You are on page 1of 1

Page 1 of 1

QUALITY ASSURANCE PROCEDURE


Doc. No. UMC-QHSE-QA-CNC/01
CONTROL OF NONCONFORMANCE Issue/Rev 02/00
PROCEDURE Date 01/03/2020

NON-CONFORMITY CORRECTIVE ACTION REQUEST


NC Client/Internal Complaint Internal Audit/Inspection Other
Source:
Detected By Eng. Abutalib Adam Date recorded 13/02/2023
Dept. /Area Tailing Acquisition Process/Activity CIC

Description of non-conformance
There is no list available and the following devices such as AAS, flowmeter, pH meter, sensitive balance,
automatic cyanide ppm calibration device not calibrated.
All instruments need calibration.

Auditor Name and Signature Abutalib Adam Date: 13/02/2023

*To be filled by auditee/Concerned person


Potential Causes

Proposed Corrective Action

Expected Date for Corrective Action:


Auditee/Concerned person Algezoli + Oshee Date : 17/02/2023
QHSE Manager /Head Mr. Jassim M. Mahgoub Date : 17/02/2023

FOR QHSE DEPT. USE ONLY


Verification / effectiveness of the corrective action including any evidence documents to demonstrate
closure of NC

Auditor/Verifier Signature Date QHSE Signature

___/___/20___

You might also like