Professional Documents
Culture Documents
Mr.C.R.Ravi
GM – Mettalurgy
The current production of Hutti Gold mine is around 2.500 tonnes of gold
The current gold ore extraction of hutti mines is around 6 lakh tonne per
annum
The grade of gold produced is around 5.7 (Gold metal / tonne of ore)
Hutti Gold mines limited is the only gold ore extraction mine in the country
Sampling equipments:
Automatic riffle samplers are used in three places namely
1. Sag mill discharge
2. Classifier (Hydro cyclone) (Gold content feeded into loading circuit)
3. Tailing
Generally the sample is collected for every 20 min
In 2000 tonnes of ore, a sample of 150 kg is taken for analysis
Sample preparation:
Crushing unit:
Ore is brought in to the crushing circuit through surface ore-bin of about 200 tonnes
capacity equipped with chain feeder and inclined conveyor belt
ROM is crushed to -10 mm size in three stages.
In the first stage there are 3 Kue Ken Jaw crushers, which act as primary
crusher
In the second stage 2 Nos. of 3' standard symon cone crusher act as
secondary crusher
In the tertiary stage, there are 2 nos. of 3' short head and 2 nos. of 4' short
head symon cone crushers.
These crushers are in close circuit with vibrating screen. Crushed product is
stored in a fine ore bin of 1500 tons capacity before feeding to grinding plant.
Grinding & Milling unit:
The milling/Grinding process of gold ore in Hutti employs two distinct grinding
techniques.
In the first technique grinding is done in two stages
One pulveriser and 3 secondary tube mills constitute one stream of grinding.
Life of equipments:
The average life of sample preparation equipments like jaw crusher, pulverizer, ball
mills varies between 5-7 years
The respondent is on the netural node with respect to the feedback about FLSmidth
products