Professional Documents
Culture Documents
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
1
160
### mm
Internal Skin
3600
3100
4
3
50 mm Insulation(Extruded)
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
→
→
→
-2.16
2.16
→
→
kN/m2
→
→
→
1.20
→
3.600
1.94
→
wl =
→
→
→
→
2.16
→
→
→
(Shear,kN/m) Moment,kN-m/m)
a.) Design Data:
Panel width,w = 1000 mm Concrete,f'c = 32.00 Mpa
P1
Panel Height, = 3600 mm Steel, fy = 460.00 Mpa
Int Panel Thic = 130 mm ø = 0.65
Panel thick = ### mm
Length Factor, k = 1.00 Section Properties:
Es = 200000 Mpa Ag = 130000 mm2
P2
Ec = 30406 Mpa Ig = 1.831E+08 mm4
n =Es/Ec = 6.00 lu = 3600 mm
Load Width = 1.00 m k = 1.00
r = 37.53 mm
Load Width = 4.00 m
Summary of Loading:
DL LL ecc,e MDL MLL MWL
Mark
kN/m kN/m mm kN-m/m kN-m/m kN-m/m
P1 = 55.24 12.00 0.00 0.00 0.00 0.00
P2 = 45.56 12.00 60.00 2.73 0.72 0.00
P3 = 20.00 0.00 0.00 0.00 0.00 1.94
TOTAL 120.80 24.00 2.73 0.72 1.94 70 20 160
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Design Load:
Pu = 183.36 kN
dMu = 5.97 kN-m
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
e Pn
Design Data:
Wall Width = 1000 mm
70 50 130 Concrete, f'c = 32.00 Mpa
Reinforcing Steel,fy = 460.00 Mpa
Es = 200000 Mpa
Cs' = -167.86 kN
90.0 C = -2813.66 kN
T = 115.61 kN
cb = 121.698
Pn + T = C + Cs'
ec = 0.003 Pn = -2865.91 kN
es es' = 0.0023 Mn = -231.69 kN-m
86.70
Strength Reduction Factor
a=0.85cb = 103.443 f = 0.65 ACI-318-05 9.3.2.2b
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Ds =
48 Ec Ie L = 3600 mm
Ec = 30406 Mpa
M1 or MT Ps = 144.80 kN
M =
5 Ps L2 M1 = 8.873 kN-m
1-
48 Ec Ie
M1 or MT
M =
M1 = MT + Ps D 5 Ps L2
1- Ds
48 Ec Ie
L
MT = 5.3976 kN-m(Due to External Load)
Ps = 144.80 kN(Total Service Load) M = 9.196 kN-m
Ds = L/150 (Assume) 5 M L2
Ds =
= 0.02400 m 48 Ec Ie
PsDs = 3.47514 kN-m
Ds = 2.2300 mm
M1 = 5.398 + 3.475
Ps
M1 = 8.873 kN-m GOVERN Allowable Deflection
MT = 5.398 kN-m Dallow = L/150
Dallow = 24.00 mm > 2.2300 mm
fr Ig Ok
Mcr =
yt
fr = 0.62*(f'c)-0.5
fr = 3.50725 Mpa
Ig = 1.831E+08 mm4
yt = 125.00 mm
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
180
k = 1.50 - lu/b (CPCI FIG. 3.8.5)
b = 3000 mm Panel Width
lu/b = 1.200
k = 0.30
Summary of Loading:
DL LL ecc,e MDL MLL MWL
Mark
kN/m kN/m mm kN-m/m kN-m/m kN-m/m
P1 = 81.20 24.00 0.00 0.00 0.00 0.00
P2 = 91.12 24.00 0.00 0.00 0.00 0.00
P3= 18.00 0 0.00 0.00 0.00 0.00
TOTAL 190.32 48.00 0.00 0.00 0.00
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Pn Design Data:
e
Column Width = 1000 mm
Concrete, f'c = 32.00 Mpa
Reinforcing Steel,fy = 460.00 Mpa
Es = 200000 Mpa
5+ 5 T 10
Asc = 392.70 Vertical Reinforcement
AsT = 392.70 Asv = 0.001 Ag
Asv = 180 mm2
Provide: 10 T 10
T 8 200 AST = 785.40 mm2 > 180 mm2
Horizonral Bar
10 0
35 35 es = fy/Es
180 460.00
es = = 0.0023
200000
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
b = 2500.00 mm
lu = 3200.00 mm
150 k = 1-0.423[(lu/b)-1]
k = 0.880
Summary of Loading:
DL LL ecc,e MDL MLL MWL P1
Mark
kN/m kN/m mm kN-m/m kN-m/m kN-m/m
P1 = 38.58 6.53 0.00 0.00 0.00 0.00
P2 = 42.89 8.70 25.00 1.07 0.22 0.00 P2
P3 = 12.00 0.00 0.00 0.00 0.00 0.00
TOTAL 93.47 15.23 1.07 0.22 0.00
P3
100
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Design Load:
Pu = 136.52 kN
dMu = 3.33 kN-m
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Pn
e Design Data:
Panel assume Width, = 1000 mm
Concrete, f'c = 32.00 Mpa
Reinforcing Steel,fy = 460.00 Mpa
Vertical Bars Es = 200000 Mpa
f 8 200
As = 251.33 Vertical Reinforcement
Asv = 0.001 Ag ACI 16.4.2
Horizontal bars Asv = 100 mm2
f 8 200 Provide: f 8 ###
AST = 251.327 mm2 > 100 mm2
o.k.
Horizontal Reinforcement
Asv = 0.001 Ag ACI 16.4.2
Asv = 100 mm2
Provide: f 8 ###
AST = 251.327 mm2 > 100 mm2
8 8 o.k.
42 42.0 es = fy/Es
100 460.00
es = = 0.0023
200000
cb = 30.57 C = 706.69 kN
T = 115.61 kN
es ec = 0.003
Pn + T = C
54.00 Pn = 591.08 kN
Mb = 26.62 kN-m
a=0.85cb = 25.98
Strength Reduction Factor
↑↑↑↑ 0.85f'c*a*b
↑
f = 0.65 ACI 9.3.2.2b
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
700
6T12
T8/200
2500
50mm recess
3+3
T12
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
T 10 @ ###
700
6T12
T8/200
2500
50mm recess
3+3
T12
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Design Load:
Pu = 125.60 kN
dMu = 3.54 kN-m
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
e Pn
Design Data:
Wall Width = 300 mm
Concrete, f'c = 32.00 Mpa
Reinforcing Steel,fy = 460.00 Mpa
Vertical Bars Es = 200000 Mpa
3+ 3 T 12
Asc = 339.29 Vertical Reinforcement
AsT = 339.29 Asv = 0.001 Ag
Asv = 45 mm2
Provide: 6 T 12
T8 200 AST = 339.29 mm2
678.58 mm2 > 45.00 mm2
Links Asc = 339.29 mm2
o.k.
es = fy/Es
12 0 460.00
es = = 0.0023
36 36 200000
150
es' = 0.00133 < 0.0023
fs = 265.26 Mpa
39.0
Cs' = -90.00 kN
cb = 64.5283 C = -447.57 kN
T = 156.07 kN
es ec = 0.003
es' = 0.0023 Pn + T = C + Cs'
28.53 Pn = -381.50 kN
Mn = -30.89 kN-m
a=0.85cb = 54.8491
Strength Reduction Factor
↑↑↑↑ f = 0.65 ACI-318-05 9.3.2.2b
↑
39 47.58 Column Capacity
C 0.85f'c*a*b fPn = 247.97 kN > 125.60 kN
T fMn = 20.08 kN-m > 3.54 kN-m
o.k.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
f 6mm
S.S Hanger
Bar f 6mm
S.S Lattice
Girder
FCP
→
Wu = 1.4 x WT/cos 20 →
Wu = 44.44 kN < 45.119 kN →
1.20
OK →
→
→
wl =
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
→
→
→
→ ### T8/200
0.97
1.20
→
→
→ T 10 @
→ 150
X X X X X X X X X X X X X X X X X
wl =
X X X X X X X X X X X X X X X X X
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Wall Reinforcement:
837 kN
FROOF = = 279 kN
3
Shared by Two External and Internal wall Axis A-E-J
368 kN
F1st = = 123 kN
3
Shared by 3 walls-Two External and Internal wall Axis A-E-J
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
279.00 279.00
−
−
−
−
T16 Dowel Bar −
−
122.67 −
l l − l l l
l −
−
−
4000
−
−
−
−
l l l − l l l
−
f = tan-1 (5/40) = 7
130
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
250 260
AMID = (3.24) (3.70)
= 11.99 m2
AEDGE = ATOTAL — AMID
= 16.8 - 11.99
= 4.81 m2
ATOP = (0.26) (4.20)
3240
ATOP = 1.09 m2
3740
250 mm
###
260
EXTRUDED POLYSTERENE
20 mm
Internal Face
External Face ###
70 mm
EXTRUDED POLYSTERENE
50 mm
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
a.) Fastening by use of stainless steel hangers bars and conector pins
L.Girder = 6 mm fhanger = 6 mm
Apin = 28.2743 mm2 Ahanger = 28.2743 mm2
n = 7 x 20 n = 2 x 2
n = 140 n = 4
nAgirder = 3958.41 mm2 nAhanger = 113.097 mm2
ATOTAL = nAgirder + Ahanger
ATOTAL = 4071.5 mm2
At Edges of Panel
thk(inner) + thk(outer) 0.07 + 0.16 Thermal resistance of
Rconc. = = = 0.12432 m2 K/W
lconc. 1.85 concrete at mid-Section
At Top of Panel
thk(inner) + thk(outer) 0.07 + 0 Thermal resistance of
Rconc. = = = 0.03784 m2 K/W
lconc. 1.85 concrete at mid-Section
Surface Resistance
Rintl. = 0.12 m2K/W(Inside vertical surface resistance as per D.M. list)
Rextl. = 0.044 m2K/W(Outside vertical surface resistance as per D.M. list)
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
At Edges of Panel
Redge = Rconc. + Rinsul. + Rsurf.
= 0.12 + 0.7692 + 0.88923
Redge = 1.78279 m2K/W(Total thermal resistance at edges)
At top of Panel
Redge = Rconc. + Rinsul. + Rsurf.
= 0.04 + 0.77 + 0.889
Redge = 1.6963 m2K/W(Total thermal resistance at top)
1
= 0.44332 W/m2 K
RTOTAL
RTOTAL = 2.2557 m2 K/W
U = 0.44332 W/m2 K
a = 6/m
l f = 16 W/m K
Apin+Ahang = 0.00407 m2 (Area of lattice girder & steel hanger-m2)
ATOTAL = 16.80 m2
nfAf = (Apin+Ahang)/ATOTAL = 0.00407 / 16.80 = 2.424E-10
DUf = 6/m x 16 x 2.424E-10 = 2.327E-08 W/m2 K
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
3500 ###
3800
⁰
q = 85
sinq = 0.9962 fcu = 40 Mpa (Cube Strength)
Wsinq = 59.6223 kN f'c = 32 Mpa (Cylinder Strength)
Panel L = 3800 mm
Panel H = 3500 mm f'c = 15 Mpa (Concrete Strength @ time of Stripping)
Panel T = 180 mm
Weight/L.M = 4.50 kN/m fr Ig
Mcr = (ACI 9.5.2.3-9.9)
yt
Section Properties:(Conside = 1000 mm width) 0.62*(f'c)-0.5
fr =
A = 180000 mm2 1.5 F.S
Ig = 4.860E+08 mm4 fr = 1.601 Mpa
yt = 90 mm
1.60 x 4.860E+08
Mcr =
Stresses due to selfweight: 90
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
1
160
### mm
Internal Skin
3600
3100
4
3
50 mm Insulation(Extruded)
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
→
→
→
-2.16
2.16
→
→
kN/m2
→
→
→
1.20
→
3.600
1.94
→
wl =
→
→
→
→
2.16
→
→
→
(Shear,kN/m) Moment,kN-m/m)
a.) Design Data:
Panel width,w = 1000 mm Concrete,f'c = 32.00 Mpa
P1
Panel Height, = 3600 mm Steel, fy = 460.00 Mpa
Int Panel Thic = 130 mm ø = 0.65
Panel thick = ### mm
Length Factor, k = 1.00 Section Properties:
Es = 200000 Mpa Ag = 130000 mm2
P2
Ec = 30406 Mpa Ig = 1.831E+08 mm4
n =Es/Ec = 6.00 lu = 3600 mm
Load Width = 1.00 m k = 1.00
r = 37.53 mm
Load Width = 4.00 m
Summary of Loading:
DL LL ecc,e MDL MLL MWL
Mark
kN/m kN/m mm kN-m/m kN-m/m kN-m/m
P1 = 55.24 12.00 0.00 0.00 0.00 0.00
P2 = 45.56 12.00 60.00 2.73 0.72 0.00
P3 = 20.00 0.00 0.00 0.00 0.00 1.94
TOTAL 120.80 24.00 2.73 0.72 1.94 70 20 160
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Design Load:
Pu = 183.36 kN
dMu = 5.97 kN-m
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
e Pn
Design Data:
Wall Width = 1000 mm
75 50 75 Concrete, f'c = 32.00 Mpa
Reinforcing Steel,fy = 460.00 Mpa
Es = 200000 Mpa
Cs' = -207.71 kN
64.0 C = -2146.23 kN
T = 260.12 kN
cb = 92.8302
Pn + T = C + Cs'
ec = 0.003 Pn = -2093.82 kN
es es' = 0.0023 Mn = -159.89 kN-m
56.83
Strength Reduction Factor
a=0.85cb = 78.9057 f = 0.65
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Ds =
48 Ec Ie L = 3600 mm
Ec = 30406 Mpa
M1 or MT Ps = 144.80 kN
M =
5 Ps L2 M1 = 8.873 kN-m
1-
48 Ec Ie
M1 or MT
M =
M1 = MT + Ps D 5 Ps L2
1- Ds
48 Ec Ie
L
MT = 5.3976 kN-m(Due to External Load)
Ps = 144.80 kN(Total Service Load) M = 9.196 kN-m
Ds = L/150 (Assume) 5 M L2
Ds =
= 0.02400 m 48 Ec Ie
PsDs = 3.47514 kN-m
Ds = 2.2300 mm
M1 = 5.398 + 3.475
Ps
M1 = 8.873 kN-m GOVERN Allowable Deflection
MT = 5.398 kN-m Dallow = L/150
Dallow = 24.00 mm > 2.2300 mm
fr Ig Ok
Mcr =
yt
fr = 0.62*(f'c)-0.5
fr = 3.50725 Mpa
Ig = 1.831E+08 mm4
yt = 100.00 mm
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
180
k = 1.50 - lu/b (CPCI FIG. 3.8.5)
b = 3000 mm Panel Width
lu/b = 1.200
k = 0.30
Summary of Loading:
DL LL ecc,e MDL MLL MWL
Mark
kN/m kN/m mm kN-m/m kN-m/m kN-m/m
P1 = 81.20 24.00 0.00 0.00 0.00 0.00
P2 = 91.12 24.00 0.00 0.00 0.00 0.00
P3= 18.00 0 0.00 0.00 0.00 0.00
TOTAL 190.32 48.00 0.00 0.00 0.00
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Pn Design Data:
e
Column Width = 1000 mm
Concrete, f'c = 32.00 Mpa
Reinforcing Steel,fy = 460.00 Mpa
Es = 200000 Mpa
5+ 5 T 10
Asc = 392.70 Vertical Reinforcement
AsT = 392.70 Asv = 0.001 Ag
Asv = 180 mm2
Provide: 10 T 10
T 8 200 AST = 785.40 mm2 > 180 mm2
Horizonral Bar
10 0
35 35 es = fy/Es
180 460.00
es = = 0.0023
200000
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
b = 2500.00 mm
lu = 3200.00 mm
150 k = 1-0.423[(lu/b)-1]
k = 0.880
Summary of Loading:
DL LL ecc,e MDL MLL MWL P1
Mark
kN/m kN/m mm kN-m/m kN-m/m kN-m/m
P1 = 38.58 6.53 0.00 0.00 0.00 0.00
P2 = 42.89 8.70 25.00 1.07 0.22 0.00 P2
P3 = 12.00 0.00 0.00 0.00 0.00 0.00
TOTAL 93.47 15.23 1.07 0.22 0.00
P3
100
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Design Load:
Pu = 136.52 kN
dMu = 3.33 kN-m
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Pn
e Design Data:
Panel assume Width, = 1000 mm
Concrete, f'c = 32.00 Mpa
Reinforcing Steel,fy = 460.00 Mpa
Vertical Bars Es = 200000 Mpa
f 8 200
As = 251.33 Vertical Reinforcement
Asv = 0.001 Ag ACI 16.4.2
Horizontal bars Asv = 100 mm2
f 8 200 Provide: f 8 ###
AST = 251.327 mm2 > 100 mm2
o.k.
Horizontal Reinforcement
Asv = 0.001 Ag ACI 16.4.2
Asv = 100 mm2
Provide: f 8 ###
AST = 251.327 mm2 > 100 mm2
8 8 o.k.
42 42.0 es = fy/Es
100 460.00
es = = 0.0023
200000
cb = 30.57 C = 706.69 kN
T = 115.61 kN
es ec = 0.003
Pn + T = C
54.00 Pn = 591.08 kN
Mb = 26.62 kN-m
a=0.85cb = 25.98
Strength Reduction Factor
↑↑↑↑ 0.85f'c*a*b
↑
f = 0.65 ACI 9.3.2.2b
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
700
6T12
T8/200
2500
50mm recess
3+3
T12
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
T 10 @ ###
700
6T12
T8/200
2500
50mm recess
3+3
T12
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Design Load:
Pu = 125.60 kN
dMu = 3.54 kN-m
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
e Pn
Design Data:
Wall Width = 300 mm
Concrete, f'c = 32.00 Mpa
Reinforcing Steel,fy = 460.00 Mpa
Vertical Bars Es = 200000 Mpa
3+ 3 T 12
Asc = 339.29 Vertical Reinforcement
AsT = 339.29 Asv = 0.001 Ag
Asv = 45 mm2
Provide: 6 T 12
T8 200 AST = 339.29 mm2
678.58 mm2 > 45.00 mm2
Links Asc = 339.29 mm2
o.k.
es = fy/Es
12 0 460.00
es = = 0.0023
36 36 200000
150
es' = 0.00133 < 0.0023
fs = 265.26 Mpa
39.0
Cs' = -90.00 kN
cb = 64.5283 C = -447.57 kN
T = 156.07 kN
es ec = 0.003
es' = 0.0023 Pn + T = C + Cs'
28.53 Pn = -381.50 kN
Mn = -30.89 kN-m
a=0.85cb = 54.8491
Strength Reduction Factor
↑↑↑↑ f = 0.65 ACI-318-05 9.3.2.2b
↑
39 47.58 Column Capacity
C 0.85f'c*a*b fPn = 247.97 kN > 125.60 kN
T fMn = 20.08 kN-m > 3.54 kN-m
o.k.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
f 6mm
S.S Hanger
Bar f 6mm
S.S Lattice
Girder
FCP
→
Wu = 1.4 x WT/cos 20 →
Wu = 44.44 kN < 45.119 kN →
1.20
OK →
→
→
wl =
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
→
→
→
→ ### T8/200
0.97
1.20
→
→
→ T 10 @
→ 150
X X X X X X X X X X X X X X X X X
wl =
X X X X X X X X X X X X X X X X X
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
Wall Reinforcement:
837 kN
FROOF = = 279 kN
3
Shared by Two External and Internal wall Axis A-E-J
368 kN
F1st = = 123 kN
3
Shared by 3 walls-Two External and Internal wall Axis A-E-J
Project: Project No.
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
279.00 279.00
−
−
−
−
T16 Dowel Bar −
−
122.67 −
l l − l l l
l −
−
−
4000
−
−
−
−
l l l − l l l
−
f = tan-1 (5/40) = 7
130
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
250 260
AMID = (3.24) (3.70)
= 11.99 m2
AEDGE = ATOTAL — AMID
= 16.8 - 11.99
= 4.81 m2
ATOP = (0.26) (4.20)
3240
ATOP = 1.09 m2
3740
250 mm
###
260
EXTRUDED POLYSTERENE
20 mm
Internal Face
External Face ###
70 mm
EXTRUDED POLYSTERENE
50 mm
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
a.) Fastening by use of stainless steel hangers bars and conector pins
L.Girder = 6 mm fhanger = 6 mm
Apin = 28.2743 mm2 Ahanger = 28.2743 mm2
n = 7 x 20 n = 2 x 2
n = 140 n = 4
nAgirder = 3958.41 mm2 nAhanger = 113.097 mm2
ATOTAL = nAgirder + Ahanger
ATOTAL = 4071.5 mm2
At Edges of Panel
thk(inner) + thk(outer) 0.07 + 0.16 Thermal resistance of
Rconc. = = = 0.12432 m2 K/W
lconc. 1.85 concrete at mid-Section
At Top of Panel
thk(inner) + thk(outer) 0.07 + 0 Thermal resistance of
Rconc. = = = 0.03784 m2 K/W
lconc. 1.85 concrete at mid-Section
Surface Resistance
Rintl. = 0.12 m2K/W(Inside vertical surface resistance as per D.M. list)
Rextl. = 0.044 m2K/W(Outside vertical surface resistance as per D.M. list)
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
At Edges of Panel
Redge = Rconc. + Rinsul. + Rsurf.
= 0.12 + 0.7692 + 0.88923
Redge = 1.78279 m2K/W(Total thermal resistance at edges)
At top of Panel
Redge = Rconc. + Rinsul. + Rsurf.
= 0.04 + 0.77 + 0.889
Redge = 1.6963 m2K/W(Total thermal resistance at top)
1
= 0.44332 W/m2 K
RTOTAL
RTOTAL = 2.2557 m2 K/W
U = 0.44332 W/m2 K
a = 6/m
l f = 16 W/m K
Apin+Ahang = 0.00407 m2 (Area of lattice girder & steel hanger-m2)
ATOTAL = 16.80 m2
nfAf = (Apin+Ahang)/ATOTAL = 0.00407 / 16.80 = 2.424E-10
DUf = 6/m x 16 x 2.424E-10 = 2.327E-08 W/m2 K
TOWN HOUSE
Part of Structure Page No. Rev.
Precast Super Structure 0
DUBAI PRECAST
Designed By: Date: Checked By: Date: App'd By:
Output
MT 7-Apr-15 AG 7-Apr-15 AG
Ref.
3500 ###
3800
⁰
q = 85
sinq = 0.9962 fcu = 40 Mpa (Cube Strength)
Wsinq = 59.6223 kN f'c = 32 Mpa (Cylinder Strength)
Panel L = 3800 mm
Panel H = 3500 mm f'c = 15 Mpa (Concrete Strength @ time of Stripping)
Panel T = 180 mm
Weight/L.M = 4.50 kN/m fr Ig
Mcr = (ACI 9.5.2.3-9.9)
yt
Section Properties:(Conside = 1000 mm width) 0.62*(f'c)-0.5
fr =
A = 180000 mm2 1.5 F.S
Ig = 4.860E+08 mm4 fr = 1.601 Mpa
yt = 90 mm
1.60 x 4.860E+08
Mcr =
Stresses due to selfweight: 90