Professional Documents
Culture Documents
FOR APPROVAL
APPROVED
APPROVED WITH COMMENTS
NOT APPROVED (Re-Submit)
REVIEWED
REVIEWED WITH COMMENTS
NOT BE RETURNED
RETURN DATE 08/05/2017
AKK SAK
PROJECT ORIGINATOR
RECEIVED DATE
DATE
REV ISSUE PURPOSE PREPARED CHECKED APPROVED AUTHORISED
ISSUED
N11 1
3 3
3
3
LL3 LL4
N2
3 2
N6 3
3 MIDDLE SHELL
3 NOZZLE ORIENTATION PLAN
ENGINEERED AND MANUFACTURED BY
NP N4
Hinjewadi, Pune - 411 057. (INDIA)
www.praj.net
EL1 EL2
PROJECT NO. W-16003 EQPT. I.D. NO. E-7507
SHELL TUBE/JACKET
DESIGN PRESSURE -- -- bar (g)
DESIGN TEMP. -- -- °C
YEAR BUILT --
3
N3
TR3 TR4
NOZZLE SCHEDULE
NOZZLE SIZE SCH./ ASME B16.5 PROJ. NOZZ. R/F.PAD
NO. NPS THK.(mm) FROM CL LOCATION OD x THK. SERVICE REMARK
TYPE (FACING) RATING
2
2
3 2
MATERIAL OF CONSTRUCTION
COMPONENTS MATERIALS 2 2
SHELL SIDE TUBE SIDE
3 3
3 3
3
TR1 TR2
N7
3 N8 N9
TOP BONNET
SG 3 NOZZLE ORIENTATION PLAN
N5
LL2 LL1
TOLERANCE 2
N1
3
LEGEND 2
N10
2 ELEVATION
3 TUBESHEET LAYOUT