You are on page 1of 7

pad footing 400 x 400 x200 stump 200 x 200 x 1000 beam

besi y10 y10 r6 y10


m 3.6 m 9.6 7.7 m 4.4
rm/m 4 4 2 4
14.4 38.4 15.4 17.6
concrete concrete concrete
m3 0.032 0.088 0.06
rm/m3 250 250 250
8 22 15

form work
rm 20 20 30

excavation
rm 30

Total cost 72.4 95.8 84.6


1303.2 1724.4 3891.6

8586.45
17172.9
Slab Floor slab
r6 y10
11 m 184 Concrete
2 4 m3 135
22 736 Rm/m3 250
concrete 33750
1.725
250 BRC 66 CQ 2mx25m coil
431.25 m2 1765
rm/m2 4
7060
500

40810

1667.25
Q 2mx25m coil
Total Transaction 18634.30
24/8/22 Amount To ACC
1) belik kabel rm1732.5 1732.50 Abg wa
2) advnce mie rm200 200.00 Abg Mie
3) advance nazir rm200 200.00 Abg J

2/10/2022
1) trunking rm111.50 111.50 abg wa

6/10/2022
1) advance nazir rm100 100.00 Abg J
2) advance lemi rm100 100.00 Abg Mie
3) blnja mkn pg rm100 100.00 Abg Mie
4) pd kb bil 1108 rm314.50 314.50 PD KB Electrical
5) yatim rm35 35.00 Abg Wa

10/10/2022
1) rashid bil 8488 rm1740 1740.00 Abg wa

12/10/2022
1) wailet c03039068 rm810 810.00 Abg Wa

12/10/2022
1) tiga r dfb rm2200 2200.00 Cik Farah Syazana

13/10/2022

1)PD KB 11093 RM387.60 387.60 PD KB Electrical


2)advnce nazir rm100 100.00 Abg J
3) advance lemi rm100 100.00 Abg Mie

16/10/2022
1)wailite c02024501 rm1919.6 1919.60 Wailite Electrical
2) bil 38408 rm28
3) yatim kbcs01598 rm25 103.00 Abg J
4) minyak rm50

18/10/22
1)wailite c02045054 rm2030 2030.00 Wailite Electrical

27/10/22
1)pd kb 11310 rm1120 1120.00 PD KB Electrical
2)advance lemi rm150 150.00 Abg Mie
3)advance naIr rm150 150.00 Abg J
4) duit minyak rm50 50.00 Abg Mie

10/11/2022
1)advance lemi rm100 100.00 Abg Mie
2)advance nazir rm100 100.00 Abg J

12/11/2022
1) yatim KBCS 01829 rm200 advance brg lebih
duit ade rekod pd resit 200.00 Abg Mie

16/11/22
1) trunking rm100. Lebih duit ade pd resit no transaction

17/11/22
1) wailet c02045522 rm647
2) lee poh POS1 055885 rm180 1170.00 Abg Wa
3) tan elektrik POS047904 rm243
4)advance lemi rm150 150.00 Abg Mie
5)advance nzir rm150 150.00 Abg J

21/11/22
1) belanja rm100 100.00 Abg Mie

23/11/22
1) pd kb 11324 rm297.70 297.70 PD KB electrical

24/11/22
1) wailet co3040383 rm330.20
2) wailet c0304292 rm339 1044.20 Abg Wa
3) lee poh iv11680 rm375
4) advance nazir rm150 150.00 Abg J
5) advance lemi rm150 150.00 Abg Mie

2/12/2022
1) advance nazir rm150 150.00 Abg J
2) advance lemi rm150 150.00 Abg Mie

15/12/22
1)wailate c03040595 rm136 511.00 Abg Wa
2) lee poh xv-11722 rm375

15/12/22
1) pd 11331 rm157.70 157.70 PD KB Electrical
2) advance nazir rm150 150.00 Abg J
3) advance lemi rm150 150.00 Abg Mie
pad footing 400 x 400 x200 stump 200 x 200 x 1000
besi y10 y10 r6
m 3.6 m 4.8 7
rm/m 4 4 2
14.4 19.2 14
kg 2.2176 454.608 2.9568 606.144 1.554 318.57
concrete concrete
m3 0.032 6.56 0.04 8.2
rm/m3 250 250
8 10

form work
rm 20 0.032 6.56 20 0.04 8.2

excavation
rm 30

Total cost 72.4 63.2 135.6


27798

Slab 17650
Concrete 14.76 738
Formwork 42.36 4236
Besi 773.178 7731.78
BRC 1765 8825
39180.78
Floor slab

Concrete
m3 135
Rm/m3 250

33750

BRC 66 CQ 2mx25m coil


m2 1765
rm/m2 4
7060

27.6
40810

271.2