SLENG-CSG Rate Breakdown For Option 2
SLENG-CSG Rate Breakdown For Option 2
Mobilization &
Demobilization of Plants &
3 Equipment Including 45 Ton Item 1.00 450,000.00 450,000.00
Crane from Site to Site for
Sheet Piles Driving Work
* 45 Ton Crane
* 300 kv Generator
* Vibro Hammer
* Panel Board
* Welding Plant
* Gas, Oxy Acetylene Bottle
* Gas Cutter Set