BILL NO.

3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

DOORS AND WINDOWS

DOORS

Timber Door

Solid timber door; with glazed side lights and elliptical top lights;
glazed with 13.52mm thick Low E tempered laminated safety
glass; including headed lights; frames, architraves, transoms,
hardware and accessories; spray paint finished; complete in all
respects to details as shown in approved shop drawings and all in
accordance with the design intent shown in Architect's drawing no.
AD-SL-DWG-L0-702, AD-SL-DWG-L0-702.02 to
AD-SL-DWG-L0-702.04 and AD-SL-DWG-TYP-714
(Ironmongery measured separately)

A composite door; comprising single panelled and moulded door nr 29,760.00 1 29,760.00 1 29,760.00 1 29,760.00
leaf; with fixed timber side panel and glazed lights to both
sides; and top fixed elliptical top lights; size 3459mm x
3400mm height overall
(Type D01)

To DOORS Collection : 29,760.00 29,760.00 29,760.00

DOORS AND WINDOWS

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 1


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
DOORS (Cont'd)

Timber Door (Cont'd)

Solid timber door; with glazed side lights and top lights; glazed
with 13.52mm thick Low E tempered laminated safety glass;
including frames, architraves, transoms, hardware and
accessories; spray paint finish; complete in all respects to details
as shown in approved shop drawings and all in accordance with
the design intent shown in Architect's drawing no.
AD-SL-DWG-L0-702 and AD-SL-DWG-L0-702.05
(Ironmongery measured separately)

A composite door; comprising single openable panelled and nr 14,160.00 2 28,320.00


moulded door leaf; with fixed timber side panel and glazed
lights to both sides; and fixed top lights; size 2200mm x
2550mm height overall
(Type D02)

To DOORS Collection : 28,320.00

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Aluminium Door

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 2


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

Doors; powder coated aluminium glazed door "Trend Thermal" or


approved equivalent; customised system; overall 1.5mm to 2.0mm
thick aluminium frame; white colour; complete with subframe;
including hard rubber padding, hinges, resistant arm, weather
strip, gasket, roller, multi locking ironmongery and all necessary
fixing accessories; complete in all respects to details as shown in
approved shop drawings and fixing in accordance with
manufactures's instruction and Architect's drawing no.
AD-SL-DWG-L0-701 to AD-SL-DWG-L0-702 and
AD-SL-DWG-TYP-714 (glazing measured separately)

A Swing door; overall size 1500mm x 3150mm high (Type D03) nr 19,320.00 4 77,280.00

B Folding door; overall size 8000mm x 3400mm high (Type D04) nr 109,200.00 1 109,200.00

C Swing door; overall size 2448mm x 3400mm high (Type D05) nr 33,360.00 1 33,360.00

D Swing door; overall size 1100mm x 2550mm high ( Type D07) nr 11,520.00 2 23,040.00

To DOORS Collection : 242,880.00

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Doors; powder coated aluminium glazed door "Trend Thermal" or


approved equivalent; customised system; overall 1.5mm to 2.0mm
thick aluminium frame; white colour; complete with subframe;

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 3


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
including hard rubber padding, hinges, resistant arm, weather
strip, gasket, roller, multi locking ironmongery and all necessary
fixing accessories; complete in all respects to details as shown in
approved shop drawings and fixing in accordance with
manufacturer's instruction and Architect's drawing no.
AD-SL-DWG-L0-701 to AD-SL-DWG-L0-702 and
AD-SL-DWG-TYP-714 (glazing measured separately)

A Swing door; overall size 1500mm x 2650mm high (Type D08) nr 15,960.00 6 95,760.00 4 63,840.00 4 63,840.00

B Folding door; overall size 4300mm x 3250mm high (Type D09) nr 56,040.00 1 56,040.00 1 56,040.00

To DOORS Collection : 95,760.00 119,880.00 119,880.00

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Doors; powder coated aluminium glazed door "Trend Thermal" or


approved equivalent; customised system; overall 1.5mm to 2.0mm
thick aluminium frame; white colour; complete with subframe;
including hard rubber padding, hinges, resistant arm, weather
strip, gasket, roller, multi locking ironmongery and all necessary
fixing accessories; complete in all respects to details as shown in

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 4


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
approved shop drawings and fixing in accordance witth
manufacturer's instruction Architect's drawing no.
AD-SL-DWG-L0-701 to AD-SL-DWG-L0-702 and
AD-SL-DWG-TYP-714 (door leaf and glazing measured
separately)

A Swing door; overall size 1000mm x 2450mm high (Type D10) nr 4,920.00 2 9,840.00 2 9,840.00

To DOORS Collection : 9,840.00 9,840.00

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Automated operated garage doors; proprietary system; timber


finish metal door; over and up sliding system; including frame and
door leaf, hardware and fixing accessories; painted; complete
installation as per approved shop drawings and Architect's drawing
no. AD-SL-DWG-L0-701 and AD-SL-DWG-L0-702.01

A overall size 15663mm x 2500mm high (Type D06) nr 187,920.00 1 187,920.00

B overall size 8601mm x 2354mm high (Type D11) nr 97,080.00 1 97,080.00 1 97,080.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 5


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

Solid core hardwood door; to Architect's selection; complete with


frame, accessories, ironmongery and painted

C Door; single leaf overall size 1000mm x 2450mm high nr 6,120.00 2 12,240.00 2 12,240.00
(Type D10)

Low E clear tempered with aluminium glazing beads laminated


safety glass; glazing to doors

D 13.52mm thick m² 339.60 70 23,772.00 26 8,829.60 26 8,829.60

To DOORS Collection : 211,692.00 118,149.60 118,149.60

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00

A Polished brass milton euro door handle (pair) nr 1,390.85 3 4,172.55 1 1,390.85 1 1,390.85

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 961.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 150.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 6


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
g. Wastage ( % ) 48.05
h. Others (…………………..)
subtotal 1,159.05 0.00 0.00 0.00
i. Overhead & profit ( %) 231.80
Rate (RM) 1,390.85

To DOORS Collection : 4,172.55 1,390.85 1,390.85

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A Polished brass milton dummy door handle (left only) nr 844.05 1 844.05 1 844.05 1 844.05

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 527.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 150.00
g. Wastage ( % ) 26.35 0.00 0.00 0.00
h. Others (…………………..)

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 7


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
subtotal 703.35
i. Overhead & profit ( %) 140.70
Rate (RM) 844.05

To DOORS Collection : 9,189.15 3,625.75 3,625.75

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A Polished brass milton dummy door handle (right only) nr 844.05 1 844.05 1 844.05 1 844.05

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 527.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 150.00
g. Wastage ( % ) 26.35 0.00 0.00 0.00
h. Others (…………………..)
subtotal 703.35
i. Overhead & profit ( % ) 140.70
Rate (RM) 844.05

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 8


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

To DOORS Collection : 844.05 844.05 844.05

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A 57mm backset rebated euro lock nr 1,341.70 1 1,341.70 1 1,341.70 1 1,341.70

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 922.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 150.00
g. Wastage ( % ) 46.10 0.00 0.00 0.00
h. Others (…………………..)
subtotal 1,118.10
i. Overhead & profit ( % ) 223.60
Rate (RM) 1,341.70

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 9


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

To DOORS Collection : 1,341.70 1,341.70 1,341.70

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A Euro cylinder 100mm - key on both sides nr 717.20 3 2,151.60 1 717.20 1 717.20

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 474.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 100.00
g. Wastage ( % ) 23.70 0.00 0.00 0.00
h. Others (…………………..)
subtotal 597.70
i. Overhead & profit ( % ) 119.50
Rate (RM) 717.20

To DOORS Collection : 2,151.60 717.20 717.20

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 10


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A Brass flush bolt - 150mm x 19mm nr 402.10 2 804.20 2 804.20 2 804.20

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 262.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 60.00
g. Wastage ( % ) 13.10 0.00 0.00 0.00
h. Others (…………………..)
subtotal 335.10
i. Overhead & profit ( % ) 67.00
Rate (RM) 402.10

To DOORS Collection : 804.20 804.20 804.20

DOORS AND WINDOWS (Cont'd)

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 11


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A Brass butt hinge - board - 100mm x 125mm nr 538.20 18 9,687.60 6 3,229.20 6 3,229.20

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 370.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 60.00
g. Wastage ( % ) 18.50 0.00 0.00 0.00
h. Others (…………………..)
subtotal 448.50
i. Overhead & profit ( % ) 89.70
Rate (RM) 538.20

To DOORS Collection : 9,687.60 3,229.20 3,229.20

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 12


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
(Cont'd)

A Brass floor mounted door stop - 29mm nr 208.65 6 1,251.90 2 417.30 2 417.30

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 137.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 30.00
g. Wastage ( % ) 6.85 0.00 0.00 0.00
h. Others (…………………..)
subtotal 173.85
i. Overhead & profit ( % ) 34.80
Rate (RM) 208.65

To DOORS Collection : 1,251.90 417.30 417.30

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A Euro lock with 57mm backset in polished brass nr 1,126.25 2 2,252.50

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 13


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang) 751.00
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 150.00
g. Wastage ( % ) 37.55 0.00 0.00 0.00
h. Others (…………………..)
subtotal 938.55
i. Overhead & profit ( % ) 187.70
Rate (RM) 1,126.25 0.00 0.00 0.00

To DOORS Collection : 2,252.50

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

Precast concrete grade 20; including all moulds and 4 nos of T10 0.00 0.00 0.00
or T12 main reinforcement and R6 links at 100mm centres; finished
fair on exposed surfaces, including hoisting, fixing, bedding and
setting in cement and sand (1:3) mortar:- 0.00 0.00 0.00

A lintels; 230mm x 150mm m 57.60 22 1,267.20 4 230.40 3 172.80


0.00 0.00 0.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 14


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
B lintels; 230mm x 230mm m 87.60 10 876.00 5 438.00 5 438.00

C lintels; 230mm x 300mm m 115.20 29 3,340.80 14 1,612.80 14 1,612.80

To DOORS Collection : 5,484.00 2,281.20 2,223.60

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

COLLECTION PAGE

BQ 3, 4 & 5 / DW / 1 29,760.00 29,760.00 29,760.00

BQ 3, 4 & 5 / DW / 2 28,320.00

BQ 3, 4 & 5 / DW / 3 242,880.00

BQ 3, 4 & 5 / DW / 4 95,760.00 119,880.00 119,880.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 15


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
BQ 3, 4 & 5 / DW / 5 9,840.00 9,840.00

ADJ 1 / BQ 3, 4 & 5 / DW / 6 211,692.00 118,149.60 118,149.60

BQ 3, 4 & 5 / DW / 7 4,172.55 1,390.85 1,390.85

BQ 3, 4 & 5 / DW / 8 9,189.15 3,625.75 3,625.75

0.00 0.00 0.00

To DOORS Collection Summary : 621,773.70 282,646.20 282,646.20

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

COLLECTION PAGE

BQ 3, 4 & 5 / DW / 9 844.05 844.05 844.05

BQ 3, 4 & 5 / DW / 10 1,341.70 1,341.70 1,341.70

BQ 3, 4 & 5 / DW / 11 2,151.60 717.20 717.20

BQ 3, 4 & 5 / DW / 12 804.20 804.20 804.20

BQ 3, 4 & 5 / DW / 13 9,687.60 3,229.20 3,229.20

BQ 3, 4 & 5 / DW / 14 1,251.90 417.30 417.30

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 16


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

BQ 3, 4 & 5 / DW / 15 2,252.50

BQ 3, 4 & 5 / DW / 16 5,484.00 2,281.20 2,223.60

0.00 0.00 0.00

To DOORS Collection Summary : 23,817.55 9,634.85 9,577.25

DOORS AND WINDOWS (Cont'd)

DOORS (Cont'd)

COLLECTION PAGE SUMMARY

ADJ 1 / BQ 3, 4 & 5 / DW / 17 621,773.70 282,646.20 282,646.20

BQ 3, 4 & 5 / DW / 18 23,817.55 9,634.85 9,577.25

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 17


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

0.00 0.00 0.00

To DOORS AND WINDOWS Main Collection : 645,591.25 292,281.05 292,223.45

DOORS AND WINDOWS (Cont'd)

WINDOWS

Windows; powder coated aluminium; "Trend Thermal" or


approved equivalent; Architect's customised profile; overall
1.5mm to 2.0mm thick aluminium frame; white colour; complete
with subframe; including hard rubber padding, hinges, resistant
arm, weather strip, gasket, roller, multi locking ironmongery and
all necessary fixing accessories; complete in all respects to details
as per approved shop drawings and in accordance with
Architect's drawing no. AD-SL-DWG-L0-700,
AD-SL-DWG-TYP-710 to AD-SL-DWG-TYP-712

A Composite unit; overall size 1500mm x 2150mm high (Type W01) nr 8,880.00 16 142,080.00

B Composite unit; overall size 1500mm x 3100mm high (Type W02) nr 18,480.00 8 147,840.00

C Fixed unit; overall size 3517mm x 2760mm high (Type W03) nr 12,480.00 2 24,960.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 18


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

To WINDOWS Collection : 314,880.00

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

Windows; powder coated aluminium; "Trend Thermal" or


approved equivalent; Architect's customised profile; overall
1.5mm to 2.0mm thick aluminium frame; white colour; complete
with subframe; including hard rubber padding, hinges, resistant
arm, weather strip, gasket, roller, multi locking ironmongery and
all necessary fixing accessories; complete in all respects to details
as per approved shop drawings and in accordance with
Architect's drawing no. AD-SL-DWG-L0-700,
AD-SL-DWG-TYP-710 to AD-SL-DWG-TYP-712 (Cont'd)

A Fixed unit; overall size 3300mm x 2760mm high (Type W04) nr 11,640.00 2 23,280.00

B Fixed unit; overall size 1224mm x 2887mm high (Type W05) nr 4,440.00 2 8,880.00

C Composite unit; overall size 1100mm x 1200mm high (Type W06) nr 3,840.00 4 15,360.00 3 11,520.00 3 11,520.00

D Composite unit; overall size 1500mm x 1800mm high ( Type W07) nr 7,320.00 16 117,120.00 3 21,960.00 3 21,960.00

E Composite unit; overall size 1500mm x 2650mm high (Type W08) nr 15,960.00 11 175,560.00 8 127,680.00 8 127,680.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 19


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
To WINDOWS Collection : 340,200.00 161,160.00 161,160.00

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

Windows; powder coated aluminium; "Trend Thermal" or


approved equivalent; Architect's customised profile; overall
1.5mm to 2.0mm thick aluminium frame; white colour; complete
with subframe; including hard rubber padding, hinges, resistant
arm, weather strip, gasket, roller, multi locking ironmongery and
all necessary fixing accessories; complete in all respects to details
as per approved shop drawings and in accordance with
Architect's drawing no. AD-SL-DWG-L0-700,
AD-SL-DWG-TYP-710 to AD-SL-DWG-TYP-712 (Cont'd)

A Fixed unit; overall size 4240mm x 2650mm high (Type W09) nr 17,880.00 2 35,760.00 3 53,640.00 3 53,640.00

B Composite unit; overall size 1500mm x 3100mm high (Type W10) nr 18,480.00 7 129,360.00 7 129,360.00

C Composite unit; overall size 2100mm x 1500mm high (Type W11) nr 8,640.00 1 8,640.00 1 8,640.00

D Side hung; overall size 600mm x 1500mm high (Type W12) nr 3,120.00 2 6,240.00 2 6,240.00

E Composite unit; overall size 1100mm x 1800mm high (Type W15) nr 5,640.00 2 11,280.00

To WINDOWS Collection : 47,040.00 197,880.00 197,880.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 20


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

Windows; timber frame; Architect's customised profile; complete


with subframe; including painting, hard rubber padding, hinges,
resistant arm, weather strip, gasket, roller, multi locking
ironmongery and all necessary fixing accessories; complete in all
respects to details as per approved shop drawings and in
accordance with Architect's drawing no. AD-SL-DWG-L0-700,
AD-SL-DWG-TYP-710 to AD-SL-DWG-TYP-712

A Composite unit; overall size 1500mm x 2150mm high (Type W01) nr


(rate only)

B Composite unit; overall size 1500mm x 3100mm high (Type W02) nr


(rate only)

C Fixed unit; overall size 3517mm x 2760mm high (Type W03) nr


(rate only)

D Fixed unit; overall size 3300mm x 2760mm high (Type W04) nr


(rate only)

To WINDOWS Collection :

DOORS AND WINDOWS (Cont'd)

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 21


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
WINDOWS (Cont'd)

Windows; timber frame; Architect's customised profile; complete


with subframe; including painting, hard rubber padding, hinges,
resistant arm, weather strip, gasket, roller, multi locking
ironmongery and all necessary fixing accessories; complete in all
respects to details as per approved shop drawings and in
accordance with Architect's drawing no. AD-SL-DWG-L0-700,
AD-SL-DWG-TYP-710 to AD-SL-DWG-TYP-712 (Cont'd)

A Fixed unit; overall size 1224mm x 2887mm high (Type W05) nr


(rate only)

B Composite unit; overall size 1100mm x 1200mm high (Type W06) nr


(rate only)

C Composite unit; overall size 1500mm x 1800mm high ( Type W07) nr


(rate only)

D Composite unit; overall size 1500mm x 2650mm high (Type W08) nr


(rate only)

To WINDOWS Collection :

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

Windows; timber frame; Architect's customised profile; complete


with subframe; including painting, hard rubber padding, hinges,

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 22


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
resistant arm, weather strip, gasket, roller, multi locking
ironmongery and all necessary fixing accessories; complete in all
respects to details as per approved shop drawings and in
accordance with Architect's drawing no. AD-SL-DWG-L0-700,
AD-SL-DWG-TYP-710 to AD-SL-DWG-TYP-712 (Cont'd)

A Fixed unit; overall size 4240mm x 2650mm high (Type W09) nr


(rate only)

B Composite unit; overall size 1500mm x 3100mm high (Type W10) nr


(rate only)

C Composite unit; overall size 2100mm x 1500mm high (Type W11) nr


(rate only)

D Side hung; overall size 600mm x 1500mm high (Type W12) nr


(rate only)

E Composite unit; overall size 1100mm x 1800mm high (Type W15) nr


(rate only)

To WINDOWS Collection :

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

A Provide sample of powder coated aluminium window; size 600mm x item 1


600mm high; aluminium frame including glazing; all as per
Architect's customised profile submit together with this tender
submission

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 23


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

B Provide sample of timber window; size 600mm x 600mm high; item 1


including glazing; all as per Architect's customised profile submit
together with this tender submission

To WINDOWS Collection : 0.00

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00

A Locking window wtays - brass sill mount telescopic stay - nr


200-295mm (rate only)

Description Amount (RM) 0.00 0.00 0.00

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 24


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
Breakdown of rate per nr.
a. Supply rate (CIF Port Klang)
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 150.00
g. Wastage ( % ) 0.00 0.00 0.00 0.00
h. Others (…………………..)
subtotal 150.00
i. Overhead & profit ( % ) 30.00
Rate (RM) 180.00 0.00 0.00 0.00

To WINDOWS Collection :

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A Window lock - polished brass right hand (rate only) nr

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang)
b. Port clearance and custom duty

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 25


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
c. Excise tax
d. Delivery to project site
e. Unloading
f. Labour & tools for fixing 150.00
g. Wastage ( % ) 0.00 0.00 0.00 0.00
h. Others (…………………..)
subtotal 150.00
i. Overhead & profit ( %) 30.00
Rate (RM) 180.00 0.00 0.00 0.00

To WINDOWS Collection :

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

Supply and fix ironmongery "Restoration Online" as followed :- 0.00 0.00 0.00
(Cont'd)

A Window lock - polished brass left hand (rate only) nr

Description Amount (RM) 0.00 0.00 0.00


Breakdown of rate per nr.
a. Supply rate (CIF Port Klang)
b. Port clearance and custom duty
c. Excise tax
d. Delivery to project site
e. Unloading

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 26


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
f. Labour & tools for fixing 150.00
g. Wastage ( % ) 0.00 0.00 0.00 0.00
h. Others (…………………..)
subtotal 150.00
i. Overhead & profit ( %) 30.00
Rate (RM) 180.00 0.00 0.00 0.00

To WINDOWS Collection :

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

Low E clear tempered with aluminium glazing beads laminated


safety glass; glazing to windows

A 13.52mm thick m² 339.60 252 85,579.20 115 39,054.00 115 39,054.00

Precast concrete grade 20; including all moulds and 4 nos of T10 0.00 0.00 0.00
or T12 main reinforcement and R6 links at 100mm centres;
finished fair on exposed surfaces, including hoisting, fixing,
bedding and setting in cement and sand (1:3) mortar:- 0.00 0.00 0.00

B lintels; 230mm x 150mm m 57.60 2 115.20 2 115.20


0.00 0.00 0.00
C lintels; 230mm x 230mm m 87.60 103 9,022.80 37 3,241.20 37 3,241.20

D lintels; 230mm x 300mm m 115.20 24 2,764.80 16 1,843.20 16 1,843.20

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 27


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

To WINDOWS Collection : 97,366.80 44,253.60 44,253.60

DOORS AND WINDOWS (Cont'd)

WINDOWS (Cont'd)

COLLECTION PAGE

BQ 3, 4 & 5 / DW / 20 314,880.00

BQ 3, 4 & 5 / DW / 21 340,200.00 161,160.00 161,160.00

BQ 3, 4 & 5 / DW / 22 47,040.00 197,880.00 197,880.00

BQ 3, 4 & 5 / DW / 23

BQ 3, 4 & 5 / DW / 24

BQ 3, 4 & 5 / DW / 25

BQ 3, 4 & 5 / DW / 26 0.00

BQ 3, 4 & 5 / DW / 27

BQ 3, 4 & 5 / DW / 28

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 28


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)
BQ 3, 4 & 5 / DW / 29

BQ 3, 4 & 5 / DW / 30 97,366.80 44,253.60 44,253.60


0.00 0.00 0.00

To DOORS AND WINDOWS Main Collection : 799,486.80 403,293.60 403,293.60

WALLS (Cont'd)

COLLECTION PAGE

Doors ADJ 1 / BQ 3, 4 & 5 / DW / 19 645,591.25 292,281.05 292,223.45

Windows BQ 3, 4 & 5 / DW / 31 799,486.80 403,293.60 403,293.60

QSPC59-19/P2/MBW ADJ 1/BQ 3, 4 & 5 / DW / 29


BILL NO. 3, 4 & 5 - MAIN BUILDING WORKS

Bill No.3: Building Works Lot 1 Bill No.4: Building Works Lot 2 Bill No.5: Building Works Lot 3
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT QTY AMOUNT QTY AMOUNT
(RM)
(RM) (RM) (RM)

To BILL NO. 3, 4 & 5 SUMMARY : 1,445,078.05 695,574.65 695,517.05