You are on page 1of 2

Chambal Fertilisers and Chemicals Limited

OFFSITE AND UTILITIES FOR CFG3 PLANTS (G3OU)

Project Doc. No.: VD-75-MCP-DWG-AXEH301-023


Toyo Work No: 6340 CLASS AREA DIS TYP Req No SEQ SHEET REV Security Level 2
P.O No: P/6340/13422/AXEH301 VD 75 MCP DWG AXEH301 023 1 3 Page 1 of 2
Vendor Doc. No.: W-16003-1-GAD 9405 Date: 03 May 2017

Chambal Fertilisers and Chemicals Limited

OFFSITE AND UTILITIES FOR CFG3 PLANTS (G3OU)

GA DRAWING FOR FORCED CIRCULATION EVAPORATOR


FOR EFFECT-5 OF ZLD PLANT

FOR APPROVAL
APPROVED
APPROVED WITH COMMENTS
NOT APPROVED (Re-Submit)
REVIEWED
REVIEWED WITH COMMENTS
NOT BE RETURNED
RETURN DATE 08/05/2017
AKK SAK
PROJECT ORIGINATOR
RECEIVED DATE

System No. Equipment No. FWBS/AWBS


PU-7500 E-7511

3 May 2, 2017 FOR APPROVAL SSK HRD RD

2 Mar 22, 2017 FOR APPROVAL SSK HRD SM

1 Jan 24, 2017 FOR APPROVAL DGL HRD SM

0 Dec 29, 2016 FOR APPROVAL SSK HRD SM

DATE
REV ISSUE PURPOSE PREPARED CHECKED APPROVED AUTHORISED
ISSUED

PRAJ INDUSTRIES LTD.


DESIGN DATA 2

N11 1

3 3
3
3

LL3 LL4

N2
3 2

N6 3
3 MIDDLE SHELL
3 NOZZLE ORIENTATION PLAN
ENGINEERED AND MANUFACTURED BY

PRAJ INDUSTRIES LIMITED


"PRAJ TOWER'', Bhumkar Chowk-Hinjewadi Road,

NP N4
Hinjewadi, Pune - 411 057. (INDIA)
www.praj.net

EQUIPMENT NAME FORCED CIRCULATION EVP. FOR EFFECT-I

EL1 EL2
PROJECT NO. W-16003 EQPT. I.D. NO. E-7507
SHELL TUBE/JACKET
DESIGN PRESSURE -- -- bar (g)
DESIGN TEMP. -- -- °C
YEAR BUILT --

3
N3

TR3 TR4

NOZZLE SCHEDULE
NOZZLE SIZE SCH./ ASME B16.5 PROJ. NOZZ. R/F.PAD
NO. NPS THK.(mm) FROM CL LOCATION OD x THK. SERVICE REMARK
TYPE (FACING) RATING

2
2
3 2

SR1 BOTTOM BONNET 2


3 NOZZLE ORIENTATION PLAN 1

MATERIAL OF CONSTRUCTION
COMPONENTS MATERIALS 2 2
SHELL SIDE TUBE SIDE

3 3

3 3

3
TR1 TR2
N7
3 N8 N9
TOP BONNET
SG 3 NOZZLE ORIENTATION PLAN
N5

LL2 LL1
TOLERANCE 2

N1

3
LEGEND 2

N10

2 ELEVATION

3 TUBESHEET LAYOUT

You might also like