Road Roller
Capability: = 192.00 cu.m./day
49.00 cu.m.
no. of day/s = = 0.2552 say 1.00 day/s
192.00 cu.m./day
Hacksaw Blade:
Provide 5 pcs. Hacksaw Blade
Coco Lumber forms, 2" x 6" x 10' : 35.00
Use 2 times : 35.00 pcs. - ( 2 x 6 x 10 ) cocolumber forms = 350.00 say 350.00 bd.ft.
Coco Lumber 2" x 2" x 10' : for longitudinal construction joint
Use 2 times : 60.00 pcs. - ( 2 x 2 x 10 ) cocolumber forms = 200.00 say 200.00 bd.ft.
Common Wire Nails:
Provide 8 kgs. #4 Common wire nails
8 kgs. #3 Common wire nails
5 kgs. #1 1/2 Common wire na
#16 Tire Wire:
Provide 5 kgs.
Flat bar, 1/4" x 2" x 6 m. (used as groove during PCCP pouring at the weakened plane or construction joint) :
Provide 1 lgth.
Hard-blown asphalt (used as sealant), hot-laid :
Pour 0.125 kg. of hard-blown asphalt sealant for every linear meter of construction joint.
Length of construction joints :
= ( 70 m. / 4.50 m. block length ) x 4 m. PCCP width+ 70
= 132.22 m.
Volume of hard-blown asphalt (sealant) :
= 132.22 m. x 0.300 kg. / m. = 39.67 say 40.00 kgs. = kgs.
MANPOWER :
FABRICATION AND INSTALLATION OF FORMS INC. INSTALLATION OF RSB
1 - Gang Capability: 75.00 m. / day
210.00 m.
No. of Days Work = 2.80 say 3.00 day/s
75.00 m./day
1 Gang Composition:
4 Mason/Steelman/Carpenter
6 Laborer
CONCRETE POURING
1 - Gang Capability: 7.22cu.m / day (Class "A" Concrete)
56.00 cu.m
No. of Days Work = 7.76 say 8.00 day/s
7.22 cu.m/day
ENGR. JIMAR O. ALAD-AD ENGR. FELIX O. OGABANG Jr. ENGR. MARC PAULE R. LENDIO ENGR. AKEEM A. YADAO
ACT Technical Facilitator Municipal Engineer Regional Infra. Officer III PDO IV - Engineering
Field Office No.10
OFFICE of the BRGY. SUB-PROJECT MANAGEMENT COMMITTEE
Barangay Malinao
Municipality of KADINGILAN
Province of Bukidnon
BILL OF QUANTITIES
LCC
BLGU MLGU PLGU
No.of days
Item COMMUNITY
Description Qty. Unit Unit Price Amount KC-GRANT TOTAL LCC
IN-KIND
IN-KIND
IN-KIND
No. CONTRIBUTI
ON CASH CASH CASH
A. ) Equipment ( including
Operator
9,850.00 9,850.00 -
Mobilization/Demobilization -
Grader 15,000.00 15,000.00 15,000.00 -
Roller 15,000.00 15,000.00 15,000.00 -
30,000.00 30,000.00 -
C. ) Manpower
A. ) Material
Aggregate Base Course 85 cu.m. 1,166.00 99,110.00 5,950.00 93,160.00 93,160.00
99,110.00 5,950.00 -
B. ) Equipment inc. operator -
Road Grader 1 1 day/s 13,200.00 13,200.00 13,200.00 -
Road Roller (3-wheel road static
1 1 day/s 12,400.00 12,400.00 12,400.00 - -
roller)
25,600.00 25,600.00 - -
C. ) Fuel & Oil, Lubricants -
Road Grader ( 120 ltrs/day ) 120 ltrs. 50.00 6,000.00 6,000.00 -
Road Roller ( 60 ltrs/day ) 60 ltrs. 50.00 3,000.00 3,000.00 - -
Oil 4 ltrs. 190.00 760.00 760.00 -
A. ) Material
Aggregate Base Course 49 cu.m. 1,166.00 57,134.00 15,172.00 - 41,962.00 41,962.00
57,134.00 15,172.00 - - -
B. ) Equipment
Page 5
LCC
BLGU MLGU PLGU
No.of days
Item COMMUNITY
Description Qty. Unit Unit Price Amount KC-GRANT TOTAL LCC
IN-KIND
IN-KIND
IN-KIND
No. CONTRIBUTI
ON CASH CASH CASH
Road Roller (3-wheel road static roller 1 1 day/s 12,400.00 12,400.00 12,400.00 -
25,600.00 25,600.00 - -
C. ) Manpower
A. ) Material
Portland Cement 510 bags 295.00 150,450.00 150,450.00 -
Washed Sand 29 cu.m. 1,150.00 33,350.00 33,350.00 -
Washed Gravel 56 cu.m. 1,150.00 64,400.00 64,400.00 -
16 mm dia. X 6 m RSB 6 lgths 430.00 2,580.00 2,580.00 -
12 mm dia. X 6 m RSB 14 lgths 390.00 5,460.00 5,460.00
10 mm dia. X 6 m RSB 6 lgths. 250.00 1,500.00 1,500.00
2"x6" x 10' Coco Lumber 350 bd.ft. 18.00 6,300.00 6,300.00 -
2"x2" x 10' Coco Lumber 200 bd.ft. 18.00 3,600.00 3,600.00 -
#4 C.W.N 8 kgs. 80.00 640.00 640.00 -
#3 C.W.N 8 kgs. 80.00 640.00 640.00 -
#1 1/2 C.W.N 5 kgs. 80.00 400.00 400.00 -
1/4" x 2" x 6 m flat bar 1 lgth. 950.00 950.00 950.00
Hard blown asphalt (sealant) 40 kgs. 185.00 7,400.00 7,400.00
# 16 Tie Wire 5 kgs. 70.00 350.00 350.00 -
Hacksaw Blade 5 pcs. 95.00 475.00 475.00 -
278,495.00 278,495.00 - - - -
-
B. ) Equipment -
1 - bagger Concrete Mixer 1 8 day/s 1,150.00 9,200.00 9,200.00 -
1- Stick Conc. Vibrator 1 8 day/s 850.00 6,800.00 6,800.00 - -
16,000.00 16,000.00 - - - -
C. ) Fuel(Gasoline) -
1 - bagger Concrete Mixer 80 ltrs. 60.00 4,800.00 4,800.00 - -
1- Stick Conc. Vibrator 48 ltrs. 60.00 2,880.00 2,880.00
7,680.00 7,680.00 - - - -
D. ) Manpower -
Fabrication and installation of
forms inc. installation of RSB
Mason/Steelman/Carpenter 4 3 day/s 550.00 6,600.00 4,200.00 2,400.00 2,400.00
Laborer 6 3 day/s 450.00 8,100.00 4,500.00 3,600.00 3,600.00
Concrete Pouring - -
Mason 2 8 day/s 550.00 8,800.00 5,600.00 3,200.00 3,200.00
Concrete Mixer Operator 1 8 day/s 550.00 4,400.00 2,800.00 1,600.00 1,600.00
Stick Conc. Vibrator Operator 1 8 day/s 550.00 4,400.00 2,800.00 1,600.00 1,600.00
Laborer 10 8 day/s 450.00 36,000.00 20,000.00 16,000.00 16,000.00
68,300.00 39,900.00 28,400.00 - - - 28,400.00
E.) Manual Hauling Cost 10 3 day/s 450.00 13,500.00 7,500.00 6,000.00 6,000.00
13,500.00 7,500.00 6,000.00 - - - 6,000.00
ENGR. JIMAR O. ALAD-AD ENGR. FELIX O. OGABANG Jr. ENGR. MARC PAULE R. LENDIO ENGR. AKEEM A. YADAO
ACT Technical Facilitator Municipal Engineer Community Infra. Officer III PDO IV - Engineering
Page 6
Field Office No.10
OFFICE of the BRGY. SUB-PROJECT MANAGEMENT COMMITTEE
Barangay Malinao
Municipality of KADINGILAN
Province of Bukidnon
BILL OF QUANTITIES
LCC
BLGU MLGU PLGU
No.of days
Item COMMUNITY
Description Qty. Unit Unit Price Amount KC-GRANT TOTAL LCC
IN-KIND
IN-KIND
IN-KIND
No. CONTRIBUTI
ON CASH CASH CASH
A. ) Equipment ( including
Operator
9,850.00 9,850.00 -
Mobilization/Demobilization -
Grader 15,000.00 15,000.00 15,000.00 -
Roller 15,000.00 15,000.00 15,000.00 -
30,000.00 30,000.00 -
C. ) Manpower
A. ) Material
Aggregate Base Course 85 cu.m. 1,166.00 99,110.00 5,950.00 93,160.00 93,160.00
99,110.00 5,950.00 -
B. ) Equipment inc. operator -
Road Grader 1 1 day/s 13,200.00 13,200.00 13,200.00 -
Road Roller (3-wheel road static
1 1 day/s 12,400.00 12,400.00 12,400.00 - -
roller)
25,600.00 25,600.00 - -
C. ) Fuel & Oil, Lubricants -
Road Grader ( 120 ltrs/day ) 120 ltrs. 50.00 6,000.00 6,000.00 -
Road Roller ( 60 ltrs/day ) 60 ltrs. 50.00 3,000.00 3,000.00 - -
Oil 4 ltrs. 190.00 760.00 760.00 -
A. ) Material
Aggregate Base Course 49 cu.m. 1,166.00 57,134.00 15,172.00 - 41,962.00 41,962.00
57,134.00 15,172.00 - - -
B. ) Equipment
Page 7
LCC
BLGU MLGU PLGU
No.of days
Item COMMUNITY
Description Qty. Unit Unit Price Amount KC-GRANT TOTAL LCC
IN-KIND
IN-KIND
IN-KIND
No. CONTRIBUTI
ON CASH CASH CASH
Road Roller (3-wheel road static roller 1 1 day/s 12,400.00 12,400.00 12,400.00 -
25,600.00 25,600.00 - -
C. ) Manpower
A. ) Material
Portland Cement 510 bags 295.00 150,450.00 150,450.00 -
Washed Sand 29 cu.m. 1,150.00 33,350.00 33,350.00 -
Washed Gravel 56 cu.m. 1,150.00 64,400.00 64,400.00 -
16 mm dia. X 6 m RSB 6 lgths 430.00 2,580.00 2,580.00 -
12 mm dia. X 6 m RSB 14 lgths 390.00 5,460.00 5,460.00
10 mm dia. X 6 m RSB 6 lgths. 250.00 1,500.00 1,500.00
2"x6" x 10' Coco Lumber 350 bd.ft. 18.00 6,300.00 6,300.00 -
2"x2" x 10' Coco Lumber 200 bd.ft. 18.00 3,600.00 3,600.00 -
#4 C.W.N 8 kgs. 80.00 640.00 640.00 -
#3 C.W.N 8 kgs. 80.00 640.00 640.00 -
#1 1/2 C.W.N 5 kgs. 80.00 400.00 400.00 -
1/4" x 2" x 6 m flat bar 1 lgth. 950.00 950.00 950.00
Hard blown asphalt (sealant) 40 kgs. 185.00 7,400.00 7,400.00
# 16 Tie Wire 5 kgs. 70.00 350.00 350.00 -
Hacksaw Blade 5 pcs. 95.00 475.00 475.00 -
278,495.00 278,495.00 - - - -
-
B. ) Equipment -
1 - bagger Concrete Mixer 1 8 day/s 1,150.00 9,200.00 9,200.00 -
1- Stick Conc. Vibrator 1 8 day/s 850.00 6,800.00 6,800.00 - -
16,000.00 16,000.00 - - - -
C. ) Fuel(Gasoline) -
1 - bagger Concrete Mixer 80 ltrs. 60.00 4,800.00 4,800.00 - -
1- Stick Conc. Vibrator 48 ltrs. 60.00 2,880.00 2,880.00
7,680.00 7,680.00 - - - -
D. ) Manpower -
Fabrication and installation of
forms inc. installation of RSB
Mason/Steelman/Carpenter 4 3 day/s 550.00 6,600.00 4,200.00 2,400.00 2,400.00
Laborer 6 3 day/s 450.00 8,100.00 4,500.00 3,600.00 3,600.00
Concrete Pouring - -
Mason 2 8 day/s 550.00 8,800.00 5,600.00 3,200.00 3,200.00
Concrete Mixer Operator 1 8 day/s 550.00 4,400.00 2,800.00 1,600.00 1,600.00
Stick Conc. Vibrator Operator 1 8 day/s 550.00 4,400.00 2,800.00 1,600.00 1,600.00
Laborer 10 8 day/s 450.00 36,000.00 20,000.00 16,000.00 16,000.00
68,300.00 39,900.00 28,400.00 - - - 28,400.00
E.) Manual Hauling Cost 10 3 day/s 450.00 13,500.00 7,500.00 6,000.00 6,000.00
13,500.00 7,500.00 6,000.00 - - - 6,000.00
ENGR. JIMAR O. ALAD-AD ENGR. FELIX O. OGABANG Jr. ENGR. MARC PAULE R. LENDIO ENGR. AKEEM A. YADAO
ACT Technical Facilitator Municipal Engineer Community Infra. Officer III PDO IV - Engineering
Page 8
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI CIDSS:NCDDP PROJECT
Field Office No.10
OFFICE of the BRGY. SUB-PROJECT MANAGEMENT COMMITTEE
Barangay Malinao
Municipality of KADINGILAN
Province of Bukidnon
PROGRAM OF WORK
Name of Project : Concreting of 0.070 km. Farm to Market Road along purok 5
Category : Public Good
Physical Target : 0.070 Kilometers
Total Sub-Project Cost : PHP 982,300.00
105 Sub - Grade Preparation 9.80% 490.00 sq.m. 137.24 800.000 - - - 66,450.000 67,250.00
201(A) Aggregate Base Course 19.87% 85.00 cu.m. 1,604.24 800.000 - 93,160.000 - 42,400.000 136,360.00
201(B) Aggregate Base Course (Shouldering) 12.19% 49.00 cu.m. 1,706.82 400.000 - 41,962.000 - 41,272.000 83,634.00
311(2) Portland Cement Concrete Pavement 55.96% 280.00 sq.m. 1,371.34 34,400.000 - - - 349,575.000 383,975.00
% of Cost Sharing 73.99% 6.15% 0.00% 0.00% 6.11% 13.76% 0.00% 0.00% 0.00% 26.01% 100.00%
ENGR. JIMAR O. ALAD-AD ENGR. FELIX O. OGABANG Jr. ENGR. MARC PAULE R. LENDIO ENGR. AKEEM A. YADAO
ACT Technical Facilitator Municipal Engineer Regional Infra. Officer III PDO IV - Engineering
Name of Proposed Community Project : Concreting of 0.070 km. Farm to Market Road along purok 5 Date Prepared: 15-May-18
Barangay : Mabunga Municipality: Baungon Provice: Bukidnon Total Sub-project Cost: 982,300.00
Community Project Duration: 90 CD Proposed Mode/Model of Implementation: By Contract and Community Force Account
Type of Plan: ( ) Initial (x) Final
PACKAGE
201(A) Aggregate Base Course 85 cu.m. 498.82 42,400.00 42,400.00 Construction, LBL Traffic 1st Tranche
Control & Construction Services
#REF! #REF! #REF! mtrs #VALUE! #VALUE! #VALUE!
SUB-TOTAL #VALUE! #VALUE! CSW Aug-18 - -
Portland Cement #VALUE! bags #VALUE! #VALUE! #VALUE!
Schedule 1 #VALUE! bags #VALUE! #VALUE! #VALUE!
1st Tranche
Schedule 2 300 bags #VALUE! #VALUE! #VALUE!
Schedule 3 300 bags #VALUE! #VALUE! #VALUE!
Schedule 4 300 bags #VALUE! #VALUE! #VALUE!
2nd Tranche
Schedule 5 300 bags #VALUE! #VALUE! #VALUE!
16 mm dia. X 6 m RSB 6 lgths 430.00 2,580.00 2,580.00
10 mm dia. X 6 m RSB 6 lgths. 250.00 1,500.00 1,500.00
#4 C.W.N #VALUE! kgs. #VALUE! #VALUE! #VALUE!
#3 C.W.N 8 kgs. 80.00 640.00 640.00
#1 1/2 C.W.N #VALUE! kgs. #VALUE! #VALUE! #VALUE!
1/4" x 2" x 6 m flat bar 1 lgth. 950.00 950.00 950.00
Hard blown asphalt (sealant) 40 kgs. 185.00 7,400.00 7,400.00 New Cagayan CCH Hardware,
# 16 Tie Wire #VALUE! kgs. #VALUE! #VALUE! #VALUE! Diamond Star Trading, Caliber
Industrial Sales Corp., New CDO
P-2
Hacksaw Blade 5 pcs. 95.00 475.00 475.00 Prime Construction & Gen.
#REF! #REF! #REF! #REF! #REF! #REF! Mdse. Inc., LBL Traffic Control &
Construction Services
#REF! #REF! #REF! #REF! #REF! #REF!
2"x2" x 10' Coco Lumber 200 bd.ft. 18.00 3,600.00 3,600.00 1st Tranche
BULLETIN BOARD/SIGNAGE 1 lot 15,000 15,000.00 15,000.00 Services, Universal Testing Lab, 1st Tranche
Pavement Solution Center
#VALUE!
CBPM Form A-1
KALAHI-CIDSS NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT
COMMUNITY PROCUREMENT PLAN (CPP)
Name of Proposed Community Project : Concreting of 0.070 km. Farm to Market Road along purok 5 Date Prepared: 6-Apr-21
Barangay Malinao Municipality: Kadingilan Provice: Bukidnon Total Sub-project Cost: 982,300.00
Community Project Duration: 60 CD Proposed Mode/Model of Implementation: By Contract
Type of Plan: ( ) Initial (x) Final
PACKAGE
ITEMS TO BE PROCURED QTY. UNIT UNIT COST PROCUR- Contractors/Suppliers per TRANCHING
METHOD
TOTAL COST GRANT LCC EMENT Package
-
Republic of the Philippines
Department of Social Welfare and Development
KALAHI CIDSS-NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROGRAM
OFFICE OF THE BARANGAY DEVELOPMENT COUNCIL-TECHNICAL WORKING GROUP
COMPARATIVE COST
PLANNED VS ACTUAL PROCUREMENT
PACKAGE NO. 1
105 Sub - Grade Preparation 490.00 sq.m. 135.61 66,450.00 490.00 sq.m. 85.07 41,684.30 24,765.70
201(A) Aggregate Base Course 85.00 cu.m. 1,594.82 135,560.00 85.00 cu.m. 610.85 51,922.25 83,637.75
201(B) Aggregate Base Course (Shouldering) 49.00 cu.m. 1,698.65 83,234.00 49.00 cu.m. 882.21 43,228.29 40,005.71
311(2) Portland Cement Concrete Pavement 280.00 sq.m. 1,248.48 349,575.00 280.00 sq.m. 1,980.73 554,604.40 (205,029.40)
SPL 1 BULLETIN BOARD/SIGNAGE 1 lot 15,000.00 15,000.00 1 lot 9,358.13 9,358.13 5,641.87
SPL 2 Overhead Cost 1 lot 42,000.00 42,000.00 1 lot 0.00 - 42,000.00
SPL 3 Misc Expenses (Mat. Test, PPE & Hand Tools) 1 lot 6,700.00 6,700.00 1 lot 0.00 - 6,700.00
SPL 4 Contractors Profit 1 lot 68,621.90 68,621.90 1 lot 0.00 - 68,621.90
SPL 5 Tax 1 lot 41,377.05 41,377.05 1 lot 0.00 - 41,377.05
SUB-TOTAL 808,517.95 700,797.37 107,720.58 -
Approved By:
JULIANA P. DALUMPINES
BDC-TWG Chair
Republic of The Philippines
Department of Social Welfare and Development
KALAHI-CIDSS: NCDDP-AF
Office of the BDC-TWG
Barangay Malinao
Municipality of Kadingilan
Province of Bukidnon
You are hereby directed to make the herein described changes from the PLANS and SPECIFICATIONS , or do the following described works included in
the PLANS and SPECIFICATIONS.
We, the undersigned implementor have given careful consideration Difference in cost change. . . . . . . . . . . . . 72,677.80
to the proposed changes and hereby agree. If this proposal is Net Cost of Previous Changes. . . . . . . . 72,677.80
approved we will provide adequate material, labor and equipment to Original Contract/Approved Amount. . 982,300.00
perform any of all services necessary for the process shown on the Estimated Revised Contract/Approved Amount 909,622.20
reverse side of this sheet. By Reason of this Proposed Change, ______days extension of working time
will be allowed.
ENGR. FELIX O. OGABANG Jr. ENGR. AKEEM A. YADAO HON. EDGARDO P. CABILOGAN
Municipal Engineer PDO-IV Barangay Chairman
Republic of the Philippines
Department of Social Welfare and Development
Field Office 10
KALAHI-CIDSS : NCDDP
Office of the Barangay Sub-Project Management Committee
Province of Bukidnon
Municipality of KADINGILAN
Barangay Malinao
BILL OF QUANTITIES
ORIGINAL/APPROVED COST ACTUAL CHANGES/ NEW VARIATIONS
Rate per TOTAL
Rate per Rate per AMOUNT
Item No. Item Description No. of No. of No. of Day / Remarks
Day / Day / (Variance)
Quantity Unit Crew / In-kind Cash Total Quantity Unit Crew / In-kind Cash Total Quantity Unit Crew / In-kind Cash Total
Unit Cash
Eqpt. Eqpt. Eqpt. Unit
Cost Unit Cost
105 Sub - Grade Preparation 490 sq.m. 490.00 sq.m. 85.07 800.00 41,684.30 42,484.30 Cost
A. ) Equipment ( including Operator
TOTAL FOR SUB-GRADE PREPARATION 800.00 66,450.00 67,250.00 800.00 41,684.30 42,484.30 - 24,765.70
201(A) Aggregate Base Course 85 cu.m. 85.00 cu.m. 610.85 800.00 51,922.25 52,722.25
A. ) Material
Aggregate Base Course 85 cu.m. 1,166 99,110.00 99,110.00
99,110.00 99,110.00
B. ) Equipment inc. operator
Road Grader 1 day/s 1 13,200 13,200.00 13,200.00
Road Roller (3-wheel road static 1 day/s 1 12,400 12,400.00 12,400.00
25,600.00 25,600.00
C. ) Fuel & Oil, Lubricants
Road Grader ( 120 ltrs/day ) 120 ltrs. 50 6,000.00 6,000.00
Road Roller ( 60 ltrs/day ) 60 ltrs. 50 3,000.00 3,000.00
Oil 4 ltrs. 190 760.00 760.00
Grease 2 lbs. 45 90.00 90.00
9,850.00 9,850.00
D. ) Manpower
Labor (Spotter) 2 days 2 450 800.00 1,000.00 1,800.00
800.00 1,000.00 1,800.00
TOTAL FOR AGGREGATE BASE COURSE (Roadway Base) 800.00 135,560.00 136,360.00 800.00 51,922.25 52,722.25 83,637.75
TOTAL FOR AGGREGATE BASE COURSE (Road Shouldering) 400.00 83,234.00 83,634.00 - - - 83,234.00
B. ) Equipment
1 - bagger Concrete Mixer 1.00 day/s 8.00 1,150.00 9,200.00 9,200.00
1- Stick Conc. Vibrator 1.00 day/s 8.00 850.00 6,800.00 6,800.00
16,000.00 16,000.00
C. ) Fuel(Gasoline)
1 - bagger Concrete Mixer 80.00 ltrs. 60.00 4,800.00 4,800.00
1- Stick Conc. Vibrator 48.00 ltrs. 60.00 2,880.00 2,880.00
7,680.00 7,680.00
D. ) Manpower
Fabrication and installation of forms inc. installation of RSB
Mason/Steelman/Carpenter 4.00 day/s 3.00 550.00 2,400.00 4,200.00 6,600.00
Laborer 6.00 day/s 3.00 450.00 3,600.00 4,500.00 8,100.00
Concrete Pouring - -
Mason 2.00 day/s 8.00 550.00 3,200.00 5,600.00 8,800.00
Concrete Mixer Operator 1.00 day/s 8.00 550.00 1,600.00 2,800.00 4,400.00
Stick Conc. Vibrator Operator 1.00 day/s 8.00 550.00 1,600.00 2,800.00 4,400.00
Laborer 10.00 day/s 8.00 450.00 16,000.00 20,000.00 36,000.00
28,400.00 39,900.00 68,300.00
E.) Manual Hauling Cost 10.00 day/s 3.00 450.00 6,000.00 7,500.00 13,500.00
6,000.00 7,500.00 13,500.00
TOTAL FOR PORTLAND CEMENT CONCRETE PAVEMENT 34,400.00 349,575.00 383,975.00 34,800.00 597,832.69 632,632.69 - ###
SUB-PROJECT SIGNAGE /
SPL-1 1 Unit 1.00 Unit 9,358.13 9,358.13 9,358.13
BILLBOARD
SUB-PROJECT SIGNAGE /
1 Unit 15,000.00 15,000.00 15,000.00
BILLBOARD
Sub-Total 15,000.00 15,000.00
TOTAL FOR SUB-PROJECT SIGNAGE / BILLBOARD 15,000.00 15,000.00 9,358.13 9,358.13 - 5,641.87
EXTRA WORK
105 Sub - Grade Preparation 16.00 Sq.m 85.07 1,361.12 1,361.12 16.00 Sq.m - 85.07 - 1,361.12 1,361.12
Length 4.00 m
Width 4.00 m
Area 16.00 Sq.m
TOTAL FOR SUB-GRADE PREPARATION TOTAL FOR SUB-GRADE PREPARATION 1,361.12 1,361.12 1,361.12 1,361.12 - 1,361.12
201(A) Aggregate Base Course 5.52 cu.m 610.85 3,371.89 3,371.89 5.52 cu.m
Length 4.00 m
Width 4.00 m
Thickness 0.30 m
Volume 4.80 cu.m
TOTAL FOR AGGREGATE BASE COURSE 3,371.89 3,371.89 3,371.89 3,371.89 - 3,371.89
311(2) Portland Cement Concrete Pavement 16.00 sq.m 1,980.73 31,691.68 31,691.68 16.00 sq.m
Length 4.00 m
Width 4.00 m
Thickness 0.20 m
Area 16.00 sq.m
Volume 4.80 cu.m
TOTAL DIRECT COST 36,400.00 649,819.00 686,219.00 36,400.00 737,222.06 773,622.06 - (87,403.06) - 87,403.06 - 87,403.06 -
Pre Engineering 30,000.00 - 30,000.00 30,000.00 30,000.00
Eng'g Supervision 30,000.00 - 30,000.00 30,000.00 30,000.00 - - -
Overhead Cost 24,000.00 42,000.00 66,000.00 24,000.00 24,000.00 - 42,000.00 42,000.00 42,000.00
Administrative Cost - 47,675.00 47,675.00 52,000.14 52,000.14 - (4,325.14) (4,325.14) - 4,325.14
not
Contingency - 5,707.06 5,707.06 - - 5,707.06 5,707.06 5,707.06
requested
Miscellaneous Expenses - 6,700.00 6,700.00 - - - 6,700.00 6,700.00 6,700.00
Contractors Profit (10% of DC) - 68,621.90 68,621.90 - - 68,621.90 68,621.90 68,621.90
Tax (5% of DC) - 41,377.05 41,377.05 - 41,377.05 41,377.05
TOTAL INDIRECT COST 84,000.00 212,081.00 296,081.00 - - 54,000.00 52,000.14 136,000.14 - 160,080.86 160,080.86 118,703.82 -
550,709.00
GRAND TOTAL 120,400.00 861,900.00 982,300.00 - - 90,400.00 789,222.20 909,622.20 30,000.00 72,677.80 72,677.80 72,677.80 -
ENGR. TONY REY L. NIDOY ENGR. FELIX O. OGABANG Jr. ENGR. AKEEM A. YADAO
RIO-III Municipal Engineer PDO IV
Republic of the Philippines
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI CIDSS-NCDDP
Name of Sub-project : Concreting of 0.070 km. Farm to Market Road along purok 5
Location : Malinao, Kadingilan, Bukidnon
Total Approved Cost : Php982,300.00
Cost Sharing: KALAHI : Php726,778.00
Community : Php60,400.00
Barangay Unit : -
Municipal/others : Php195,122.00
PLGU : -
Actual
Accomplished Actual
Item No. Work Items Quantity Unit Approved Cost Rel. Wt Actual Cost Accomplishm Accum.Cost Remaining Quantity Estimated Cost
Quantity Rel. Wt
ent(%)
105 Sub - Grade Preparation 490.00 sq.m. Php 66,450.00 10.23% 490.00 sq.m. 5.95% Php 41,684.30 5.95% Php 41,684.30 - sq.m. -
201(A) Aggregate Base Course 85.00 cu.m. Php 135,560.00 20.86% 85.00 cu.m. 7.41% Php 51,922.25 7.41% Php 51,922.25 - cu.m. -
SPL 1 BULLETIN BOARD/SIGNAGE 1.00 Unit Php 15,000.00 2.31% 1.00 Unit 1.34% Php 9,358.13 1.34% Php 9,358.13 - Unit -
PHP 649,819.00 100.00% 100.00% PHP 700,797.37 100.00% 700,797.37 -
II. PHYSICAL DESCRIPTION (Describe any unacceptable appearance from that of the plan e.g. physical dimension, workmanship)
V. FINANCIAL:
Releases: Disbursed:
Php654,100.20
IX. RECOMMENDATIONS :
INSPECTORATE TEAM:
Inspectorate Team should prepare official communication to the LGU & BSPMC on the results of inspection for their appropriate action.
This report will form as an attachment
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI-CIDSS-NCDDP AF
Field Office No.10
Name of Sub-project Concreting of 0.070 km. Farm to Market Road Total Sub-Project Cost : PHP 982,300.00
along purok 5 Direct Cost : Php 686,219.00
Physical Target :0.070 km Indirect cost : Php 296,081.00
Region 10 Date Started : 11/27/2021
Province Bukidnon Target Completion Date : 1/26/2022
Municipality Kadingilan Mode of Implementation : By Contract
Barangay :Malinao
ENGR. TONY REY L. NIDOY ENGR. FELIX O. OGABANG Jr. DIOSCORO TAUTJO
RPMO-RIO III Municipal Engineer BDC-TWG Chairperson
Republic of the Philippines
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI CIDSS-NCDDP
Name of Sub-project : Concreting of 0.070 km. Farm to Market Road along purok 5
Location : Malinao, Kadingilan, Bukidnon
Total Approved Cost : Php982,300.00
Cost Sharing: KALAHI : Php726,778.00
Community : Php60,400.00
Barangay Unit : -
Municipal/others : Php195,122.00
PLGU : -
Actual
Accomplished Actual
Item No. Work Items Quantity Unit Approved Cost Rel. Wt Actual Cost Accomplishm Accum.Cost Remaining Quantity Estimated Cost
Quantity Rel. Wt
ent(%)
105 Sub - Grade Preparation 16.00 sq.m. Php 1,361.12 3.74% 16.00 sq.m. 3.74% Php 1,361.12 3.74% Php 1,361.12 - sq.m. -
201(A) Aggregate Base Course 5.52 cu.m. Php 3,371.89 9.26% 5.52 cu.m. 9.26% Php 3,371.89 9.26% Php 3,371.89 - cu.m. -
II. PHYSICAL DESCRIPTION (Describe any unacceptable appearance from that of the plan e.g. physical dimension, workmanship)
V. FINANCIAL:
Releases: Disbursed:
IX. RECOMMENDATIONS :
INSPECTORATE TEAM:
Inspectorate Team should prepare official communication to the LGU & BSPMC on the results of inspection for their appropriate action.
This report will form as an attachment
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI-CIDSS-NCDDP PROJECT
Field Office No.10
Name of Sub-project Concreting of 0.070 km. Farm to Market Road Total Sub-Project Cost PHP 982,300.00
:
along purok 5 (Variation Order additional 4.0 m
concrete) Direct Cost : Php 686,219.00
Physical Target 0.004 km Indirect cost : Php 296,081.00
Region : 10 Date Started : 3/3/2022
Province Bukidnon Target Completion Date : 3/17/2022
Municipality Kadingilan Mode of Implementation : By Contract
Barangay : Malinao
ENGR. TONY REY L. NIDOY ENGR. FELIX O. OGABANG Jr. DIOSCORO TAUTJO
RPMO-RIO III Municipal Engineer BDC-TWG Chairperson
Republic of the Philippines
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI CIDSS-NCDDP
Name of Sub-project : Concreting of 0.070 km. Farm to Market Road along purok 5
Location : Malinao, Kadingilan, Bukidnon
Total Approved Cost : Php982,300.00
Cost Sharing: KALAHI : Php726,778.00
Community : Php60,400.00
Barangay Unit : -
Municipal/others : Php195,122.00
PLGU : -
Actual
Accomplished Actual
Item No. Work Items Quantity Unit Approved Cost Rel. Wt Actual Cost Accomplishm Accum.Cost Remaining Quantity Estimated Cost
Quantity Rel. Wt
ent(%)
I Sub - Grade Preparation 490.00 sq.m. Php 67,250.00 9.80% 490.00 sq.m. 5.67% Php 43,845.42 5.67% Php 43,845.42 - sq.m. -
II Aggregate Base Course 85.00 cu.m. Php 136,360.00 19.87% 85.00 cu.m. 7.25% Php 56,094.14 7.25% Php 56,094.14 - cu.m. -
SPL BULLETIN BOARD/SIGNAGE 1.00 Unit Php 15,000.00 2.19% 1.00 Unit 1.21% Php 9,358.13 1.21% Php 9,358.13 - Unit -
PHP 686,219.00 100.00% 100.00% PHP 773,622.06 100.00% #DIV/0! #DIV/0!
II. PHYSICAL DESCRIPTION (Describe any unacceptable appearance from that of the plan e.g. physical dimension, workmanship)
a) All Scope of works from lay outing to finishing was constructed in accordance with the standard working methodology and the materials used is in accordance to specifications
V. FINANCIAL:
Releases: Disbursed:
Php654,100.20
IX. RECOMMENDATIONS :
INSPECTORATE TEAM:
Inspectorate Team should prepare official communication to the LGU & BSPMC on the results of inspection for their appropriate action.