Stirrup No
61
31
58.5
33.5
Opening
Wall
Door Window Open Wall area plastering
Room name Hight Area perimeter (L*W) (L*W) (L*W) m2 m2
Living Room & Dining room 3.10 39 24.3 7.44 3.72 75.33 64.17
kichen 3.10 16.5 10 1.4 31 29.6
Corridor 3.10 5.6 16.6 2.79 51.46 48.67
M bed room 3.10 15.24 16.1 2.79 2 49.91 43.32
1.8
M bath 3.10 3.06 7 2.48 0.875 21.7 18.345
C bed room 3.10 8.6 11.7 2.79 1.85 36.27 31.63
Bath 3.10 3.2 7.2 2.48 0.825 22.32 19.015
Verendaha 3.10 14.35 10.5 2.79 32.45 100.595
TOTAL 106 287.99 355.345
32.42
Opening
ROOM name Door (L*W) Window (L*W)
Wood Metal Metal
Living Room & Dining room 2.7*3.1
kichen 1.2*1.5
Corridor 0.9*3.1
M bed room 0.9*3.1 1.2*1.5
C bed room 0.9*3.1 1.2*1.5
Bath 0.8*3.1 0.6*0.8
Balance ወጭ ቀሪ Construction pay
BOA 600000 90000 510000 20000
Awashw 156000 118000 38000 41460
ጠቅላላ ወጭ 208000
construction 145135
home 33750
on my hand 24000
sum 5115
home pay
dave /mebrat/ 2000
beza 5000
tg 5000
betty 15000
dave 2 2000
full (v) 1250
full + Survic (M) 3500
33750
አይነት ብዛት የአንዱ ዋጋ ጠቅላላ ዋጋ
ውሃ 1 1000 1000
ጀሪካን 1 200 200
zerihun le worker 10000
145135