Dik
L-AC : 55 Meter PERJANJIAN :
L-BC : 12 Meter
L-AB/BA : 67 Meter
P : 10 Ton
P= 20
A B
C
55 12
67
Dit
Jawab : H-A 0
A
C
V-A
∑ M-A = 0
( V-A x 0 ) + P x
( V-A x 0) + 10 x
+ 550
550
Kontrol
- Syarat Kesetimbangan Gaya Vertikal
∑ V = 0
V-A - P + V-B = 0
1.791 - 10 + 8.208955 = 0
0 = 0
Untuk Trigonometri
0.707107
0.866025
8.208955
L-BC + V-B x 0 = 0
12 + V-B x 0 = 0
120 + 0 = 0
= 120
= (30 Tm
)/(5 )
m
= 1.791045 Ton Asumsi Benar
OK
LATIHAN SOAL ANALISA STRUKTUR I
CLAUDIUS LIPPERSHEY BRIGHT CALING, S.T.,M.T.
Dik
L-AC : 55 Meter PERJANJIAN :
L-BC : 15 Meter
L-AB/BA : 70 Meter
P : 40 Ton
P= 20
A B
C
55 15
70
Dit
Jawab : H-A 0
A
C
V-A
∑ M-A = 0
( V-A x 0 ) + P x
( V-A x 0) + 40 x
+ 2200
2200
Kontrol
- Syarat Kesetimbangan Gaya Vertikal
∑ V = 0
V-A - P + V-B = 0
8.5714 - 40 + 31.42857 = 0
0 = 0
Untuk Trigonometri
0.984808
0.866025
31.42857
L-BC + V-B x 0 = 0
15 + V-B x 0 = 0
600 + 0 = 0
= 600
= (30 Tm
)/(5 )
m
= 8.571429 Ton Asumsi Benar
OK