The document outlines a checklist for reviewing final relay settings at a substation, which includes verifying that the applied settings match the approved final settings, highlighting any discrepancies, and ensuring the settings documentation is properly signed and dated by both the contractor and utility engineers.
The document outlines a checklist for reviewing final relay settings at a substation, which includes verifying that the applied settings match the approved final settings, highlighting any discrepancies, and ensuring the settings documentation is properly signed and dated by both the contractor and utility engineers.
The document outlines a checklist for reviewing final relay settings at a substation, which includes verifying that the applied settings match the approved final settings, highlighting any discrepancies, and ensuring the settings documentation is properly signed and dated by both the contractor and utility engineers.
CL-NG-6460-002-115 Check List of Final Settings Review Page Number: Revision Number: 1 of 3 00
1.0 Equipment General Data and Information
Substation Bay/Panel 2.0Equipment Serial No Final Setting Review Check List
Item Description Done Remarks
Check that Relays’ configurations are stamped by 1. manufacturers. In case of modifying an existing circuit, check the final 2. settings of the existing relays are reviewed. Download and print the settings directly from the relay or 3. Engineering Work Station (as applicable). Check that printout includes the relay settings and configurations.
4. Compare thoroughly the printout with the following:
4.1 The approved final settings which received from the
5. Highlight using a yellow highlighter each and every
checked setting.
6. Correct immediately any discrepancies between the
applied settings and approved final settings. If any modifications are required in the approved final 7. settings, it should be modified using a red pen. Check full name and signature of both, CSD engineer and Contractor testing engineer are clearly indicated using a 8. blue pen on the first page of the printout as well as on the cover letter of the approved final settings (initials and/or abbreviations are not acceptable). Check the revision date is indicated on the first page of 9. both documents. 10. Check the remaining pages of approved relay settings and printout are initiated by both, CSD engineer and Archiving System Website: http://AMAS NATIONAL GRID
Title: Index Number:
CL-NG-6460-002-115 Check List of Final Settings Review Page Number: Page Number: 2 of 3 00
Contractor testing engineer.
11. Check the revision date is similar to the printout date.
CSD Contractor T&C Contractor
Name
Signature