s overall characteristics of compressive strength @28 Days measured in N/mm^2 when tested with

15cm × 15cm × 15cm Cube. So, fck value for C20 concrete is 20 MPa or 20 N/mm^2.

Grades of concrete are defined by its compressive strength and composition of the concrete- cement
water ratio, amount of Sand and aggregate, and the minimum strength the concrete should have
following 28 days of initial curing after construction.

C20, C25, C30, C35 and C40 is different grade of concrete having different Compressive strength.
Characteristics of compressive strength of concrete denoted by fck. Value of fck for C20 grade of
concrete is 20 MPa. Value of fck for C25 grade of concrete is 25 MPa. Value of fck for C30 grade of
concrete is 30 MPa. Value of fck for C40 grade of concrete is 40 MPa.

Concrete mix ratio is the proportion of components such as Cement, Sand, gravel and water in concrete
mix. Proportion of each components in concrete mix either mix by volume or by weight. Most common
concrete mix ratio by volume which are used for construction are 1:2:3, (1 cement: 2 Sand: 3 Gravel or
Stone). Taking water/ cement ratio about 0.60.

tructural construction elements like patio slabs and pathways.

C15 concrete mix ratio using ballast

Particular cement to ballast mix ratio to create C15 grade of concrete should be 1:8 (1 part of cement
mix to 8 parts of ballast. Ballast is premix of sharp sand and course gravel or aggregate.

C15 concrete or Gen 2 concrete can be used for house floors with no embedded metal, ideal material for
flooring, foundations for small walls, sheds & conservatories, Paving for steps and paths.

C20 concrete mix ratio using ballast

Particular cement to ballast mix ratio to create C20 grade of concrete should be 1:6 (1 part of cement
mix to 6 parts of ballast. Ballast is premix of sharp sand and course gravel or aggregate. This grade of
concrete is an ideal grade of concrete mostly used for domestic application such as foundation for
garden walls, paving, shed bases, garage bases, patio, path and extension.

C25 concrete mix ratio using ballast


Particular cement to ballast mix ratio to create C25 grade of concrete should be 1:5 (1 part of cement
mix to 5 parts of ballast. Ballast is premix of sharp sand and course gravel or aggregate. This grade of
concrete is commonly used for flooring, foundations, footings, and filling trenches.

C30 concrete mix ratio using ballast

Particular cement to ballast mix ratio to create C30 grade of concrete should be 1:4 (1 part of cement
mix to 4 parts of ballast. Ballast is premix of sharp sand and course gravel or aggregate. This concrete is
a common commercial concrete mix typically used for outdoor projects such as pavements.

C35 concrete mix ratio using ballast

Particular cement to ballast mix ratio to create C35 grade of concrete should be 1:3 (1 part of cement
mix to 3 parts of ballast. Ballast is premix of sharp sand and course gravel or aggregate. This grade of
concrete used for structural piling and creating external slabs and walls.

◆ What is the 10-20-30-40 rule in concrete mixing?

◆ How many concrete blocks are required for 1 cubic meter?

◆ How much does a ton of concrete cover

◆ How many concrete blocks per m2

◆ Time for concrete to cure | Curing time of concrete

Conclusion:

The common concrete mix ratio to create C20 grade of concrete is 1 : 1.81 : 3.68 : 0.51 (cement: Sand:
Stone: water) by weight. This means, 1m3 of C20 grade of concrete can be prepared by mixing of 1 part
of cement (343kg of cement) + 1.81 parts of Sand (621kg of Sand) + 3.68 parts of Stone (1261 kg gravel)
+ 0.51 parts of water (175kg of water).
More Important Posts:―

How to calculate load for beam per metre running length

1 Cubic meter River & M sand weight in kg & ton

What is the volume of a 25kg and bulk bag of ballast

How much area does a ton of sand cover

How many bags of concrete do I need for a 4×6 slab

Primary Sidebar

Categories

AAC block (19)

Asphalt (1)

beam (9)

board (2)

Brick (61)

Cement (105)

Cement test types (2)

Compressive strength (10)

Concrete (294)

deck (6)

door (1)

drywall (20)

feet (1)

flooring (17)

gallon (1)

garage (2)

garage door (2)

gravel (6)

joists (8)

Land measurement (20)

mulch (2)
Paint/ putty calculator (21)

plywood (3)

Rate Analysis for civil work (2)

RCC (176)

Road/ highway (13)

Roof slab (41)

sand (2)

siding (17)

soil (1)

Soil mechanic (10)

span (9)

stairs (1)

Tile (32)

Uncategorized (837)

wallpaper (5)

Weight of Steel (50)

सिविल नॉलेज इन हिंदी (21)

Recent Posts

रॉड वजन प्रति मीटर: 12mm, 10mm, 8mm, 16mm, 20mm और 25mm स्टील बार

स्टील बार का यूनिट वजन: (8 मिमी, 10 मिमी, 12 मिमी, 16 मिमी और 20 मिमी)

What is the rough opening for a 30″, 24″, 32″, 28″ & 36 inch pre-hung door

How many steps for an 8 foot rise

Popular Post

रॉड वजन प्रति मीटर: 12mm, 10mm, 8mm, 16mm, 20mm और 25mm स

In this article we know about what is the mix ratio for C20, C25, C30, C35 and C40 concrete by weight for
1 cubic meter. C40 grade of concrete is a high strength concrete mix suitable for commercial use, most
commonly used in the construction of structural and support beams, footings and foundations,
roadworks, and in agricultural use. It is Ideal for foundations, footing for septic tanks, paving HGV parks
and agricultural yards.

◆You Can Follow me on Facebook and

Subscribe our Youtube Channel

What is the mix ratio for C20 concrete

The common concrete mix ratio to create C20 grade of concrete is 1 : 1.81 : 3.68 : 0.51 (cement: Sand:
Stone: water) by weight. This means, 1m3 of C20 grade of concrete can be prepared by mixing of 1 part
of cement (343kg of cement) + 1.81 parts of Sand (621kg of Sand) + 3.68 parts of Stone (1261 kg gravel)
+ 0.51 parts of water (175kg of water).

Concrete grade C20 meaning

What Does C20 concrete meaning? C20 concrete grade means the concrete having minimum
compressive strength of 20 N/mm^2 at 28 days on cylinder test after the concrete has been poured. The
C stands for concrete, and the numerical figure indicates the strength of the concrete.

What is the mix ratio for C25 concrete

The common concrete mix ratio to create C25 grade of concrete is 1 : 1.40 : 2.85 : 0.47, (cement: Sand:
Stone: water) by weight. This means, 1m3 of C25 grade of concrete can be prepared by mixing of 1 part
of cement (415kg of cement) + 1.40 parts of Sand (583kg of Sand) + 2.85 parts of Stone (1184 kg gravel)
+ 0.47 parts of water (195kg of water).

Concrete grade C25 meaning

What Does C25 concrete meaning? C25 concrete grade means the concrete having minimum
compressive strength of 25 N/mm^2 at 28 days on cylinder test after the concrete has been poured. The
C stands for concrete, and the numerical figure indicates the strength of the concrete.

What is the mix ratio for C30 concrete


The common concrete mix ratio to create C30 grade of concrete is 1 : 1.18 : 2.63 : 0.41, (cement: Sand:
Stone: water) by weight. This means, 1m3 of C30 grade of concrete can be prepared by mixing of 1 part
of cement (459kg of cement) + 1.18 parts of Sand (542kg of Sand) + 2.63 parts of Stone (1206 kg gravel)
+ 0.41 parts of water (188kg of water).

Concrete grade C30 meaning

What Does C30 concrete meaning? C30 concrete grade means the concrete having minimum
compressive strength of 30 N/mm^2 at 28 days on cylinder test after the concrete has been poured. The
C stands for concrete, and the numerical figure indicates the strength of the concrete.

What is the mix ratio for C35 concrete

The common concrete mix ratio to create C35 grade of concrete is 1 : 1.37 : 2.78 : 0.46, (cement: Sand:
Stone: water) by weight. This means, 1m3 of C35 grade of concrete can be prepared by mixing of 1 part
of cement (424kg of cement) + 1.37 parts of Sand (581kg of Sand) + 2.78 parts of Stone (1179 kg gravel)
+ 0.46 parts of water (195kg of water). Must use 42.5 grade cement or above.

Concrete grade C35 meaning

What Does C35 concrete meaning? C35 concrete grade means the concrete having minimum
compressive strength of 35 N/mm^2 at 28 days on cylinder test after the concrete has been poured. The
C stands for concrete, and the numerical figure indicates the strength of the concrete.

What is the mix ratio for C40 concrete

The common concrete mix ratio to create C40 grade of concrete is 1 : 1.08 : 2.41 : 0.40, (cement: Sand:
Stone: water) by weight. This means, 1m3 of C40 grade of concrete can be prepared by mixing of 1 part
of cement (488kg of cement) + 1.08 parts of Sand (528kg of Sand) + 2.41 parts of Stone (1176 kg gravel)
+ 0.40 parts of water (195kg of water). Must use 42.5 grade cement or above.

Concrete grade C40 meaning

What Does C40 concrete meaning? C40 concrete grade means the concrete having minimum
compressive strength of 40 N/mm^2 at 28 days on cylinder test after the concrete has been poured. The
C stands for concrete, and the numerical figure indicates the strength of the concrete.

concrete mix ratio using ballast C10, C15, C20, C25, C30, C35

concrete mix ratio using ballast C10, C15, C20, C25, C30, C35
C10 concrete mix ratio using ballast

Particular cement to ballast mix ratio to create C10 grade of concrete should be 1:10 (1 part of cement
mix to 10 parts of ballast. Ballast is premix of sharp sand and course gravel or aggregate. C10 is low
strength concrete grade particularly used for non-s

You might also like