Professional Documents
Culture Documents
QA PROCEDURES
.Doc. No UMC-QHSE-QA-AU/05
Issue/ Rev 02/00
AUDIT PROCEDURE
Date 01/03/2020
AUDIT REPORT
1. Proper housekeeping and electrical safety need to be considered for overall CIC sections.
2. There is no list available and the following devices such as AAS, flowmeter, pH meter, sensitive
balance, and automatic cyanide Titration device not calibrated.
3. Risk register is not updated for 2023.
4. CIC operating procedure at the point of use UMC-PD-QP-CIC – issue date 1/1/02020 - Issue/Rev.
02/00 must define all intersections with another department in the procedure, such as Metallurgy
and Chemical Lab and Crusher and Material Stores section.
5. The daily and monthly KPIs report is in place but not updated for the 2023 plan.
Page 2 of 2
QA PROCEDURES
.Doc. No UMC-QHSE-QA-AU/05
Issue/ Rev 02/00
AUDIT PROCEDURE
Date 01/03/2020
AUDIT REPORT
Detected Defect/s :
……………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………
Good orientation of CIC processes and good maintaining of the documented information in terms of
hard copies and soft copies.