AKRON RISK ASSESSMENT R/A NO : 301

TYPE OF ACTIVITY: ROUTINE / NON- DESCRIPTION OF ACTIVITY : SHIP TO SHIP OPERATION


ROUTINE

RISK ASSESSMENT GUIDE : RISK MUST BE REDUCED TO AS LOW AS REASONABLY PRACTICABLE (ALARP)
STEP 1 : CONSIDER SEVERITY OF HARM (S) STEP 2 : CONSIDER LIKELIHOOD (L) STEP 3:CALCULATE RISK
1: NEGLIGIBLE: Near Miss or Simple First Aid/ Simple Repairs by ship staff/ Spill within spill trays 1: IMPROBABLE-Event not expected to occur RISK RATING RR = S x L
2: MINOR : Injury require Medical Treatment; MTC/ Repair need external assistance / Spill on deck < 1 m3 2 : RARE: Expected to occur in exceptional situations RR RISK CATEGORY
MODERATE: Serious injury or multiple minor injuries; LTI / Repairs affecting seaworthiness of ship leading to CoC / Spill on
3: 3: POSSIBLE: May occur at some time / occurred in the past
deck > 1 m3 1- 5 L - LOW
CRITICAL : Single fatality, Serious injuries, permanent disability / Requires lay up repairs or extensive drydockings, 3rd party
4: 4: LIKELY : Possibility of occurrence of isolated incidents
claims/ Spill overboard < 100L 6 - 10 M - MEDIUM
CATASTROPHIC : Mutiple Fatalaities or Long Term disabilities/ Total Loss of ship or immediate layup/dry-docking for major
5: 5: CERTAIN: Is expected to occur in most situations
repairs / Major overboard spill > 100 L 11 - 25 H - HIGH

NO HAZARD DESCRIPTION RISK EXISTING CONTROLS RISK RATING RISK ADDITIONAL CONTROLS RESIDUAL RISK RESI-
(WITH CONTROLS IN CATEG (IF NOT REQUIRED, WRITE "N". RATING DUAL
PLACE) IF REQUIRED, LIST OUT THE ADDITIONAL (WITH ADDIT'L
L/M/H RISK
CONTROLS ) CONTROLS)
CAT.
( S x L= RR) (S x L = RR) L/M/H
S L RR S L RR
1. Collision between mother/daughter Fatality, Injury, 3 1 3 L N
vessels. Damage to vessel 1. Agree approaching procedures with the other
vessel / mooring master / pilots and monitor
implementation. Abort / suspend manoeuvring
operation if deviation from what has been agreed is
observed or if in doubt or if conditions have changed.
2. Confirmation should be sought that the number,
size and age of the fenders are suitable for the
operation taking into account the size of the ships
involved and STS Transfer Guide/section 9.1.2 and
9.1.3 recommendations.
3. Check / inspect the proper condition of the
fenders. Confirm that secondary fenders are
available.
4. Communicate details of the agreed mooring plan
to the ship’s officers and crew during a safety

FORM NO: S-20 / REV. 0 / 01 MAR 2010 Page 1 / 8 R/A NO :301


NO HAZARD DESCRIPTION RISK EXISTING CONTROLS RISK RATING RISK ADDITIONAL CONTROLS RESIDUAL RISK RESI-
(WITH CONTROLS IN CATEG (IF NOT REQUIRED, WRITE "N". RATING DUAL
PLACE) IF REQUIRED, LIST OUT THE ADDITIONAL (WITH ADDIT'L
L/M/H RISK
CONTROLS ) CONTROLS)
CAT.
( S x L= RR) (S x L = RR) L/M/H
S L RR S L RR

5. Maintain continuous communication with the other


vessel during approaching / mooring manoeuvring.
6. Confirm that a SECURITE message has been
issued to all vessels in the area for the forthcoming
lightering operation.
7. Confirm that the AIS has been set to indicate STS
operation / restricted manoeuvrability.
8. The main engine cylinder “cut-out” system to be
used, as necessary (if such a system is available on
board).
2. Grounding/contact with uncharted Fatality, Injury, 1. Confirm that the STS transfer area is free from 4 1 4 L N
navigation hazards. Damage to vessel navigation hazards. Agree manoeuvring area and
monitor closely ship’s track during operations to
ensure that always navigating within the agreed safe
area.
2. Mark properly NO-GO areas on charts highlighting
restricted / dangerous waters that the ship must
remain clear off.
3. When STS transfer is en route ensure with Person
in Charge of the operation (Pilot / mooring master)
that the intended route maintains the vessel always in
safe waters.
4. Taking into account any nearby navigation
hazards as well as the prevailing weather / sea
conditions in the STS area, a frequent ship position
fixing should be implemented – at least every 30
minutes.
5. Verify that: (a) navigational charts are fully
updated up to the latest Notice to Mariners and that
navigational warnings are available on board; (b)
during STS, that navigational warnings are
continuously received by EGC receiver and that
charts as well as all deck officers are fully updated /
informed.

FORM NO: S-20 / REV. 0 / 01 MAR 2010 Page 2 / 8 R/A NO :301


NO HAZARD DESCRIPTION RISK EXISTING CONTROLS RISK RATING RISK ADDITIONAL CONTROLS RESIDUAL RISK RESI-
(WITH CONTROLS IN CATEG (IF NOT REQUIRED, WRITE "N". RATING DUAL
PLACE) IF REQUIRED, LIST OUT THE ADDITIONAL (WITH ADDIT'L
L/M/H RISK
CONTROLS ) CONTROLS)
CAT.
( S x L= RR) (S x L = RR) L/M/H
S L RR S L RR
3. Incompatibility between Injury, Damage to 1. Request advanced information relating to the 3 1 3 L N
mother/daughter vessels. vessel overall dimensions, freeboard, position of manifolds,
mooring points and fenders of the other ship at the
earliest opportunity. The Company should be
contacted in case any of the submitted information
raises a point of concern.
4. Inadequate operation Fatality, Injury, 1. In addition to having carefully completed and 4 1 4 L N
planning/monitoring. Damage to vessel exchanged information with the other vessel as per
STS Transfer Guide Checklists no.2,3,4 and 5 it
should be ensured that any other information related
to the operation has been promptly communicated,
as necessary, and utilised in the safe planning /
conduct of the operation.
2. An STS contingency plan should be prepared and
agreed by involved parties.
5. Inadequate personnel competence. Injury, Damage to 1. Details of all stages of the STS operation, 2 2 4 L N
vessel including normal and emergency procedures, should
be presented and analysed to the ship’s crew prior to
the operation during a safety meeting.
2. An STS Emergency Drill should be carried out.
3. Competency experience of the STS organiser and
person in charge to be requested / reviewed in case
the Company has no previous experience with the
particular organisers.
6. Inadequate / Substandard hose Pollution, Fire 1. A visual inspection of the transfer hose 4 1 4 L N
condition. assemblies should be carried out before they are
connected to the manifolds to determine if any
damage has been caused when taking them on
board.
2. Check that the MAWP and date of last annual
pressure test is marked on the hose(s).
7. STS mooring equipment / gear failure. Collision,Pollution, 1. While vessel is moored, the condition of the 4 1 4 L N
Fire mooring wires / tails should be frequently checked.
2. All the SMS-required deck/cargo pre-arrival
checks should be carried out.
FORM NO: S-20 / REV. 0 / 01 MAR 2010 Page 3 / 8 R/A NO :301
NO HAZARD DESCRIPTION RISK EXISTING CONTROLS RISK RATING RISK ADDITIONAL CONTROLS RESIDUAL RISK RESI-
(WITH CONTROLS IN CATEG (IF NOT REQUIRED, WRITE "N". RATING DUAL
PLACE) IF REQUIRED, LIST OUT THE ADDITIONAL (WITH ADDIT'L
L/M/H RISK
CONTROLS ) CONTROLS)
CAT.
( S x L= RR) (S x L = RR) L/M/H
S L RR S L RR
8. Crew fatigue. Accidents, serious 3 1 3 L N
injury 1. Work activities onboard prior to arriving to the STS
area should be so planned so that adequate period of
rest to have been provided to the involved crew.
2. During the STS operation, the crew watches
should be arranged taking into consideration the
planned density of the lightering operations.
9. Communication failure. Accidents, Injury 1. Back up VHF radios/frequencies and emergency 4 1 4 L 1.Secondary means of
communication means (i.e. whistle) for the entire communication to be checked
period of the operation should be agreed with the frequently for operation.
Mooring Master. Refer to STS Transfer Guide section
4.8.
10. Anchor dragging. Collision,Pollution, 3 1 3 L N
Fire 1. During the entire STS operation either at anchor
or adrift the bridge must always be manned and
position fixing should be carried at frequent intervals.
11. Adverse weather and sea conditions. Pollution, breaking The Master and loading Master should mutually
1. 5 2 10 M 1.Adverse weather development to 5 1 5 L
away, Fire, Injury agree that the prevailing weather condition in general be brought to Ch Officer's and
is favourable to perform the operation. master's notice immediately.
2. The Master should ensure that weather reports 2.Masters of both the vessel to
are frequently updated and discussed with the consult and decision tanken in
mooring Master. unison. If no agreement master to
3. Berthing / unberthing should be carried out during ake decision and inform the other
daylight and with visibility acceptable by all involved ship master of his decision and call
parties. for stations.
4.Master's over riding authority empowers master to
take action to safegaurd lives,ship and cargo. If in
doubt call DPA for advise.
5.Ref COM section 4, ISGOTT, Cargo Plan CGO-
006.
12. Steering or power failure. Collision,Pollution, 1. Any berthing / unberthing operation should be 2 2 4 L N
Fire aborted in case of steering or main engine power
failure.
2. Pre-arrival tests of steering gear and Main engine
should be carried out prior to the operation.

FORM NO: S-20 / REV. 0 / 01 MAR 2010 Page 4 / 8 R/A NO :301


NO HAZARD DESCRIPTION RISK EXISTING CONTROLS RISK RATING RISK ADDITIONAL CONTROLS RESIDUAL RISK RESI-
(WITH CONTROLS IN CATEG (IF NOT REQUIRED, WRITE "N". RATING DUAL
PLACE) IF REQUIRED, LIST OUT THE ADDITIONAL (WITH ADDIT'L
L/M/H RISK
CONTROLS ) CONTROLS)
CAT.
( S x L= RR) (S x L = RR) L/M/H
S L RR S L RR
3. Both steering motors should be running prior to
and during STS mooring.

FORM NO: S-20 / REV. 0 / 01 MAR 2010 Page 5 / 8 R/A NO :301


NO HAZARD DESCRIPTION RISK EXISTING CONTROLS RISK RATING RISK ADDITIONAL CONTROLS RESIDUAL RISK RESI-
(WITH CONTROLS IN CATEG (IF NOT REQUIRED, WRITE "N". RATING DUAL
PLACE) IF REQUIRED, LIST OUT THE ADDITIONAL (WITH ADDIT'L
L/M/H RISK
CONTROLS ) CONTROLS)
CAT.
( S x L= RR) (S x L = RR) L/M/H
S L RR S L RR
13. Ignition hazard through induced arcing. Explosion, Fire, 1. Ensure implementation of the relevant measures 4 1 4 L N
Burn Injury to eliminate electrostatic standards as per STS
Transfer Guide paragraph 3.5.4.
2. 10cm Radars and MF/HF radio should be
switched off.
14 Personnel transfer. Accidents, serious 1. A personnel transfer basket for transferring 3 1 3 L N
injury personnel should be used provided that the crane is
not used to support the cargo hoses. Only type
approved transfer baskets must be used.
2. Personnel Transfer “by basket” should be carried
out in accordance with the SMS relevant
requirements.
15 Exposure to toxic vapours (e.g. H2S). Accidents, serious 1. The additional safety procedures, set out in SMS, 4 1 4 L N
injury, Fatality for handling cargoes with high concentrations of H2S
should be implemented, as appropriate. The
associated hazards and the required control
measures should be discussed with the involved
crew during a safety meeting.
16 Excessive hull stresses. Damage to hull 1. Operations planning should endure stresses well 2 2 4 L N
within acceptable SEAGOING limits.
2. Loadicator must be set at SEAGOING limits at all
times throughout the STS operation.
17 Injury due to 3 1 3 L N
Inability to operate mooring equipment inaction, Damage 1. Ensure availability at mooring stations long handle
and release ship in an emergency case. to hull fire axes or other suitable cutting equipment.

FORM NO: S-20 / REV. 0 / 01 MAR 2010 Page 6 / 8 R/A NO :301


NO HAZARD DESCRIPTION RISK EXISTING CONTROLS RISK RATING RISK ADDITIONAL CONTROLS RESIDUAL RISK RESI-
(WITH CONTROLS IN CATEG (IF NOT REQUIRED, WRITE "N". RATING DUAL
PLACE) IF REQUIRED, LIST OUT THE ADDITIONAL (WITH ADDIT'L
L/M/H RISK
CONTROLS ) CONTROLS)
CAT.
( S x L= RR) (S x L = RR) L/M/H
S L RR S L RR
During Cargo Operation
1. Inadequate cargo planning to carry out Cargo 1. Sufficient information regarding the cargo has been 4 2 8 M 1.If in doubt consult office/agents for 4 1 4 L
safe discharging operation. Incompatibilty with received in voyage orders. Refer to Cargo operation more information about cargo.
tank coating, manual section 4, tank cleaning guide, tanker safety
Claims, accidents. guide, MSDS for information
2. All officers and crew to participate in the Pre - 2. All informations and data to be
discharging Operations Meetings. Cargo plan CGO - discussed in meeting.
006 to be discussed in detail.
2 Lack of Ship/Shore cooperation at Spill, Overflow, 1. STS mooring & cargo operations checklist D - 10 4 2 8 M 1. Secondary means of 4 1 4 L
commencement and during operation fire. to be filled, agreed, signed and complied with prior communication to be monitored and
and during operation verified.
2. Working communication channel to be monitored 2. Close co operation to be ensured
and verified regularly. between the two ships.
3 Leakage in line, wrong tank filled, tank Spill, Overflow, 1.Cargo loading plan discussed and adhered to 4 2 8 M 1. Sufficient hands to be on deck at 4 1 4 L
atmosphere overpressurised. explosion, Claims always. Any deviation from plan to be briefed by ch the time of commencement of cargo
off. duties assigned to them.
2. Valves to be checked by two responsible persons 2.Ch Off to check line up before
independently before commencement of loading. commencement.All cargo pipelines,
tanks, pumprooms to be monitored
3. Continuous monitoring of conditions as per COM more frequently.
section 4.
4 Tank not in use overflow due to wrong Pollution, 1 Continuous monitoring of the tank level as per 4 2 8 M 1.Duty officer to be alert. 4 1 4 L
valve operative or valve malfunction. overflow. COM section 4. Situational awareness of DO to be 2.Compare ullages of tanks with
high( eg : tanks running) previous hour ullages.
2.Passive tanks(non operating Tank) valve to be 3. Compare ship figure to shore
visibly identified and tagged out. figure hourly. Any discrepancy
recheck and account for.
5 Pumproom flooding, trip and fall during Pollution, Toxic 1. Pumpman to be present in pumproom when 4 2 8 M 1. Cargo operation to be stopped 4 1 4 L
pumproom round fumes, Pumps pumps are started. He should monitor the pumps till from emergency stop if leakage
inoperational, all pumps have started and are running full rate. found in pumproom.
Fatality Frequent pumproom rounds to ensure satisfactory 2.Check atmosphere for gases prior
function of the pump. entry.
2. Frequent pumproom rounds to be ensured 3.Check the pump casing and
bearings for signs of overheating.

FORM NO: S-20 / REV. 0 / 01 MAR 2010 Page 7 / 8 R/A NO :301


NO HAZARD DESCRIPTION RISK EXISTING CONTROLS RISK RATING RISK ADDITIONAL CONTROLS RESIDUAL RISK RESI-
(WITH CONTROLS IN CATEG (IF NOT REQUIRED, WRITE "N". RATING DUAL
PLACE) IF REQUIRED, LIST OUT THE ADDITIONAL (WITH ADDIT'L
L/M/H RISK
CONTROLS ) CONTROLS)
CAT.
( S x L= RR) (S x L = RR) L/M/H
S L RR S L RR
6 High oxygen concentration in cargo Explosion, Fire, 1. Closely monitor the oxygen concentration in the 4 1 4 L N
tanks. Burn Injury tanks so that it remains less than 8% v/v. Operate IG
if it is required as per regulations.
7 Overflow of ballast tanks during Pollution, overflow 1.Ref COM section 4, ISGOTT, Cargo Plan CGO- 4 2 8 M 1.Only one tank to be topped up at a 4 1 4 L
operation. Oil stains on deck getting of ballast water 006, STS mooring & cargo operations checklist. time. Sufficient space available in
washed to sea due to ballast water 2. Continuously monitor the level of ballast tanks. No other tanks. Identify a crash tank for
overflow ballast water should overflow and go into water emergency.
directly.
3. Keep the deck and drip trays free of oil. 2. Ch off to take over from DO beore
topping up is commenced.
8 Cargo hoses breaking away due to Pollution, heavy 1. Ensure frequent rounds. Follow procedures laid out 5 2 10 M 1. Fwd and aft springs to be tended 5 1 5 L
mooring failure. fine, Fire. in TOM. 2. with care and slowly to avoid
Moorings to be regularly tended to. Excessive movement.
movements during mooring tending should be 2. Marking of the hose center with
avoided. Sufficient hands to be present to tend the flag or other means to be done for
moorings. easy reference of duty watchkeeper.

Final Asesssment : Provided no deviations from the recommended control measures, the residual risk assessed is As Low As Resonably Practicable (ALARP).
Supplementary measures include correct use of PPE & Tool Box talks that ensure all workers are fully aware of the control measures.

Residual risk - HIGH : If RR is "High" category, written instructions for conducting the job and approval shall be obtained from the shore office to commence the operation.
Residual risk - MEDIUM: If RR is "Medium" , a constant monitoring of events shall be maintained and ensure all identified preventative and mitigating measures are always in place.

PREPARED BY: OPERATION DEPT , S & Q DEPT. APPROVED BY: S & Q MANAGER
01 03 2010

FORM NO: S-20 / REV. 0 / 01 MAR 2010 Page 8 / 8 R/A NO :301