LS2 -LS1
XSP_MCB_F 1M 1F /B-28.5 /B-28.5
B-10.9 / L 22 22
/B-45.5

X1 X1 X1
12 14 12 14 12 14 12 14 12 14 -R1 -H2 -H1
-FISO1 -FS -FAC -FR2 -FISO2 X2 X2 X2
/B-10.4 11 /B-10.7 11 /B-11.9 11 /B-10.3 11 /B-10.6 11 2F

-XM8
/B-45.9 2M

-XM2_L
XSP_MCB_F_1 2M 2F
B-10.9 /
/B-45.5

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
POWER SUPPLY DC,AC + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-11
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XP_ISO1 XP_ISO1_EDS1
B-10.4 / /B-14.2

XN_ISO1 XN_ISO1_EDS1
B-10.4 / /B-14.2

XI1_ISO6851 XI2_ISO6851
/B-5.9 /B-5.9

PE

A1/+ A2/- L1/+ L2 L3/- KE E

BENDER IS0685_1
/B-40.6
Unauthorized duplication prohibited without written consent

ON
IT-System

EDS MENU
OK
PGH ON >20 M TEST

SERVICE
DATA INFO
ALARM 1
R(an) 40k/10k
ALARM 2

X1
I1 I2 I3 A B

A_EDS2_ISO
B-15.4 /
B_EDS2_ISO
B-15.4 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION ISO685-1 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-12
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XP_ISO2 XP_ISO2_EDS3
B-10.6 / /B-16.2

XN_ISO2 XN_ISO2_EDS3
B-10.6 / /B-16.2

XI1_ISO6852 XI2_ISO6852
/B-8.9 /B-8.9

PE

A1/+ A2/- L1/+ L2 L3/- KE E

BENDER IS0685_2
/B-40.8
Unauthorized duplication prohibited without written consent

ON
IT-System

EDS MENU
OK
PGH ON >20 M TEST

SERVICE
DATA INFO
ALARM 1
R(an) 40k/10k
ALARM 2

X1
I1 I2 I3 A B

A_EDS4_ISO2
B-17.4 /
B_EDS4_ISO2
B-17.4 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION ISO685-2 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-13
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XIP_CT201
/B-3.3
XIP_CT202
/B-3.4
XIP_CT203
/B-3.5
XIP_CT204
/B-3.7
XIP_CT205
/B-3.8
XIP_CT206
/B-3.10
XP_ISO1_EDS1 XP_EDS1_EDS2 XIP_CT207
B-12.5 / /B-15.2 /B-4.3
XIP_CT208
/B-4.4
XN_ISO1_EDS1 XN_EDS1_EDS2 XIP_CT209
B-12.5 / /B-15.2 /B-4.5
XIP_CT2010
/B-4.7
XIP_CT2011
/B-4.8
XIP_CT2012
/B-4.10

11 21 31 41 51 61 71 81 91 101 111 121


A1/+ A2/-
12 22 32 42 52 62 72 82 92 102 112 122

XIN_CT2012
Unauthorized duplication prohibited without written consent

I /B-4.10
XIN_CT2011
K
BENDER -EDS440_1
/B-4.8
XIN_CT2010
/B-4.7
XIN_CT209
/B-4.6
XIN_CT208
/B-4.4
XIN_CT207
/B-4.3
XIN_CT206
/B-3.10
XIN_CT205
/B-3.8
XIN_CT204
/B-3.7
XIN_CT203
/B-3.6
XIN_CT202
/B-3.4
XIN_CT201
/B-3.3

ON CHANEL

1 2 3 4 5 6
MENU
PGH ON
7 8 9 10 11 12

SERVICE SLAVE ADDRESS TEST


1 1
ALARM 1
INFO
ALARM 2

X1 T3 T4 23 24

I1 I2 A B

A_EDS1_EDS2
/B-15.3

B_EDS1_EDS2
/B-15.3

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION EDS440-1 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-14
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XIP_CT2013
/B-5.3
XIP_CT2014
/B-5.4
XIP_CT2015
/B-5.5
XIP_CT2016
/B-5.7
XIP_CT2017
/B-5.8

XP_EDS1_EDS2
B-14.4 /

XN_EDS1_EDS2
B-14.4 /

11 21 31 41 51 61 71 81 91 101 111 121


A1/+ A2/-
12 22 32 42 52 62 72 82 92 102 112 122
Unauthorized duplication prohibited without written consent

I
K
BENDER -EDS440_2

XIN_CT2017
/B-5.8
XIN_CT2016
/B-5.7
XIN_CT2015
/B-5.6
XIN_CT2014
/B-5.4
XIN_CT2013
/B-5.3

ON CHANEL

1 2 3 4 5 6
MENU
PGH ON
7 8 9 10 11 12

SERVICE SLAVE ADDRESS TEST


1 1
ALARM 1
INFO
ALARM 2

X1 T3 T4 23 24

I1 I2 A B

A_EDS1_EDS2 A_EDS2_ISO
B-14.4 / /B-12.3

B_EDS1_EDS2 B_EDS2_ISO
B-14.4 / /B-12.3

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION EDS440-2 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-15
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XIP_CT2018
/B-6.3
XIP_CT2019
/B-6.4
XIP_CT2020
/B-6.5
XIP_CT2021
/B-6.7
XIP_CT2022
/B-6.8
XIP_CT2023
/B-6.10
XP_ISO2_EDS3 XP_EDS3_EDS4 XIP_CT2024
B-13.5 / /B-17.2 /B-7.3
XIP_CT2025
/B-7.4
XN_ISO2_EDS3 XN_EDS3_EDS4 XIP_CT2026
B-13.5 / /B-17.2 /B-7.5
XIP_CT2027
/B-7.7
XIP_CT2028
/B-7.8
XIP_CT2029
/B-7.10

11 21 31 41 51 61 71 81 91 101 111 121


A1/+ A2/-
12 22 32 42 52 62 72 82 92 102 112 122

XIN_CT2018
Unauthorized duplication prohibited without written consent

I /B-6.3
XIN_CT2019
K
BENDER -EDS440_3
/B-6.4
XIN_CT2020
/B-6.6
XIN_CT2021
/B-6.7
XIN_CT2022
/B-6.8
XIN_CT2023
/B-6.10
XIN_CT2024
/B-7.3
XIN_CT2025
/B-7.4
XIN_CT2026
/B-7.6
XIN_CT2027
/B-7.7
XIN_CT2028
/B-7.8
XIN_CT2029
/B-7.10

ON CHANEL

1 2 3 4 5 6
MENU
PGH ON
7 8 9 10 11 12

SERVICE SLAVE ADDRESS TEST


1 1
ALARM 1
INFO
ALARM 2

X1 T3 T4 23 24

I1 I2 A B

A_EDS3_EDS4
/B-17.3

B_EDS3_EDS4
/B-17.3

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION EDS440-3 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-16
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XIP_CT2030
/B-8.3
XIP_CT2031
/B-8.4
XIP_CT2032
/B-8.5
XIP_CT2033
/B-8.7
XIP_CT2034
/B-8.8

XP_EDS3_EDS4
B-16.4 /

XN_EDS3_EDS4
B-16.4 /

11 21 31 41 51 61 71 81 91 101 111 121


A1/+ A2/-
12 22 32 42 52 62 72 82 92 102 112 122
Unauthorized duplication prohibited without written consent

I
K
BENDER -EDS440_4

XIN_CT2034
/B-8.8
XIN_CT2033
/B-8.7
XIN_CT2032
/B-8.6
XIN_CT2031
/B-8.4
XIN_CT2030
/B-8.3

ON CHANEL

1 2 3 4 5 6
MENU
PGH ON
7 8 9 10 11 12

SERVICE SLAVE ADDRESS TEST


1 1
ALARM 1
INFO
ALARM 2

X1 T3 T4 23 24

I1 I2 A B

A_EDS3_EDS4 A_EDS4_ISO2
B-16.4 / /B-13.3

B_EDS3_EDS4 B_EDS4_ISO2
B-16.4 / /B-13.3

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION EDS440-4 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-17
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20 DC1_485_15
B-19.9 /

DC1_485_14
B-19.9 /

14 15 14 15

-V1 -V2

VOLTAGE/CURRENT INPUTS 85-265 VAC/DC VOLTAGE/CURRENT INPUTS 85-265 VAC/DC

1 3 13 9 10 1 3 13 9 10
Unauthorized duplication prohibited without written consent

DC1_XVMP1 PE DC2_XVMP2 PE
B-1.5 / B-2.5 /
-GND -GND
DC1_XVMN1 DC2_XVMN2
B-1.6 / B-2.6 /

-XM2_C
XSP_VM 1M 1F
B-11.3 /
/B-45.6
XSN_VM 2M 2F
B-11.6 /
/B-45.6

14 15 14 15

-A1 -A2

VOLTAGE/CURRENT INPUTS 85-265 VAC/DC VOLTAGE/CURRENT INPUTS 85-265 VAC/DC

5 6 13 9 10 5 6 13 9 10

DC1_XAMP1 PE DC2_XAMP2 PE
B-1.7 / B-2.7 /
-GND -GND
DC1_XAMN1 DC2_XAMN2
B-1.7 / B-2.7 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
METTER + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-18
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

=SVR

/
T1_DC1_SVR
XDC_U1_P
B-9.6 /

XDC_U1_N
B-9.7 /

-U1
Unauthorized duplication prohibited without written consent

L(+) N(-) -T1


MINI POWER SUPPLY
NETWORK INTERFACE
(+) (+) (+) (-) (-) (-) (-) MODULE

POWER SUPLY

DC1_485_15
/B-18.1

DC1_485_14
/B-18.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION METTER + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-19
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

/B-11.3

/B-11.3

/B-11.3
XSP_FDC00_IND

XSP_FDC11_IND

XSP_FDC21_IND
1M 1M 1M
-XM00 -XM11 -XM21
/B-45.1 /B-45.2 /B-45.4
1F 1F 1F
Unauthorized duplication prohibited without written consent

12 14 96 98 12 14 96 98 12 14 96 98
-FDC00 FDC00 -FDC11 -FDC11 -FDC21 -FDC21
/B-1.6 11 /B-1.6 95 /B-1.3 11 /B-1.3 95 /B-2.3 11 /B-2.3 95

2F 3F 2F 3F 2F 3F

-XM00 -XM11 -XM21


/B-45.1 /B-45.2 /B-45.4
2M 3M 2M 3M 2M 3M

A1 A1 A1 A1 A1 A1
-K00 -KT00 -K11 -KT11 -K21 -KT21
A2 A2 A2 A2 A2 A2

XSN_K DC1_XSN_K_1
B-11.6 / /B-21.1
13 14 /B-40.2 13 14 /B-39.2 13 14 /B-40.3 13 14 /B-39.3 13 14 /B-40.4 13 14 /B-39.4
21 22 /B-40.2 21 22 21 22 /B-40.4 21 22 21 22 /B-40.5 21 22
31 32 31 32 31 32 31 32 31 32 31 32
43 44 /B-26.2 43 44 /B-26.3 43 44 /B-26.4 43 44 /B-26.5 43 44 /B-26.6 43 44 /B-26.7

FAC00 CLOSED FAC00 TRIPED FAC11 CLOSED FAC11 TRIPED FAC21 CLOSED FAC21 TRIPED

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
AUXILIARY RELAYS FOR INCOMING APTOMAT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-20
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XSP_F2759
B-11.3 /

12 14 12 14 12 14 12 14 12 14 12 14
-F27_1 -F59_11 -F27_2 -F59_21 -F59_12 -F59_22
/B-1.6 11 /B-1.8 11 /B-2.6 11 /B-2.7 11 /B-1.9 11 /B-2.9 11
Unauthorized duplication prohibited without written consent

21 21 31 31
-KT27_1 -KT27_2 -KT27_1 -KT27_2
/B-21.2 22 /B-21.4 22 /B-21.2 32 /B-21.4 32

A1 A1 A1 A1 A1 A1
-KT27_1 -KT59_11 -KT27_2 -KT59_21 -KT59_12 -KT59_22
A2 A2 A2 A2 A2 A2

DC1_XSN_K_1 DC1_XSN_KBP
B-20.10 / /B-41.5

13 14 /B-39.5 13 14 /B-39.8 13 14 /B-39.7 13 14 /B-39.6 13 14 /B-39.8


13 14 /B-39.9
21 22 /B-21.3 21 22 21 22 /B-21.5 21 22 21 22
21 22
31 32 /B-21.6 31 32 31 32 /B-21.7 31 32 31 32
31 32
43 44 /B-26.8 43 44 /B-27.4 43 44 /B-27.2 43 44 /B-26.9 43 44 /B-27.3
43 44 /B-27.5

F27_1 TRIP F59_1 ALARM F27_2 TRIP F59_2 ALARM F59_1 TRIP F59_2 TRIP

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
AUXILIARY RELAYS FOR OVER AND UNDER + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-21
VOLTAGE RELAY PECC4-20-09 CSE_ DC
Leading Integration
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

=SVR
-IO1
/B-23.2
SVR_DC_IO1
/=SVR/B-8.7

TX RX TX RX
PORT 1A PORT 1B
Unauthorized duplication prohibited without written consent

XP_R1
B-10.1 /

XN_R1
B-10.1 /
Z05 Z06 Z07 Z08

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION IO1 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-22
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20 -IO1

FUNCTION FUNCTION FUNCTION


A01 B01 C01
OUT101 /B-36.4 FDC00 INTERLOCK IN201 /B-26.2 FDC00 CLOSED IN301 /B-28.2 SPARE
A02 B02 C02
A03 B03 C03
OUT102 /B-37.5 FDC11 INTERLOCK IN202 /B-26.3 FDC00 TRIPPED IN302 /B-28.3 SPARE
A04 B04 C04
A05 B05 C05
OUT103 /B-38.5 FDC21 INTERLOCK IN203 /B-26.4 FDC11 CLOSED IN303 /B-28.4 SPARE
A06 B06 C06
A07 B07 C07
OUT104 /B-36.3 FDC00 CLOSE CMD IN204 /B-26.5 FDC11 TRIPPED IN304 /B-28.5 DOOR CLOSED
A08 B08 C08
A09 B09 C09
OUT105 /B-37.4 FDC11 CLOSE CMD IN205 /B-26.6 FDC21 CLOSED IN305 /B-28.6 CHAGER 1 ALARM
A10 B10 C10
A11 B11 C11
OUT106 /B-38.4 FDC21 CLOSE CMD IN206 /B-26.7 FDC21 TIRPPED IN306 /B-28.7 CHAGER 1 FAIL
A12 B12 C12
A13 B13 C13
OUT107 /B-36.5 FDC00 OPEN CMD IN207 /B-26.8 F27_1 TIRPPED IN307 /B-28.8 CHAGER 2 ALARM
A14 B14 C14
A15 B15 C15
OUT108 /B-37.6 FDC11 OPEN CMD IN208 /B-26.9 F59_1 TRIPPED IN308 /B-28.9 CHAGER 2 FAIL
A16 B16 C16
A17 B17 C17 CONTACT MCB
OUT109 /B-38.6 FDC21 OPEN CMD IN209 /B-27.2 F27_2 TRIPPED IN309 /B-29.2
Unauthorized duplication prohibited without written consent

A18 B18 C18 INPUT CHANGE 1


A19 B19 C19 CONTACT MCCB
OUT110 SPARE IN210 /B-27.3 F59_2 TRIPPED IN310 /B-29.3
A20 B20 C20 BATTERY CHANGE 1
A21 B21 C21 CONTACT MCCB
OUT111 SPARE IN211 /B-27.4 F59_1 ALARM IN311 /B-29.4
A22 B22 C22 OUTPUT CHANGE 1
A23 B23 C23 CONTACT MCB
OUT112 SPARE IN212 /B-27.5 F59_2 ALARM IN312 /B-29.5
A24 B24 C24 INPUT CHANGE 2
A25 B25 C25 CONTACT MCCB
IN213 /B-27.6 SW BYPASS IN313 /B-29.6
OUT113 A26 /B-42.5 FAC102 TRIP B26 C26 BATTERY CHANGE 2
A27 B27 C27 CONTACT MCCB
IN214 /B-27.7 SW ON AUTO IN314 /B-29.7
A28 B28 C28 OUTPUT CHANGE 2
OUT114 A29 /B-42.4 FAC202 TRIP B29 C29
IN215 /B-27.8 SPARE IN315 /B-29.8 SPARE
A30 B30 C30
A31 B31 C31
IN216 /B-27.9 SPARE IN316 /B-29.9 SPARE
OUT115 A32 SPARE B32 C32
A33
A34
OUT116 A35 SPARE
A36

/B-22.7

TX RX
PORT2
PORT 1A

/B-22.8
Z05
TX RX /B-22.6 Z06
PORT3
PORT 1B Z07
SEL-2440 Z08

SCHWEITZER
ENGINEERING
LABORATORIES Z09

PULLMAN, WASHINGTON USA

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 MODULE + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-23
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

=SVR
-IO2
/B-25.2
SVR_DC_IO2
/=SVR/B-8.7

TX RX TX RX
PORT 1A PORT 1B
Unauthorized duplication prohibited without written consent

XP_R2
B-10.3 /

XN_R2
B-10.3 /
Z05 Z06 Z07 Z08

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONNECTION IO2 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-24
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
-IO2

FUNCTION FUNCTION FUNCTION


A01 B01 C01
IN101 /B-30.2 FDC101 OFF IN201 /B-32.2 FDC117 OFF IN301 /B-34.2 FDC201 OFF
A02 B02 C02
A03 B03 C03
IN102 /B-30.3 FDC102 OFF IN202 /B-32.3 AC PANEL MCB OFF IN302 /B-34.3 FDC202 OFF
A04 B04 C04
A05 B05 C05
IN103 /B-30.4 FDC103 OFF IN203 /B-32.4 SPARE IN303 /B-34.4 FDC203 OFF
A06 B06 C06
A07 B07 C07
IN104 /B-30.5 FDC104 OFF IN204 /B-32.5 SPARE IN304 /B-34.5 FDC204 OFF
A08 B08 C08
A09 B09 C09
IN105 /B-30.6 FDC105 OFF IN205 /B-32.6 SPARE IN305 /B-34.6 FDC205 OFF
A10 B10 C10
A11 B11 C11
IN106 /B-30.7 FDC106 OFF IN206 /B-32.7 SPARE IN306 /B-34.7 FDC206 OFF
A12 B12 C12
A13 B13 C13
IN107 /B-30.8 FDC107 OFF IN207 /B-32.8 SPARE IN307 /B-34.8 FDC207 OFF
A14 B14 C14
A15 B15 C15
IN108 /B-30.9 FDC108 OFF IN208 /B-32.9 SPARE IN308 /B-34.9 FDC208 OFF
A16 B16 C16
A17 B17 C17
IN109 /B-31.2 FDC109 OFF IN209 /B-33.2 FDC217 OFF IN309 /B-35.2 FDC209 OFF
Unauthorized duplication prohibited without written consent

A18 B18 C18


A19 B19 C19
IN110 /B-31.3 FDC110 OFF IN210 /B-33.3 FDC2X TRIPPED IN310 /B-35.3 FDC210 OFF
A20 B20 C20
A21 B21 C21
IN111 /B-31.4 FDC111 OFF IN211 /B-33.4 FDC1X TRIPED IN311 /B-35.4 FDC211 OFF
A22 B22 C22
A23 B23 C23
IN112 /B-31.5 FDC112 OFF IN212 /B-33.5 SPARE IN312 /B-35.5 FDC212 OFF
A24 B24 C24
A25 B25 C25
IN113 /B-31.6 FDC113 OFF IN213 /B-33.6 SPARE IN313 /B-35.6 FDC213 OFF
A26 B26 C26
A27 B27 C27
IN114 /B-31.7 FDC114 OFF IN214 /B-33.7 SPARE IN314 /B-35.7 FDC214 OFF
A28 B28 C28
A29 B29 C29
IN115 /B-31.8 FDC115 OFF IN215 /B-33.8 SPARE IN315 /B-35.8 FDC215 OFF
A30 B30 C30
A31 B31 C31
IN116 /B-31.10 FDC116 OFF IN216 /B-33.9 SPARE IN316 /B-35.9 FDC216 OFF
A32 B32 C32

/B-24.7

TX RX
PORT2
PORT 1A

/B-24.8
Z05
TX RX Z06
/B-24.6
PORT3
PORT 1B Z07
SEL-2440 Z08

SCHWEITZER
ENGINEERING
LABORATORIES Z09

PULLMAN, WASHINGTON USA

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 MODULE + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-25
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
FDC00 CLOSED FDC00 TRIPPED FDC11 CLOSED FDC11 TRIPPED FDC21 CLOSED FDC21 TIRPPED F27_1 TIRPPED F59_1 TRIPPED

XSP_C XSP_T
B-11.3 / /B-27.1
Unauthorized duplication prohibited without written consent

-K00 43 -KT00 43 -K11 43 -KT11 43 -K21 43 -KT21 43 -KT27_1 43 43


/B-20.3 /B-20.4 /B-20.5 /B-20.6 /B-20.8 /B-20.9 /B-21.2 -KT59_12
44 44 44 44 44 44 44 /B-21.6 44

-IO1
/B-22.5
B01 B03 B05 B07 B09 B11 B13 B15

IN201 IN202 IN203 IN204 IN205 IN206 IN207 IN208

B02 B04 B06 B08 B10 B12 B14 B16

XSN_IO1 XSN_IO1_1
B-11.6 / /B-27.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-26
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
F27_2 TRIPPED F59_2 TRIPPED F59_1 ALARM F59_2 ALARM SW BYPASS SW ON AUTO SPARE SPARE

XSP_T XSP_LED
B-26.10 / /B-39.1

/B-11.3

/B-11.3
XSP_SWAM
XSP_BP
Unauthorized duplication prohibited without written consent

3M
-XM2_C
/B-45.6
3F

DC1_XSP_SWAM_1
-KT27_2 43 43 43 43 13 3
/B-21.4 -KT59_22 -KT59_11 -KT59_21 -KBP -SWAM
44 /B-21.7 44 /B-21.3 44 /B-21.5 44 /B-41.6 14 /B-45.4 4

B-36.3 /
4F

-XM2_C
/B-45.6 4M

-IO1
/B-22.5
B17 B19 B21 B23 B25 B27 B29 B31

IN209 IN210 IN211 IN212 IN213 IN214 IN215 IN216

B18 B20 B22 B24 B26 B28 B30 B32

XSN_IO1_1 XSN_IO1_2
B-26.10 / /B-28.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-27
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
SPARE SPARE SPARE DOOR CLOSED CHAGER 1 ALARM CHAGER 1 FAIL CHAGER 2 ALARM CHAGER 2 FAIL

/B-11.3

/B-42.5

/B-42.5

/B-42.5

/B-42.5
XSP_CH1_AL

XSP_CH1_F

XSP_CH2_AL

XSP_CH2_F
XSP_DOOR
Unauthorized duplication prohibited without written consent

13
-LS1
/B-11.9 14

3M
-XM8
/B-45.9
3F

13
-LS2
/B-11.8 14

4F

-XM8
/B-45.9
4M

-IO1
/B-22.5
C01 C03 C05 C07 C09 C11 C13 C15

IN301 IN302 IN303 IN304 IN305 IN306 IN307 IN308

C02 C04 C06 C08 C10 C12 C14 C16

XSN_IO1_2 XSN_IO1_3
B-27.10 / /B-29.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-28
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
CONTACT MCB CONTACT MCCB CONTACT MCCB CONTACT MCB CONTACT MCCB CONTACT MCCB SPARE SPARE
INPUT CHANGE 1 BATTERY CHANGE 1 OUTPUT CHANGE 1 INPUT CHANGE 2 BATTERY CHANGE 2 OUTPUT CHANGE 2

/ B-42.5

/ B-42.5

/ B-42.5

/ B-42.5

/ B-42.5

/ B-42.5
Unauthorized duplication prohibited without written consent

XSP_CH1_1

XSP_CH1_2

XSP_CH1_3

XSP_CH2_1

XSP_CH2_2

XSP_CH2_3
NGAYF 03/07

-XS 40 -XS 41 -XS 42 -XS 43 -XS 44 -XS 45

-IO1
/B-22.5
C17 C19 C21 C23 C25 C27 C29 C31

IN309 IN310 IN311 IN312 IN313 IN314 IN315 IN316

C18 C20 C22 C24 C26 C28 C30 C32

XSN_IO1_3
B-28.10 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO1 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-29
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
FDC101 OFF FDC102 OFF FDC103 OFF FDC104 OFF FDC105 OFF FDC106 OFF FDC107 OFF FDC108 OFF

XSP_FDC1X_OFF XSP_FDC1X_OFF_1
B-11.3 / /B-31.1
Unauthorized duplication prohibited without written consent

12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC101 -FDC102 -FDC103 -FDC104 -FDC105 -FDC106 -FDC107 -FDC108
/B-3.2 11 /B-3.3 11 /B-3.5 11 /B-3.6 11 /B-3.8 11 /B-3.9 11 /B-4.2 11 /B-4.3 11

1F 2F 3F 4F 5F
8F 9F 10F -XM3
-XM2_L /B-45.2 1M 2M 3M 4M 5M
/B-45.5
8M 9M 10M

-IO2
/B-24.5
A01 A03 A05 A07 A09 A11 A13 A15

IN101 IN102 IN103 IN104 IN105 IN106 IN107 IN108

A02 A04 A06 A08 A10 A12 A14 A16

-XM4
XSN_IO2 7M 7F XSN_IO2_1
B-11.6 / /B-31.1
/B-45.4

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-30
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
FDC109 OFF FDC110 OFF FDC111 OFF FDC112 OFF FDC113 OFF FDC114 OFF FDC115 OFF FDC116 OFF

XSP_FDC1X_OFF_1
B-30.10 /
Unauthorized duplication prohibited without written consent

XSP_FDC1X_OFF_2
/B-32.1

12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC109 -FDC110 -FDC111 -FDC112 -FDC113 -FDC114 -FDC115 12 14
/B-4.5 11 /B-4.6 11 /B-4.8 11 /B-4.9 11 /B-5.2 11 /B-5.3 11 /B-5.5 11 -FDC116
/B-5.6 11

6F 7F 8F 9F 10F 1F 2F 3F

-XM3 -XM4
/B-45.2 6M 7M 8M 9M 10M /B-45.4 1M 2M 3M

-IO2
/B-24.5
A17 A19 A21 A23 A25 A27 A29 A31

IN109 IN110 IN111 IN112 IN113 IN114 IN115 IN116

A18 A20 A22 A24 A26 A28 A30 A32

XSN_IO2_1 XSN_IO2_2
B-30.10 / /B-32.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-31
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
FDC117 OFF AC PANEL MCB OFF SPARE SPARE SPARE SPARE SPARE SPARE

XSP_FDC1X_OFF_2 XSP_FDC1X_T
B-31.10 / /B-43.1
Unauthorized duplication prohibited without written consent

AC
/ =AC/B-2.3
XSP_AC_MCB_F

12 14
-FDC117
/B-5.8 11

4F

-XM4
/B-45.4 4M -XS 39

9M
-XM4
/B-45.4
9F

-IO2
/B-24.5
B01 B03 B05 B07 B09 B11 B13 B15

IN201 IN202 IN203 IN204 IN205 IN206 IN207 IN208

B02 B04 B06 B08 B10 B12 B14 B16

XSN_IO2_2 XSN_IO2_3
B-31.10 / /B-33.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-32
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
FDC217 OFF FDC2X TRIPPED FDC1X TRIPED SPARE SPARE SPARE SPARE SPARE

XSP_FDC2X_OFF_2 XSP_FDC2X_T
Unauthorized duplication prohibited without written consent

B-35.10 / /B-44.1
/B-44.3

/B-43.3
XSP_FDC2X_T1

FDC1X_T

12 14
-FDC217
/B-8.8 11

-IO2
/B-24.5
B17 B19 B21 B23 B25 B27 B29 B31

IN209 IN210 IN211 IN212 IN213 IN214 IN215 IN216

B18 B20 B22 B24 B26 B28 B30 B32

XSN_IO2_3 XSN_IO2_4
B-32.10 / /B-34.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-33
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
FDC201 OFF FDC202 OFF FDC203 OFF FDC204 OFF FDC205 OFF FDC206 OFF FDC207 OFF FDC208 OFF

/B-11.3
XSP_FDC2X_OFF

3M
-XM2_L
/B-45.5
3F

XSP_FDC2X_OFF_1
Unauthorized duplication prohibited without written consent

/B-35.1

12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC201 -FDC202 -FDC203 -FDC204 -FDC205 -FDC206 -FDC207 -FDC208
/B-6.2 11 /B-6.3 11 /B-6.5 11 /B-6.6 11 /B-6.8 11 /B-6.9 11 /B-7.2 11 /B-7.3 11

-IO2
/B-24.5
C01 C03 C05 C07 C09 C11 C13 C15

IN301 IN302 IN303 IN304 IN305 IN306 IN307 IN308

C02 C04 C06 C08 C10 C12 C14 C16

XSN_IO2_4 XSN_IO2_5
B-33.10 / /B-35.1

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-34
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
FDC209 OFF FDC210 OFF FDC211 OFF FDC212 OFF FDC213 OFF FDC214 OFF FDC215 OFF FDC216 OFF

XSP_FDC2X_OFF_1 XSP_FDC2X_OFF_2
Unauthorized duplication prohibited without written consent

B-34.10 / /B-33.1

12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-FDC209 -FDC210 -FDC211 -FDC212 -FDC213 -FDC214 -FDC215 -FDC216
/B-7.5 11 /B-7.6 11 /B-7.8 11 /B-7.9 11 /B-8.2 11 /B-8.3 11 /B-8.5 11 /B-8.6 11

-IO2
/B-24.5
C17 C19 C21 C23 C25 C27 C29 C31

IN309 IN310 IN311 IN312 IN313 IN314 IN315 IN316

C18 C20 C22 C24 C26 C28 C30 C32

XSN_IO2_5
B-34.10 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
IO2 DIGITAL INPUT + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-35
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC1_XSP_SWAM_1 DC1_XSP_SWBP
B-27.8 / /B-41.5
1
-SWAM
/B-45.4 2
DC1_XSP_MA
/B-37.3

XSP_BCU DC1_XSP_CL
B-11.3 / /B-37.3

-IO1 A07 NO NC -IO1 A13 NO NC


OUT104 -PR00 OUT107 -PG00
/B-23.1 /B-23.1
FDC00 CLOSE CMD A08 /B-45.1 COM FDC00 OPEN CMD A14 /B-45.1 COM

4F 5F
Unauthorized duplication prohibited without written consent

-XM5 -XM5
/B-45.5 4M /B-45.5 5M

23 -IO1 A01

-KBP OUT101
/B-23.1
/B-41.6 24 FDC00 INTERLOCK A02

XSP_FDC00
/B-11.3

XSP_FDC11
/B-37.6
4M 5M 6M
-XM00
/B-45.1
4F 5F 6F

C11 A1 U1

-FDC00
/B-1.6

U2

8F

-XM00
/B-45.1
8M

XSN_FDC00 DC1_XSN_CTRL_1
B-11.6 / /B-37.3

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONTROL FDC00 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-36
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC1_XSP_MA
B-36.7 /

DC1_XSP_CL DC1_XSP_CL_1
B-36.7 / /B-38.3

DC1_XSP_MA_1
/B-38.3

-IO1 A09 NO NC -IO1 A15 NO NC


OUT105 -PR11 OUT108 -PG11
/B-23.1 /B-23.1
FDC11 CLOSE CMD /B-45.2 COM FDC11 OPEN CMD /B-45.2 COM
A10 A16
Unauthorized duplication prohibited without written consent

6F 7F

-XM5
/B-45.5
6M 7M

33 -IO1 A03

-KBP OUT102
/B-23.1
/B-41.6 34 FDC11 INTERLOCK A04

XSP_FDC11
/B-36.5

XSP_FDC21
/B-38.6
4M 5M 6M
-XM11
/B-45.2
4F 5F 6F

C11 A1 U1

-FDC11
/B-1.3

U2

8F

-XM11
/B-45.2
8M

DC1_XSN_CTRL_1 DC1_XSN_CTRL_2
B-36.7 / /B-38.3

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONTROL FDC11 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-37
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC1_XSP_MA_1
B-37.7 /

DC1_XSP_CL_1
B-37.7 /

-IO1 A11 NO NC -IO1 A17 NO NC


OUT106 -PR21 OUT109 -PG21
/B-23.1 /B-23.1
FDC21 CLOSE CMD A12 /B-45.3 COM FDC21 OPEN CMD A18 /B-45.3 COM
Unauthorized duplication prohibited without written consent

8F 9F

-XM5 -XM5
/B-45.5 /B-45.5
8M 9M

43 -IO1 A05

-KBP OUT103
/B-23.1
/B-41.6 44 FDC21 INTERLOCK A06

XSP_FDC21
/B-37.6

4M 5M 6M
-XM21
/B-45.4
4F 5F 6F

C11 A1 U1

-FDC11
/B-1.3

U2

8F

-XM21
/B-45.4
8M

DC1_XSN_CTRL_2
B-37.7 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CONTROL FDC21 + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-38
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XSP_LED DC1_XSP_LED_1
B-27.6 / /B-40.1

13 13 13 13 13 13 13 13 13
-KT00 -KT11 -KT21 -KT27_1 -KT59_12 -KT27_2 -KT59_22 -KT59_11 -KT59_21
/B-20.4 14 /B-20.6 14 /B-20.9 14 /B-21.2 14 /B-21.6 14 /B-21.4 14 /B-21.7 14 /B-21.3 14 /B-21.5 14
Unauthorized duplication prohibited without written consent

1M 2M 3M 4M 5M 6M 7M 8M 9M
-XM6
/B-45.6
1F 2F 3F 4F 5F 6F 7F 8F 9F

x1 x1 x1 x1 x1 x1 x1 x1 x1
-HT00 -HT11 -HT21 -HT27_1 -HT59_1 -HT27_2 -HT59_2 -HA59_1 -HA59_2
x2 x2 x2 x2 x2 x2 x2 x2 x2

-XM5
XSN_LED 10M 10F DC1_XSN_LED_1
B-11.6 / /B-40.1
/B-45.5

FDC00 TRIP FDC11 TRIP FDC21 TRIP F27_1TRIP F59_1 TRIP F27_2 TRIP F59_2 TRIP F59_1 ALARM F59_2 ALARM

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
FAULT INDICATOR SIGNAL + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-39
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

-XM2_L
DC1_XSP_LED_1 6M 6F
B-39.10 /
/B-45.5
Unauthorized duplication prohibited without written consent

13 21 13 21 13 21 11 13 13 11 13 13
-K00 -K00 -K11 -K11 -K21 -K21 IS0685_1 -EDS440_1 -EDS440_2 IS0685_2 -EDS440_3 -EDS440_4
/B-20.3 14 /B-20.3 22 /B-20.5 14 /B-20.5 22 /B-20.8 14 /B-20.8 22 /B-12.3 12 /B-14.3 14 /B-15.3 14 /B-13.3 12 /B-16.3 14 /B-17.3 14

8M
-XM4
/B-45.4
8F

10M 1M 2M 3M 4M 5M 7M 8M
-XM6 -XM7 -XM7
/B-45.6 /B-45.8 /B-45.8
10F 1F 2F 3F 4F 5F 7F 8F

2 3 2 3 2 3

x1 x1

-LD00 -LD11 -LD21 -H64_1 -H64_2


x2 x2

1 1 1

DC1_XSN_LED_1
B-39.10 /

FDC00 STATUS FDC11 STATUS FDC21 STATUS

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
FDC11, FDC21 & FDC00 STATUS + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-40
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

DC1_XSP_SWBP
B-36.5 /

3
SWBP
/B-45.5 4
Unauthorized duplication prohibited without written consent

6F
-XM7
/B-45.8 6M

A1 13 14 /B-27.6
-KBP 23 24 /B-36.3
33 34 /B-37.4
A2
43 44 /B-38.4

DC1_XSN_KBP
B-21.8 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
BYPASS SWITCH + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-41
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XSP_TRIP_FAC
/B-11.3

IO1 A28 A30 -IO1 A25 A27


OUT114 OUT113
/B-23.1 /B-23.1
FAC202 TRIP A29 FAC102 TRIP A26 AC

-XS 31 -WACDC_1 1 XSP_TRIP_FAC102


/=AC/B-53.7

-XS 32 2 XSP_TRIP_FAC202
/=AC/B-53.7

XSN_AC 3 XSN_TRIP_FAC102
Unauthorized duplication prohibited without written consent

B-11.4 / /=AC/B-53.7

=CHARGED1

XSP_CH1 -WDCCH1_3 1 -X10 1


B-11.1 /
CẬP NHẬT TẠI
XSP_CH1_AL -XS 33 2 -X10 2 CÔNG TRƯỜNG
B-28.6 /

XSP_CH1_F -XS 34 3 -X10 3


B-28.7 /

XSP_CH1_1 4 -X34A 5
B-29.2 /

XSP_CH1_2 5 -X34B 5
B-29.3 /

XSP_CH1_3 6 -X34C 5
B-29.4 /

=CHARGED2

XSP_CH2 -WDCCH2_3 1 -X10 1


B-11.1 /

XSP_CH2_AL -XS 35 2 -X10 2 CẬP NHẬT TẠI


B-28.8 /
CÔNG TRƯỜNG
XSP_CH2_F -XS 36 3 -X10 3
B-28.9 /

XSP_CH2_1 4 -X34A 5
B-29.5 /

XSP_CH2_2 5 -X34B 5
B-29.6 /

XSP_CH2_3 6 -X34C 5
B-29.7 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TRIP MCCB CHARGE + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-42
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XSP_FDC1X_T
B-32.2 /

98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96
-FDC101 -FDC102 -FDC103 -FDC104 -FDC105 -FDC106 -FDC107 -FDC108 -FDC109 -FDC110
/B-3.2 95 /B-3.3 95 /B-3.5 95 /B-3.6 95 /B-3.8 95 /B-3.9 95 /B-4.2 95 /B-4.3 95 /B-4.5 95 /B-4.6 95
Unauthorized duplication prohibited without written consent

98 96 98 96 98 96 98 96 98 96 98 96 98 96
-FDC117 -FDC116 -FDC115 -FDC114 -FDC113 -FDC112 -FDC111
/B-5.8 95 /B-5.6 95 /B-5.5 95 /B-5.3 95 /B-5.2 95 /B-4.9 95 /B-4.8 95

-XM2_L
FDC1X_T 7M 7F
B-33.4 /
/B-45.5

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
F1X TRIP + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-43
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

XSP_FDC2X_T
B-33.2 /

98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96 98 96
-FDC201 -FDC202 -FDC203 -FDC204 -FDC205 -FDC206 -FDC207 -FDC208 -FDC209 -FDC210
/B-6.2 95 /B-6.3 95 /B-6.5 95 /B-6.6 95 /B-6.8 95 /B-6.9 95 /B-7.2 95 /B-7.3 95 /B-7.5 95 /B-7.6 95
Unauthorized duplication prohibited without written consent

98 96 98 96 98 96 98 96 98 96 98 96 98 96
-FDC217 -FDC216 -FDC215 -FDC214 -FDC213 -FDC212 -FDC211
/B-8.8 95 /B-8.6 95 /B-8.5 95 /B-8.3 95 /B-8.2 95 /B-7.9 95 /B-7.8 95

XSP_FDC2X_T1
B-33.3 /

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
F2X TRIP + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-44
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

-SWAM SWBP
-PG00 -PG11 -PG21
1 2 1 2
GREEN GREEN GREEN
M A OFF ON

3_1 4_1 3_1 4_1 3_1 4_1 HÀNG KẸP DỰ PHÒNG

CONTACT

CONTACT
NO COM /B-36.6 NO COM /B-37.7 NO COM /B-38.7 POSITION POSITION
NC NC NC
1 2 2 1

1-2 /B-36.4 1-2 /B-41.6


3-4 /B-27.7 3-4
-PR00 -PR11 -PR21
RED RED RED 5-6
7-8

3_1 4_1 3_1 4_1 3_1 4_1

NO COM /B-36.4 NO COM /B-37.5 NO COM /B-38.5


Unauthorized duplication prohibited without written consent

NC NC NC

-XM00 -XM11 -XM21 -XM2_L -XM2_C

1 /B-20.3 1 /B-20.5 1 /B-20.8 1 /B-11.4 1 /B-18.2


2 /B-20.3 2 /B-20.5 2 /B-20.8 2 /B-11.4 2 /B-18.2
3 /B-20.4 3 /B-20.6 3 /B-20.9 3 /B-34.2 3 /B-27.7
4 /B-36.3 4 /B-37.4 4 /B-38.4 4 /B-10.2 4 /B-27.7
5 /B-36.4 5 /B-37.4 5 /B-38.5 5 /B-10.2 5 /B-1.5
6 /B-36.4 6 /B-37.4 6 /B-38.5 6 /B-40.8 6 /B-1.6
7 7 7 7 /B-43.3 7 /B-2.5
8 /B-36.3 8 /B-37.4 8 /B-38.4 8 /B-30.2 8 /B-2.6
9 9 9 9 /B-30.3 9
10 10 10 10 /B-30.4 10

-XM1
-XM3 -XM4 -XM5 -XM6 -XM7 -XM8
1 /B-1.10
1 /B-30.5 1 /B-31.7 1 1 /B-39.2 1 /B-40.2 1 /B-11.8
2 /B-1.10
2 /B-30.6 2 /B-31.8 2 2 /B-39.3 2 /B-40.3 2 /B-11.8
3 /B-1.6
3 /B-30.7 3 /B-31.10 3 3 /B-39.4 3 /B-40.4 3 /B-28.5
4 /B-1.6
4 /B-30.8 4 /B-32.2 4 /B-36.4 4 /B-39.5 4 /B-40.4 4 /B-28.5
5 /B-2.10
5 /B-30.9 5 5 /B-36.6 5 /B-39.6 5 /B-40.5 5
6 /B-2.10
6 /B-31.2 6 6 /B-37.5 6 /B-39.7 6 /B-41.6 6
7 /B-2.6
7 /B-31.3 7 /B-30.1 7 /B-37.7 7 /B-39.8 7 /B-40.6 7
8 /B-2.6
8 /B-31.4 8 /B-40.8 8 /B-38.5 8 /B-39.8 8 /B-40.8 8
9
9 /B-31.5 9 /B-32.3 9 /B-38.7 9 /B-39.9 9 9
10
10 /B-31.6 10 10 /B-39.2 10 /B-40.2 10 10

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
EQUIPMENT DESCRIPTION + RP
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page B-45
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=ELL_E09+RP-WSE09DC_6

=ELL_E02+RP-WSDCE02_6

=ELL_E09+RP-WSE09DC_1

=ELL_E02+RP-WSDCE02_1

=DLL_D04+RP-WSD04DC_6

=DLL_D02+RP-WDCD02_6

=DLL_D04+RP-WSD04DC_1

=DLL_D02+RP-WSDCD02_1
Strip

Cable name

Cable name
=DC+RP-X16_1

2x2.5mm2

2x2.5mm2

2x2.5mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =DC+RP-FDC108 4 =DC+RP/B-4.3
2 =DC+RP-FDC108 2 =DC+RP/B-4.4
Unauthorized duplication prohibited without written consent

1 =DLL_D02+RP-XDC1 1 3 =DC+RP-FDC109 4 =DC+RP/B-4.5


2 =DLL_D02+RP-XDC1 5 4 =DC+RP-FDC109 2 =DC+RP/B-4.5
1 =DLL_D04+RP-XDC1 4 5 =DC+RP-FDC110 4 =DC+RP/B-4.6
2 =DLL_D04+RP-XDC1 8 6 =DC+RP-FDC110 2 =DC+RP/B-4.6
1 =DLL_D02+RP-XDC1 9 7 =DC+RP-FDC111 4 =DC+RP/B-4.8
2 =DLL_D02+RP-XDC1 11 8 =DC+RP-FDC111 2 =DC+RP/B-4.8
1 =DLL_D04+RP-XDC1 10 9 =DC+RP-FDC112 4 =DC+RP/B-4.9
2 =DLL_D04+RP-XDC1 12 10 =DC+RP-FDC112 2 =DC+RP/B-4.9
1 =ELL_E02+RP-XDC1 1 11 =DC+RP-FDC113 4 =DC+RP/B-5.2
2 =ELL_E02+RP-XDC1 5 12 =DC+RP-FDC113 2 =DC+RP/B-5.2
1 =ELL_E09+RP-XDC1 4 13 =DC+RP-FDC114 4 =DC+RP/B-5.3
2 =ELL_E09+RP-XDC1 8 14 =DC+RP-FDC114 2 =DC+RP/B-5.4
1 =ELL_E02+RP-XDC1 9 15 =DC+RP-FDC115 4 =DC+RP/B-5.5
2 =ELL_E02+RP-XDC1 11 16 =DC+RP-FDC115 2 =DC+RP/B-5.5
1 =ELL_E09+RP-XDC1 10 17 =DC+RP-FDC116 4 =DC+RP/B-5.6
2 =ELL_E09+RP-XDC1 12 18 =DC+RP-FDC116 2 =DC+RP/B-5.6
19 =DC+RP-FDC117 4 =DC+RP/B-5.8
20 =DC+RP-FDC117 2 =DC+RP/B-5.8

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 100
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=ELL_E09+RP-WSE09DC_7

=ELL_E02+RP-WSDCE02_7

=ELL_E09+RP-WSE09DC_2

=ELL_E02+RP-WSDCE02_4

=DLL_D04+RP-WSD04DC_7

=DLL_D02+RP-WDCD02_7

=DLL_D04+RP-WSD04DC_2

=DLL_D02+RP-WSDCD02_4
Strip

Cable name

Cable name
=DC+RP-X16_2

2x2.5mm2

2x2.5mm2

2x2.5mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =DC+RP-FDC207 4 =DC+RP/B-7.2
2 =DC+RP-FDC207 2 =DC+RP/B-7.2
Unauthorized duplication prohibited without written consent

3 =DC+RP-FDC208 4 =DC+RP/B-7.3
4 =DC+RP-FDC208 2 =DC+RP/B-7.4
1 =DLL_D02+RP-XDC2 1 5 =DC+RP-FDC209 4 =DC+RP/B-7.5
2 =DLL_D02+RP-XDC2 5 6 =DC+RP-FDC209 2 =DC+RP/B-7.5
1 =DLL_D04+RP-XDC2 4 7 =DC+RP-FDC210 4 =DC+RP/B-7.6
2 =DLL_D04+RP-XDC2 8 8 =DC+RP-FDC210 2 =DC+RP/B-7.6
1 =DLL_D02+RP-XDC2 9 9 =DC+RP-FDC211 4 =DC+RP/B-7.8
2 =DLL_D02+RP-XDC2 11 10 =DC+RP-FDC211 2 =DC+RP/B-7.8
1 =DLL_D04+RP-XDC2 10 11 =DC+RP-FDC212 4 =DC+RP/B-7.9
2 =DLL_D04+RP-XDC2 12 12 =DC+RP-FDC212 2 =DC+RP/B-7.9
1 =ELL_E02+RP-XDC2 1 13 =DC+RP-FDC213 4 =DC+RP/B-8.2
2 =ELL_E02+RP-XDC2 5 14 =DC+RP-FDC213 2 =DC+RP/B-8.2
1 =ELL_E09+RP-XDC2 4 15 =DC+RP-FDC214 4 =DC+RP/B-8.3
2 =ELL_E09+RP-XDC2 8 16 =DC+RP-FDC214 2 =DC+RP/B-8.4
1 =ELL_E02+RP-XDC2 9 17 =DC+RP-FDC215 4 =DC+RP/B-8.5
2 =ELL_E02+RP-XDC2 11 18 =DC+RP-FDC215 2 =DC+RP/B-8.5
1 =ELL_E09+RP-XDC2 10 19 =DC+RP-FDC216 4 =DC+RP/B-8.6
2 =ELL_E09+RP-XDC2 12 20 =DC+RP-FDC216 2 =DC+RP/B-8.6

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 101
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=INV+RP-WDCINV22
Strip

Cable name

Cable name
=DC+RP-X25_2

2x6mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =INV+RP-XDC2 5 1 =DC+RP-FDC206 4 =DC+RP/B-6.9


2 =INV+RP-XDC2 7 2 =DC+RP-FDC206 2 =DC+RP/B-6.9
Unauthorized duplication prohibited without written consent

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 102
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=INV+RP-WDCINV11
Strip

Cable name

Cable name
=DC+RP-X32_1

2x6mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =DC+RP-FDC104 4 =DC+RP/B-3.6
2 =DC+RP-FDC104 2 =DC+RP/B-3.6
Unauthorized duplication prohibited without written consent

3 =DC+RP-FDC105 4 =DC+RP/B-3.8
4 =DC+RP-FDC105 2 =DC+RP/B-3.8
1 =INV+RP-XDC1 1 5 =DC+RP-FDC106 4 =DC+RP/B-3.9
2 =INV+RP-XDC1 3 6 =DC+RP-FDC106 2 =DC+RP/B-3.9

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 103
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=INV+RP-WDCINV12
Strip

Cable name

Cable name
=DC+RP-X32_2

2x6mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

=CH48+RP-XDC 1 1 =DC+RP-FDC204 4 =DC+RP/B-6.6


=CH48+RP-XDC 2 2 =DC+RP-FDC204 2 =DC+RP/B-6.6
Unauthorized duplication prohibited without written consent

1 =INV+RP-XDC2 1 3 =DC+RP-FDC205 4 =DC+RP/B-6.8


2 =INV+RP-XDC2 3 4 =DC+RP-FDC205 2 =DC+RP/B-6.8

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 104
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=DLL_D04+RP-WSDCMK4_1

=DLL_D02+RP-WSDCMK2_1
Strip

Cable name

Cable name
=DC+RP-X50_1

2x4mm2

2x4mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =DLL_D02+MK2-XDC1 1 1 =DC+RP-FDC102 4 =DC+RP/B-3.3


2 =DLL_D02+MK2-XDC1 3 2 =DC+RP-FDC102 2 =DC+RP/B-3.4
Unauthorized duplication prohibited without written consent

1 =DLL_D04+MK4-XDC1 2 3 =DC+RP-FDC103 4 =DC+RP/B-3.5


2 =DLL_D04+MK4-XDC1 4 4 =DC+RP-FDC103 2 =DC+RP/B-3.5

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 105
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=ELL_E09+RP-WSMK09DC_1

=ELL_E02+RP-WSDCMK02_1
Strip

Cable name

Cable name
=DC+RP-X50_2

2x4mm2

2x4mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =ELL_E02+MK-XDC1 1 1 =DC+RP-FDC202 4 =DC+RP/B-6.3


2 =ELL_E02+MK-XDC1 3 2 =DC+RP-FDC202 2 =DC+RP/B-6.4
Unauthorized duplication prohibited without written consent

1 =ELL_E09+MK-XDC1 2 3 =DC+RP-FDC203 4 =DC+RP/B-6.5


2 =ELL_E09+MK-XDC1 4 4 =DC+RP-FDC203 2 =DC+RP/B-6.5

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 106
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram
Strip

Cable name

Cable name
=DC+RP-X63_1

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =DC+RP-FDC101 4 =DC+RP/B-3.2
2 =DC+RP-FDC101 2 =DC+RP/B-3.2
Unauthorized duplication prohibited without written consent

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 107
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram
Strip

Cable name

Cable name
=DC+RP-X63_2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =DC+RP-FDC201 4 =DC+RP/B-6.2
2 =DC+RP-FDC201 2 =DC+RP/B-6.2
Unauthorized duplication prohibited without written consent

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 108
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=DC+RP-WCH1DC_2

=DC+RP-WCH1DC_1
Strip

Cable name

Cable name
=DC+RP-X100_1

1x50

1x50

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =CHARGED1+RP-X6 1 1 =DC+RP-TBP1 1 =DC+RP/B-1.3


1 =CHARGED1+RP-X9 1 2 =DC+RP-TBN1 1 =DC+RP/B-1.3
Unauthorized duplication prohibited without written consent

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 109
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=DC+RP-WCH2DC_2

=DC+RP-WCH2DC_1
Strip

Cable name

Cable name
=DC+RP-X100_2

1x50

1x50

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =CHARGED2+RP-X6 1 1 =DC+RP-TBP2 1 =DC+RP/B-2.3


1 =CHARGED2+RP-X9 1 2 =DC+RP-TBN2 1 =DC+RP/B-2.3
Unauthorized duplication prohibited without written consent

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 110
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=INV+RP-WSACDCINV_1

=DC+RP-WACDC_2
Strip

Cable name

Cable name
=DC+RP-XAC

2x2.5mm2

2x2.5mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =AC+RP-XAC 2 1 =DC+RP-FAC 1 =DC+RP/B-11.9


1 =INV+RP-XAC 1 2 =DC+RP/B-11.10
Unauthorized duplication prohibited without written consent

2 =AC+RP-XAC 7 3 =DC+RP-FAC 3 =DC+RP/B-11.9


2 =INV+RP-XAC 3 4 =DC+RP/B-11.10

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 111
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=AC+RP-WSDCAC_1
Strip

Cable name

Cable name
=DC+RP-XDC

2x2.5mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =AC+RP-XDC 1 1 =DC+RP-FDC 4 =DC+RP/B-9.5


2 =DC+RP-FR1 3 =DC+RP/B-9.6
Unauthorized duplication prohibited without written consent

3 =DC+RP-U1 =DC+RP/B-9.7
4 =DC+RP/B-9.7
5 =DC+RP/B-9.7
6 =DC+RP/B-9.7
7 =DC+RP/B-9.8
8 =DC+RP/B-9.8
9 =DC+RP/B-9.8
10 =DC+RP/B-9.8
2 =AC+RP-XDC 3 11 =DC+RP-FDC 2 =DC+RP/B-9.5
12 =DC+RP-FR1 1 =DC+RP/B-9.6
13 =DC+RP-U1 =DC+RP/B-9.7
14 =DC+RP/B-9.7
15 =DC+RP/B-9.7
16 =DC+RP/B-9.7
17 =DC+RP/B-9.8
18 =DC+RP/B-9.8
19 =DC+RP/B-9.8
20 =DC+RP/B-9.8

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 112
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=INV+RP-WDCINV21
Strip

Cable name

Cable name
=DC+RP-XINV_1

2x6mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =INV+RP-XDC1 5 1 =DC+RP-FDC107 4 =DC+RP/B-4.2


2 =INV+RP-XDC1 7 2 =DC+RP-FDC107 2 =DC+RP/B-4.2
Unauthorized duplication prohibited without written consent

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 113
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=DC+RP-WDCCH2_3

=DC+RP-WDCCH1_3

=DC+RP-WACDC_1

=DC+RP-WDCCH1_3

=DC+RP-WDCCH2_3

=AC+RP-WACDC_1

=DC+RP-WACDC_1
Strip

Cable name

Cable name
=DC+RP-XS

7x1.5mm2

7x1.5mm2

7x1.5mm2

7x1.5mm2

7x1.5mm2

7x1.5mm2

7x1.5mm2
Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

=DC+RP-FS 4 1 =CHARGED1+RP-X10 1 1 =DC+RP/B-11.2


=DC+RP-F27_1 12 2 =CHARGED2+RP-X10 1 1 =DC+RP/B-11.2
Unauthorized duplication prohibited without written consent

=DC+RP-K00 43 3 =AC+RP-XS 55 1 =DC+RP/B-11.2


=DC+RP-KBP 13 4 =DC+RP/B-11.2
=DC+RP-XM2_C 1M 5 =DC+RP/B-11.2
=DC+RP-LS1 13 6 =DC+RP/B-11.2
=DC+RP-XM00 1M 7 =DC+RP/B-11.2
=DC+RP-XM11 1M 8 =DC+RP/B-11.2
=DC+RP-XM21 1M 9 =DC+RP/B-11.2
=DC+RP-IO1 A07 10 =DC+RP/B-11.2
=DC+RP-XM2_C 3M 11 =DC+RP/B-11.2
=DC+RP-IO1 A27 12 =DC+RP/B-11.2
=DC+RP-FDC101 12 13 =DC+RP/B-11.2
=DC+RP-XM2_L 3M 14 =DC+RP/B-11.2
=DC+RP-XM00 6M 15 =DC+RP/B-11.2
16 =DC+RP/B-11.2
17 =DC+RP/B-11.2
18 =DC+RP/B-11.2
19 =DC+RP/B-11.2
20 =DC+RP/B-11.2
=DC+RP-FS 2 21 =AC+RP-XS 52 3 =DC+RP/B-11.5
=DC+RP-XM5 10M 22 =DC+RP/B-11.5
=DC+RP-K00 A2 23 =DC+RP/B-11.5
24 =DC+RP/B-11.5
=DC+RP-XM2_C 2M 25 =DC+RP/B-11.5
=DC+RP-IO1 B02 26 =DC+RP/B-11.5
=DC+RP-XM4 7M 27 =DC+RP/B-11.5
28 =DC+RP/B-11.5
29 =DC+RP/B-11.5
30 =DC+RP/B-11.5
1 =AC+RP-XS 53 31 =DC+RP-IO1 A26 =DC+RP/B-42.5
2 =AC+RP-XS 54 32 =DC+RP-IO1 A29 =DC+RP/B-42.5
2 =CHARGED1+RP-X10 2 33 =DC+RP-IO1 C09 =DC+RP/B-42.6
3 =CHARGED1+RP-X10 3 34 =DC+RP-IO1 C11 =DC+RP/B-42.6
2 =CHARGED2+RP-X10 2 35 =DC+RP-IO1 C13 =DC+RP/B-42.6

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 114
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=DC+RP-WDCCH2_3

=AC+RP-WACDC_1

=DC+RP-WDCCH1_3

=DC+RP-WDCCH2_3
Strip

Cable name

Cable name
=DC+RP-XS

7x1.5mm2

7x1.5mm2

7x1.5mm2

7x1.5mm2
Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

3 =CHARGED2+RP-X10 3 36 =DC+RP-IO1 C15 =DC+RP/B-42.6


=DC+RP-FDC1 12 37 =AC+RP-XS 7 3 =DC+RP/B-10.2
Unauthorized duplication prohibited without written consent

=DC+RP-FDC1 11 38 =AC+RP-XS 57 4 =DC+RP/B-10.2


=DC+RP-XM4 9M 39 =AC+RP-XS 56 2 =DC+RP/B-32.3
=DC+RP-IO1 C17 40 =CHARGED1+RP-X34A 5 4 =DC+RP/B-29.2
=DC+RP-IO1 C19 41 =CHARGED1+RP-X34B 5 5 =DC+RP/B-29.3
=DC+RP-IO1 C21 42 =CHARGED1+RP-X34C 5 6 =DC+RP/B-29.4
=DC+RP-IO1 C23 43 =CHARGED2+RP-X34A 5 4 =DC+RP/B-29.5
=DC+RP-IO1 C25 44 =CHARGED2+RP-X34B 5 5 =DC+RP/B-29.6
=DC+RP-IO1 C27 45 =CHARGED2+RP-X34C 5 6 =DC+RP/B-29.7

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 115
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20

Terminal diagram

=M1+RP-WSDCM1
Strip

Cable name

Cable name
=DC+RP-X16_2

2x2.5mm2

Connection

Connection
Cable type

Cable type
Terminal

Jumper
point

point
Function text Target designation Target designation Page / column

1 =M1+RP-XDC 1 21 =DC+RP-FDC217 4 =DC+RP/B-8.8


2 =M1+RP-XDC 2 22 =DC+RP-FDC217 2 =DC+RP/B-8.8
Unauthorized duplication prohibited without written consent

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
TERMINAL DIAGRAM + TP1
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 116
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
Cable diagram
=DC+RP-WACDC_1 CAB7x1.5
Page / column Target designation from Conductor Target designation to Page / column

=AC+RP/B-53.5 =AC+RP-XS:53 1 =DC+RP-XS:31 =DC+RP/B-42.5

=AC+RP/B-53.5 =AC+RP-XS:54 2 =DC+RP-XS:32 =DC+RP/B-42.5

=AC+RP/B-53.5 =AC+RP-XS:52 3 =DC+RP-XS:21 =DC+RP/B-11.5

4
5
6
7
=DC+RP-WACDC_2 CAB2x2.5
Unauthorized duplication prohibited without written consent

Page / column Target designation from Conductor Target designation to Page / column

=AC+RP/B-12.6 =AC+RP-XAC:2 1 =DC+RP-XAC:1 =DC+RP/B-11.9

=AC+RP/B-12.6 =AC+RP-XAC:7 2 =DC+RP-XAC:3 =DC+RP/B-11.9

=DC+RP-WCH1DC_1 CAB1x50
Page / column Target designation from Conductor Target designation to Page / column

=DC+RP/B-1.1 =CHARGED1+RP-X6:1 1 =DC+RP-X100_1:1 =DC+RP/B-1.3

=DC+RP-WCH1DC_2 CAB1x50
Page / column Target designation from Conductor Target designation to Page / column

=DC+RP/B-1.1 =CHARGED1+RP-X9:1 1 =DC+RP-X100_1:2 =DC+RP/B-1.3

=DC+RP-WCH2DC_1 CAB1x50
Page / column Target designation from Conductor Target designation to Page / column

=DC+RP/B-2.1 =CHARGED2+RP-X6:1 1 =DC+RP-X100_2:1 =DC+RP/B-2.3

=DC+RP-WCH2DC_2 CAB1x50
Page / column Target designation from Conductor Target designation to Page / column

=DC+RP/B-2.1 =CHARGED2+RP-X9:1 1 =DC+RP-X100_2:2 =DC+RP/B-2.3

=DC+RP-WDCCH1_3 CAB7x1.5
Page / column Target designation from Conductor Target designation to Page / column

=DC+RP/B-42.7 =CHARGED1+RP-X10:1 1 =DC+RP-XS:1 =DC+RP/B-11.2

=DC+RP/B-42.7 =CHARGED1+RP-X10:2 2 =DC+RP-XS:33 =DC+RP/B-42.6

=DC+RP/B-42.7 =CHARGED1+RP-X10:3 3 =DC+RP-XS:34 =DC+RP/B-42.6

=DC+RP/B-42.7 =CHARGED1+RP-X34A:5 4 =DC+RP-XS:40 =DC+RP/B-29.2

=DC+RP/B-42.7 =CHARGED1+RP-X34B:5 5 =DC+RP-XS:41 =DC+RP/B-29.3

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CABLE DIAGRAM + CAB
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 300
Leading Integration
PECC4-20-09 CSE_ DC
DATE STAMP 1 2 3 4 5 6 7 8 9 10

25-MAY-20
Cable diagram
=DC+RP-WDCCH1_3 CAB7x1.5
Page / column Target designation from Conductor Target designation to Page / column

=DC+RP/B-42.7 =CHARGED1+RP-X34C:5 6 =DC+RP-XS:42 =DC+RP/B-29.4

7
=DC+RP-WDCCH2_3 CAB7x1.5
Page / column Target designation from Conductor Target designation to Page / column

=DC+RP/B-42.7 =CHARGED2+RP-X10:1 1 =DC+RP-XS:2 =DC+RP/B-11.2

=DC+RP/B-42.7 =CHARGED2+RP-X10:2 2 =DC+RP-XS:35 =DC+RP/B-42.6

=DC+RP/B-42.7 =CHARGED2+RP-X10:3 3 =DC+RP-XS:36 =DC+RP/B-42.6

=DC+RP/B-42.7 =CHARGED2+RP-X34A:5 4 =DC+RP-XS:43 =DC+RP/B-29.5

5
Unauthorized duplication prohibited without written consent

=DC+RP/B-42.7 =CHARGED2+RP-X34B:5 =DC+RP-XS:44 =DC+RP/B-29.6

=DC+RP/B-42.7 =CHARGED2+RP-X34C:5 6 =DC+RP-XS:45 =DC+RP/B-29.7

REV REVISION DESCRIPTION DRAWN DATE DRAWN BY CHECKED DATE CHECKED BY Project = DC
A1 BASIC DESIGN 15.04.2020 VIET.V.H 29.04.2020 ANH.N.T 220KV CHU SE SUBSTATION
B2 FOR APPROVAL 28.07.2020 VIET.V.H 03.08.2020 HIEU.P.V
CABLE DIAGRAM + CAB
C1 FACRTORY 28.09.2020 VIET.V.H 30.09.2020 HIEU.P.V Job No. Drawing No. Page 301
Leading Integration
PECC4-20-09 CSE_ DC

You might also like