You are on page 1of 8

Stampato il: 03/02/2023

A B C D E F G
1 Qualifying Companies RFQE28
2 PHOTOVOLTAIC INVERTER
3 Questionnarie data collection
4
5
NOTE: Only load data that relate to the production site indicated in line 13 and
6
follow the footnotes
7 DATA QUALIFICATION (RFQ):
8 No RFQ. WHICH n. Year of completion
9 COMPANY
10 Company EDUSA GREEN ENERGY SRL
11 Registered Office: Str. Pitar Mos, Nr. 29, Sector 1, CP: 010454, Bucuresti
12 Sales Office: (1)
13 Head Office Production (1)
14 Ref Contact
15
Certificate (5)
16 QUALITY REQUIREMENTS 'MINIMUM REQUIRED (Yes / No)
[Yes / No]
Maturity Date

Supply Inverter with output> 250 kVA for a total capacity of 100 MVA in the
17 last 3 years (2) (Cap.3a) (attach list)
18 Declaration requirements base (Cap.3b, c, d, e, f, g.)
Implementation in accordance with a Quality Management System (QMS) in
19 accordance with ISO 9001-2008 (Cap.3h)
SI SI 23.07.2022

Implementation according to an Environmental Management System (EMS)


20 in accordance with ISO 14001:2004 (Cap.3i)
SI SI 23.07.2022

Implementation according to a Health and Safety Management System


21 (SMS) compliant in accordance with ISO 18001:2007 (not required)
SI SI 23.07.2022

22
23 COMPANY DETAILS
24 Year of Establishment Company: 2014
25 Year of start production solar inverters:
26 Executives: n.
27 Administrative clerical workers: n.
28 Commercial clerical workers: n.
29 Technical clerical workers: n.
30 Workers: n.
31 Employees workforce n. 0 Total
32
33 OCCUPIED SURFACE:
34 Unit office: m2
35 Unit production: m2
36 Unit laboratory / testing room: m2
37 Stock Unit: m2
38 Units various and other m2
39 Total surf. cover m2 0 Total (Attach plant)
40 Total surf. discovery m2
41
42 PRODUCTION UNIT (Only solar inverter with size from 250 kVA or more) (2)
43 1st year previous MW / year With tip Max Prod MW / wk.
44 2nd year previous MW / year With tip Max Prod MW / wk.
45 3rd year previous MW / year With tip Max Prod MW / wk.
46
47 COMPANY STRUCTURE (Internal / External)
48 Management
49 Quality and Testing
50 Design technique
51 Management technique
52 Testing
53 Production product

File: 648257237.xlsx pag 1 di 8 Scheda: Company Data


Stampato il: 03/02/2023

A B C D E F G
1 Qualifying Companies RFQE28
2 PHOTOVOLTAIC INVERTER
3 Questionnarie data collection
4
5
54 Assembling product
55

File: 648257237.xlsx pag 2 di 8 Scheda: Company Data


Stampato il: 03/02/2023

A B C D E F G
1 Qualifying Companies RFQE28
2 PHOTOVOLTAIC INVERTER
3 Questionnarie data collection
4
5
56 STRUCTURE BEFORE AND AFTER SALES
57 (Indicate number of points Pre / Post sales of existing and active in the various countries in the world)
58 Continent Pre Sale Service After Sales Service
59 Western Europe n. n.
60 East Europe n. n.
61 North America n. n.
62 Central America n. n.
63 South America n. n.
64 North Africa n. n.
65 South Africa n. n.
66 Asia n. n.
67 East Asia n. n.
68 Australia and Oceania n. n.
69
70 COUNTRIES WITH RECENT ORDERS DATA ACQUISITION (Last 3 years)
71 (Indicate the number dele MW supplies and products in different countries in the world)
72 Continent Acquisition Orders Power Supply
73 Western Europe n. MW
74 East Europe n. MW
75 North America n. MW
76 Central America n. MW
77 South America n. MW
78 North Africa n. MW
79 South Africa n. MW
80 Asia n. MW
81 East Asia n. MW
82 Australia and Oceania n. MW
83
84 LIST OF NATIONS (Insert list of countries significant nations)
....................................................

85

86
87 COUNTRIES MARKET DATA FOR THE FUTURE (next 3 years)
88 (Indicate the number dele supplies and MW forecast in the various countries in the world)
89 Continent Forecast Orders Power Supply
90 Western Europe n. MW
91 East Europe n. MW
92 North America n. MW
93 Central America n. MW
94 South America n. MW
95 North Africa n. MW
96 South Africa n. MW
97 Asia n. MW
98 East Asia n. MW
99 Australia and Oceania n. MW
100
101 LIST OF NATIONS (Insert list of countries significant nations)
....................................................

102

File: 648257237.xlsx pag 3 di 8 Scheda: Company Data


Stampato il: 03/02/2023

A B C D E F G
1 Qualifying Companies RFQE28
2 PHOTOVOLTAIC INVERTER
3 Questionnarie data collection
4
5
103

File: 648257237.xlsx pag 4 di 8 Scheda: Company Data


Stampato il: 03/02/2023

A B C D E F G
1 Qualifying Companies RFQE28
2 PHOTOVOLTAIC INVERTER
3 Questionnarie data collection
4
5
104 QUESTIONNAIRE Reply
1) load management / output goods in the warehouse automation [SI = Bar Code, NO =
105 Other]
(Yes / No)

2) Managing the production cycle with automated identification key components [SI = Bar
106 Code, NO = Other]
(Yes / No)

3) Managing the design and development of automated product [YES = through


107 computerized platform, NO = Other] (3)
(Yes / No)

108 Software platform type / Rev:

109 4) Task Manager automated order [SI = through computerized platform, NO = Other] (3) (Yes / No)

110 Software platform type / Rev:


5) Lines for the production / assembly autotatizzata [SI = automatic / semiautomatic NO
111 = Other]
(Yes / No)

6) The laboratory is equipped with a climate chamber certified according to the power of
112 the components produced
(Yes / No)

7) The test room is dotatoa test bench and certified instrumentation adequate power for
113 the components produced
(Yes / No)

8) Production site with more production centers (excluding contractors / induced) [SI = +
114 pole, single pole NO =]
(Yes / No)

9) The production / assembly of the product is made in or by a third party [SI = internal,
115 NO = third persons]
(Yes / No)

10) In the case of multiple production centers in the world or contractors to disclose the
116 impact of the production made ​within the site in relation to the total production (%)
[%]according to quality control plan (QCP)

11) In the case of multiple poles of production or contractors procedures and / or


117 operating instructions are Standardize and equal in all poles or contractors according to (Yes / No)
quality control plan (QCP)
118 12) Percentage of annual turnover of investment in research and development:
119 a) New technologies and new products (%)
120 b) Test and improve existing products (%)
121 c) Certification and laboratory (%)

13) Max. delivery of the product from the date of order confirmation [insert calendar
122 days]
(Gg)

14) The company has the plan certification of measuring instruments. (If you attach
123 equipment list with certificate expiration dates)
(Yes / No)

15) The company has a plan for quality control. (If you attach list of operational
124 procedures and operating instructions list)
(Yes / No)

125
126
127 NOTES
(Article 47 T.U. - Presidential Decree no. 445 of 28/12/2000)
128 Aware that in the event of untruthful statement, the DPR 445/2000 provides for criminal penalties and forfeiture of
129 benefits (art. 76 and 75) and informed / in which data will be utilizzazti pursuant to Legislative Decree 196/2003;
immediatamenta and decadence of the qualification enterprise by the Enel Group.
130 The data entered must refer to the Company and to the production site richedente qualification (subject to audit), any
131 other production sites only need to be specified in the additional comments.
132 (1) If different from the registered office
(2) Indicate only supplies power inverter with 250 kVA up
133 (3) Indicate the type of system and review
134 (4) In case of any additional notes attach a separate document titled "ADDITIONAL NOTES"
(5) Quality certificate issued by an accredited EA (European Co-Operation Accreditation) in compliance with UNI CEI EN
135 45012AGGIUNTIVE
136 in
137
138
139

File: 648257237.xlsx pag 5 di 8 Scheda: Company Data


immediatamenta and decadence of the qualification enterprise by the Enel Group.
The data entered must refer to the Company and to the production site richedente qualification (subject to audit), any
other production sites only need to be specified in the additional comments.
(1) If different from the registered office Stampato il: 03/02/2023
(2) Indicate only supplies power inverter with 250 kVA up
(3) Indicate the type of system and review
(4) In case of anyAadditional notes attach a separate
B C titled "ADDITIONAL
document D NOTES"E F G
1 (5) Quality certificate issued by an accredited EA (European
Qualifying Co-OperationRFQE28
Companies Accreditation) in compliance with UNI CEI EN
45012AGGIUNTIVE
2 PHOTOVOLTAIC INVERTER
3 Questionnarie data collection
4
5
140
141

File: 648257237.xlsx pag 6 di 8 Scheda: Company Data


Stampato il: 03/02/2023

A B C D E F G
1 Qualifying Companies RFQE28
2 PHOTOVOLTAIC INVERTER
3 Questionnarie data collection
4
5
142 DATA PRODUCT
143 Key Features of the product range
144
145 SIZE POWER (Only centralized solar inverters from 250 kVA at 2000 kVA) (2)
146 Enter 5 sizes too used [kVA] (Value to kVA)
147
148 DATA ENTRY DC Compliant
149 Maximum system voltage (a) 1000/1500 (Yes / No)
150 Operating voltage min. / Max. [Vmpp] (b) Min/Max (Value to V)
151
152 ENTRY GUARDS DC Compliant
153 Gounding Protection Kit (MT=Switch; FU=Fuse;NA=Not Applicable) (MT/FU/NA)
154 Minimum time between 2 failures (MTBF) [unit time in hours] (h)
155
156 DATA OUTPUT SIDE AC Compliant
157 Rated output voltage [V] (b) (Value to V)
158 Rated power factor ≥ 0.95 (Yes / No)
159 Current Harmonic Distortion THD [%] (c) ≤ 3% (Yes / No)
160 Maximum imbalance of Currents [%] ≤ 2% (Yes / No)
161
162 PERFORMANCE AND EFFICIENCY MACHINE Compliant
163 Weighing Efficiency (ƞEuro) [%] (d) ≥ 98% (Yes / No)
164 Maximum efficiency (ƞmax) [%] (d) ≥ 98% (Yes / No)
165 Static MPPT Efficiency [%] (e) ≥ 99.8% (Yes / No)
166 Dynamic MPPT Efficiency [%] (e) ≥ 99.7% (Yes / No)
167 Switching Frequency Converter (f) (Value to Hz)
168
169 CORRESPONDENCE WITH THE REQUIREMENTS OF CONNECTION Compliant
170 Insensitive to voltage sags (Yes / No)

171 Adjusting Active Power (in line with the capability curve) (Yes / No)

172 Adjusting Reactive Power (in line with the capability curve) (Yes / No)
173
174 ACCESSORIES Compliant
175 Paintings of subfield with strings protection and monitoring (Yes / No)
176 Artifact cabin in concrete and / or insulated metal panel (Yes / No)
177 Artifact walk-in metal container maritime (Yes / No)
178
179 SIGNIFICANT SUPPLIES LIST OF PARTS
180 (Indicate brand and percentage of incidence of the component purchased from third parties)
181 Component Supplier Incidence of supply [%]
182 Electronic cards
183 Filters
184 Transformer reactance and BT
185 Capacitors
186 IGBT / Semiconductors
187 Switchboards BT
188 MV / LV transformers
189 Switchboards MT
190 Switches and accessories MT
191 Artifacts cabs
192 Assemblers Cabin MV / LV

File: 648257237.xlsx pag 7 di 8 Scheda: Company Data


Stampato il: 03/02/2023

A B C D E F G
1 Qualifying Companies RFQE28
2 PHOTOVOLTAIC INVERTER
3 Questionnarie data collection
4
5
193 Inverter Assemblers / Paintings
194 Incidence supply: Indicate breakdown % in the case of multiple brands for the same component
195
NOTES
196 a) Maximum voltage of the inverter isolation
197 b) The value of the operating voltage to nominal AC power
c) For a value of output power greater than 25% of rated output
198 d) The values ​refer to the nominal voltage shall be measured at the terminals of the equipment inclusive of any transformer
199 e) The measurement of the efficiency MPPT must be conducted in accordance with standards of EN 50530, as amended and
supplemented (as amended)
200 f) In the event of any additional notes to attach a separate document titled "ADDITIONAL NOTES"
201
202
203
204
205
206
207
208 IN THE CASE OF OTHER UNITS 'PRODUCTION OF SOLAR INVERTER CENTRAL (≥ 250 kW)
209 INDICATE MAX UNIT 5 'PRODUCTIVE:
Total surface covered
210 Country Total work force[P]
[m2]
Total production [MW]

211
212
213
214
215
216
217 ADDITIONAL COMMENTS (Enter any comments)
....................................................

218

219

File: 648257237.xlsx pag 8 di 8 Scheda: Company Data

You might also like