Deploy the Experts to Ensure a Successful Installation & Mounting Installation and Operation Installation is customized to your needs. Beyond the basic installation of positioning and mounting the CradlePoint understands how important and critical a CradlePoint solution, our FSEs can create a customized successful roll out plan is to your business. CradlePoint quote for installations that includes additional customer- has over 8,000 world class Field Service Engineers specific hardware. We have installation experience (FSEs) across North America and the Caribbean ready beyond CradlePoint products that include POS systems to deploy to any site. Our FSEs are highly trained, and equipment, all major network vendors, and many specializing on product specific applications and are other unique hardware platforms. highly experienced on point of sale (POS) installations and high-profile, customer-facing locations. Cabling & Antennas For optimal signal strength, sometimes external wiring is Features include: needed to optimize 3G/4G and WiFi. A major benefit of Installation Statement of Work (SOW) purchasing a CradleCare Site Survey is knowing ahead of time what is needed for a successful installation. Installation, mounting of CradlePoint equipment Short cable runs of up to 10 feet are included in the cost Installation of customer specific equipment of the installation. However, longer cable runs may Cabling and mounting of antennas require an additional charge.
Extended wiring Extended Wiring with External Antennas
When extended wiring and possible building penetration Configuration of all equipment are required, we have the capability of arranging for lifts Operational testing and equipment for outside installation according to local code. This type of installation is quoted separately. Reporting Configuration WiPipe Central, our remote management platform is used AGREEMENT DETAILS to configure change management. This tool can be used directly by the customer or, with authorization, Installation Statement of Work CradlePoint engineers. Either way, your equipment will CradlePoint project coordinators work with enterprise be configured correctly and you remain in control. companies, system integrators and partners to develop Ancillary equipment can be configured on a per a SOW to identify each step needed for a successful application basis subject to the SOW. installation. Detailed diagrams, configurations, and testing criteria are all documented, signed, and Operational Testing approved. Before the FSE leaves the site, all operational testing outlined in the SOW will be executed. Acceptance and Any out-of-scope work is documented by the FSE and sign off by the appropriate customer representative is transmitted immediately to a CradlePoint project acquired prior to CradlePoint leaving the premises. manager who gains approval or denial of the work based on real-time events. Reporting Customizable reporting available based on customer’s specific test and acceptance procedures. Photos and test results are archived for future reference.