You are on page 1of 1

CRADLE INSPECTION CHECKLIST

PROJECT:

DATE: LOCATION:
CRADLE MOTO NO: MANUFACTURER:
LOCAL ID:

SUPPORTED BY: MONORAIL GIRAFFE BRACKET SUPPORTED AT FLOOR

SN INSPECTION ITEM CODITION REMARKS

1 SAFETY BRAKE
2 EMERGENCY LOWERING
3 EMERGENCY SWITCH
4 WIRE ROPES
5 D-SHACKLES, HOOKS, CLAMPS
6 WIRE ROPE COUNTER WEIGHTS
7 MOTOR GEAR BOX
8 CAGE CONDITION
9 OVERHEAD PROTECTION
10 ELECTRIC CABLES
11 HOUSEKEEPING
12 CRADLE SUPPORTS (MONORAIL/GIRAFFE/BRACKET)
13 TROLLEY CONDITION (IN CASE OF MONORAIL)
14 AREA BARRICADING AND SIGNAGE
Note:
The inspection shall be done daily before work resumption by the concerned supervisor/chargehand and send to Safety Officer.

INSPECTED BY

NAME SIGNATURE / DATE

QA-AMG-FORM-019-2021

You might also like