Item No Hight Dia.

bar No bar Length Total L= Stirrup L


9 3.1 10 4 4 16 0.7
Column
1 4 12 4 4.5 18 0.7

Beem on Axis No Length Dia. bar No bar Length Total L= Stirrup L


1&2 2 12 10 4 12.3 49.2 0.7
3 1 6 10 4 6.3 25.2 1.7
A&B 2 11.5 10 4 11.8 47.2 2.7
C 1 6.5 10 4 6.8 27.2 3.7
Stirrup No
16.5
21

Stirrup No
61
31
58.5
33.5
Opening
Wall
Door Window Open Wall area plastering
Room name Hight Area perimeter (L*W) (L*W) (L*W) m2 m2
Living Room & Dining room 3.10 39 24.3 7.44 3.72 75.33 64.17
kichen 3.10 16.5 10 1.4 31 29.6
Corridor 3.10 5.6 16.6 2.79 51.46 48.67
M bed room 3.10 15.24 16.1 2.79 2 49.91 43.32
1.8
M bath 3.10 3.06 7 2.48 0.875 21.7 18.345
C bed room 3.10 8.6 11.7 2.79 1.85 36.27 31.63
Bath 3.10 3.2 7.2 2.48 0.825 22.32 19.015
Verendaha 3.10 14.35 10.5 2.79 32.45 100.595
TOTAL 106 287.99 355.345

32.42
Opening
ROOM name Door (L*W) Window (L*W)
Wood Metal Metal
Living Room & Dining room 2.7*3.1
kichen 1.2*1.5
Corridor 0.9*3.1
M bed room 0.9*3.1 1.2*1.5
C bed room 0.9*3.1 1.2*1.5
Bath 0.8*3.1 0.6*0.8
Balance ወጭ ቀሪ Construction pay
BOA 600000 90000 510000 20000
Awashw 156000 118000 38000 41460

ጠቅላላ ወጭ 208000

construction 145135
home 33750
on my hand 24000

sum 5115
home pay
dave /mebrat/ 2000
beza 5000
tg 5000
betty 15000
dave 2 2000
full (v) 1250
full + Survic (M) 3500

33750
አይነት ብዛት የአንዱ ዋጋ ጠቅላላ ዋጋ

የውጭ በር 1 22000 22000


እንጨት ለስቶር 3080
ምሰማር/ሽቦ 2 /1 800
ቆርቆሮ ለስቶር 18 395 7335
ሽቦ 5 192 960
ባለ 6 61 ኪግ 140 8540
ብረት ባለ 10 48 790 37920
ባለ 12 3 1180 3540
ሰራተ 2000
ገረጋንቲ 1 6000 6000
ድንጋይ 2 7000 14000
አሽዋ 1 25000 25000
ምሰማር/ሲባጎ 2 /6 190 / 60 660
እንጨት /ቅየሳ / 2100

ውሃ 1 1000 1000
ጀሪካን 1 200 200
zerihun le worker 10000

145135