Bicol University
COLLEGE OF INDUSTRIAL TECHNOLOGY
Electronics Technology Department
East Campus, Legazpi City
Terminal Report
Submitted by:
Ian A. Bonanza
Sherwin F. Atienza
Lloyd T. Llena
BSET-4B
Submitted to:
Mr. Jay-R Ballon
Professor
ACKNOWLEDGEMENT
The Student-Trainee would like to thank to those people who help and finance on
their On-the-Job Training Program, without them. The student-trainee would not finish
the program.
shared their time, efforts, and attentions in order to make this endeavor a success:
moral and financial support. Without them I can’t afford the daily living.
And most of all, to the highest of all, the ALMIGHTY GOD for guiding and
keeping me safe all the time. And leading towards the right path of their lives, for
enlightening their minds, and for hearing their prayers to accomplish the On-the-Job
Training Program. And always making them feel blessed all time.
IAN,
ACKNOWLEDGEMENT
First of all I would like to thank to my parents who supported my financial and
giving me a chance to experience to work in Manila. They are the one who sacrificed
I would like to thank to our only God who created us, I’m very thankful to you
Lord for giving me a safe trip going to Manila and also coming back here in Bicol. Thank
you Lord for your guidance, strength, peace of mind and also guiding me for all my
struggles. Thank you Lord because all your plans for me are best and for all your
Also I would like to grab this opportunity to thank my friends and classmates
because in the time of my ups and downs they’re still beside me to support me and
guiding me.
humble person in the company. Also I would like to mention my adviser Mr. Jay-r M.
Sherwin
ACKNOWLEDGEMENT
I would like to acknowledge first the company that gives me a chance to take the
On The Job Training, The FIRST OPTION ELECTRONICS SYSTEM PHIL. INC. is the
company gives and guide me to gain a lot of experience, knowledge and in the same
Especially, to Mr. Jay-R M. Ballon who was there to monitor and visit us during our
training.
moral aspects also. To give me some advise on how to face or conquer the problems
LLOYD
Table of Contents
Acknowledgment
Table of Contents
Introduction
Students Resume
Statement of Purpose
Organization of Entries
Reflection/Insight
D. Recommendation
E. Journals
F. Documentations
G. Additional Entries
Introduction
incorporate with technology. Companies need enormous manpower to operate that has
Companies offered partnership between the Academic Institution that helps the student
to explore and learn more about their course. And to the company where they can look
The Bicol University College of Industrial Technology helps the student to fully
understand what they are trying to pursue in their career by exposing to the actual field
where they can display the skills and knowledge that the institution taught them.
This partnership between the academic institution and the cooperating agency
helps the student to experience the real industrial work. In this they can learn new
In this intends to showcase what the student-trainee learned during their training
program, this is a compilation of what the student-trainee did during the training.
The content of this portfolio shows what the things we did during the training
program. And what we’ve learn from the program and what kind of skills/competencies
that we gain from it. For supporting details we’ve attached pictures that will serve as
documentation.
We also include in here the brief history of the company.
OBJECTIVE:
To obtain a position where I can maximize my skills, knowledge, time
management and teamwork.
SKILLS:
Knowledge in Electronics
Basic troubleshooting
Knowledge in Microsoft Office such as Microsoft Word, Excel, and Power point
Can work under pressure
Speaks English, Tagalog and Bicol language
PERSONAL INFORMATION:
Age : 20 years old
Birthday : October 08, 1996
Birth place : Calauag, Quezon City
Civil status : Single
Citizenship : Filipino
Religion : Roman Catholic
Father’s Name : Melecio M. Atienza
Occupation : Tricycle Driver
Mother’s Name : Leonora F. Atienza
Occupation : House Keeper
EDUCATIONAL BACKGROUND:
Tertiary:
Bicol University College of Industrial Technology
BS Electronics Technology
Em’s Barrio Legazpi City
2013-Present
Secondary:
Oro Site High School
Legazpi City
2009-2013
Primary:
Tubigan Elementary School
Biñan, Laguna
2003-2009
Training
On-The-Job training
First Option Electronics System Phils. Inc.
No. 3 Doña Juliana II Subdivisio, Brgy. Sta. Lucia, Ortigas Ext., Pasig City
501-4970/950-7545/748-1840
November 22, 2016 – February 22, 2017
REFERENCE:
______________________
Applicant
A. The Assigned Unit
IAN A. BONANZA
SYSTEM PHILS INC... In this department we don’t have office or working station, we
will be sent by the company somewhere around in manila depends on the clients
location.
In this department there are many types of work we do like Installing, Preventive
maintenance, Re-wiring and troubleshooting depends on the clients work request. Every
time there is a project, the company sent there men depend on the location of their
clients. Every project composes of two men, the “Lead man” and the “Helper”. But
depends on the project if it is in rush but normally it composed only of two men.
Lead Man is the one who’s in-charge in the project. They are the one who will mandate
what to do. They are the representative of the company. They are the one who will
report to contractors or In-charge in the site about the progress of the project.
Helper they are the one who’s going to assist or help the Lead man on the project. They
are the helping hand of the lead man to finish the project.
SHERWIN F. ATIENZA
During my OJT I am assigned in the Technical Department, we are not required to work
in office just because we are assigned in different sites based on company clients and
systems. Most of the time the senior technicians do this job. Me as an OJT I assist the
senior technicians to do the job and we follow what we order to us and if we already
know what to do our lead man allows us to do it. CCTV (Close Circuit Television
System)
LLOYD T. LLENA
The system I was handled is more on CCTV (Close Circuit Television System).
This system was hard to install because there a lot of process of installing this system
which is the Lay outing, Wirings, Mounting of Camera, Power Up, Mounting of Hard
FDAS and Smoke Detector System are used for fire security. This is the second
system that was assigned to me. This system is hard to install because there’s plenty of
wires connected, and it is more complicated than CCTV. Because the smoke detector
have a 5 wires which are the Positive In and Positive Out, Grounds, and the Bell.
B. The Duties/Tasks Assigned
IAN A. BONANZA
a technician in the First Option Electronics System Phil Inc. at Ortigas Extension, Pasig
City. Our duty is to assist or help the Lead man technician in the assigned project. In our
case we don’t have permanent project to work on because the company are letting us to
explore each work that they have assigned. The jobs that I’ve done are the following:
Installing of CCTV
Preventive Maintenance
Lay outing
Re-wiring
Each job was not that easy that I was thought, at first I expect that I will stay on the
office doing repairing and troubleshooting of the defective devices of the company. But
then when our day started me and my classmates departed in every site that we are
assigned. Luckily the staff of the company are friendly and not difficult to be with. So I’ve
learned better and gain new skills that I can use in the future.
SHERWIN F. ATIENZA
maintenance where we clean the devices, troubleshooting where we are repairing the
devices such as panel, monitor and other components, wiring where we connect the
devices from each other, installation where we install the CCTV’s, monitor and FDAS,
make a loop in this responsibility we winding a wire most of the time this component
used in traffic lights and lastly line tracing in this we find the correct wire for the specific
station.
LLOYD T. LLENA
*MAINTENANCE
*REPAIR
Troubleshoot and Repair of the Main and Sub Amplifier of the Paging system
*INSTALATION
workplace/government offices.
IAN A. BONANZA
Being part of First Option Electronics System Phils Inc. was a great experience.
We felt that we are warmed welcome to be part of their company. each staff are friendly
which you can rely on them if you have a problem. What I’ve observed inside the
company is that they are not just an organization but as a family. In terms in work you
can see the professionalism in them. They are hardworking and dedicated to their work.
What I’ve learn while I’m in the company is we must minimize tardiness and
absentees. All of can’t avoid this kind of situation, so at least we must minimize it.
Because it can affect your work, it can cause delays in your project and it may affect the
One thing that I’ve observe in the company is, too much closeness of the “Lead
Man” and the “Helper” .the man that assist the “lead man” on the project. the helper
sometimes don’t recognize whose in-charge in the project. They lost respect to each
other.
SHERWIN F. ATIENZA
The FIRST OPTION ELECTRONICS SYSTEM PHILS. INC. has a good bonding
to each other and a friendly employee. In terms of work they make sure the job is clean
and presentable. Also they make sure that the Engineer will not disappointed to
supervisor the one who make it. I learn something from one of the supervisor that if the
boss is mad at you or let say the boss tell you something that not good to your ears,
don’t quit and prove it to your boss that you have what it takes and you’re not weak.
LLOYD T. LLENA
The experience was gave on me during the training was good, meaningful and
useful. Because there's a lot of knowledge was gained, and skills was more improve
tasks/projects.
IAN A. BONANZA
Phil Inc. I’ve learn new skill that the never taught in the school. The skills that I’ve are
Installing CCTV, Traffic Light and Lay outing. Since I was a electronics students, I’ve
expecting that we are more focus on troubleshooting and repairing defective devices.
When the day started I was shock that we’ve been sent in different parts of Manila. Our
job has a mix of electrical matters. But somehow thanks to that. I’ve learn new
SHERWIN F. ATIENZA
The new development of skill that I’ve learns are the following:
Installation
Wiring
Preventive Maintenance
Troubleshooting
lay outing
3. Usefulness of other technological Courses
IAN A BONANZA
The usefulness of other technological Courses are important because not all
what we’ve learn in the school in not the same in the real industry. for example, in the
First Option Electronic System Phils Inc. where we have our On-the-job training.
We’ve expected that we are more on electronics repairing and troubleshooting. But we
SHERWIN F. ATIENZA
The other technological courses helps to the training program of the student-trainee by
means of gaining knowledge that somehow related to the course of the student-trainee.
They also acquire new skills and learned how to communicate with their co-workers that
IAN A. BONANZA
Best: what I’ve like the best part on having our training program is, having new
skills/competencies and friends. The experience that can help in the future and most of
all we have our allowances that may help us on our daily living there.
allowance and they trust us and my dislikes are traffic, long distance travel and work
D. Recommendations
*SCHOOL-Give students more and enough time to comply all the knowledge needed.
Nov.22-Dec 1, 2016
It was our first day in the company; each of us has an assigned project. And I
was at the Makati Executive Tower 4 (MET4). Our job is to install Traffic Light in the
parking lot. I’ve stay there a week before I assigned to another project.
Today I was re-assigned at the Oriental Garden Makati (OGM). Our job there is
Dec 15-28
Today i was re-assigned at The Manila Residence II (TMR II). Our job there is to
install CCTV. For the first time, I’m with my classmate Lloyd and Sherwin in the same
project. we are rarely go with each other in the same project. What we do in there is, we
work on the rising. In this we put Cable wires from 40 th floor down to 3rd floor. It takes a
week to finish it. And we also put BNC (Balun Network Connector) on each floor. But
suddenly I’ve never finish the project because of I’ve been pull out in the project and re-
Lead man was Sir Cyril. I’m with for almost two weeks. What we do in there is to re-wire
the FDAS ( Fire Detector and Alarm System) Indicators. We started from 19 th floor down
This time I’ve with sir Jhun. The site is still under construction, at first I don’t like there
because it is dusty and it doesn’t have elevator to use going up. What we do is we used
stairs going up to 28th floor. I always complaining because I can’t resist going up
everyday using on the stairs. But then, as the day pass by im getting to used to it. The
project in the North residence was to install FDAS. We wire and install the devices in
each floor.
Today I was re assigned again in another project. from north residence to Marilao
Bulacan. I was with sir Cyril. The wiring and lay outing in the site are already finished.
So what we is we just install the devices. Like the FDAS, Speaker and the Fire alarm.
SHERWIN F ATIENZA
First day of our OJT in First Option Electronics System Phil. Inc. November 21,
2016 at 9:00 AM they orient us all about their company, what security they install and
how it works. At the afternoon they said that we come back to pass a 1x1 picture as our
company ID. November 22, 2016 we went to office and accompanied by our adviser Mr.
Jay-r M. Ballon to visit us and the company. Then after we met our supervisors that we
accompanied in the site and I assigned in Makati at City Land Pasong tamo. We got in
Makati almost 11 o’clock, when we got to our site we take our lunch before we start to
work. At 1 o’clock our supervisor commanded us to clean the FDAS (Fire Detector and
Alarm System), the bell or buzzer and the MPS (Manual pull Station) using the liquid
cleaner from ground floor to 36 floor and we did it for 2 days. Then at Thursday we PM
(Preventive Maintenance) the CCTV (Close Circuit Television), we clean the lens of the
camera. All the CCTV from first floor of Residential, Commercial, outside of the building
and also at the parkinglot we. In the monitoring room we clean the monitor, FDAS panel
and the DVR (Digital Video Recorder) and we finish it till Saturday morning because in
the afternoon the supervisors need to report to their boss what they’ve done in this
week. Another week I assigned in other site which is Centrex it is located at Shaw, we
work there is lay outing installing an EMT and junction box for the wiring of the FDAS.
Another day, sir Jerry Buyan one of our supervisor told me that sir Harold one of the
We troubleshoot many disabled CCTV’s like wavy video and video lost. We
tested the power supply if there still have a supply if have not we replace it a new power
supply. Then after we troubleshoot the CCTV’s we clean it all the cameras of the
building and the DVR, then another day we continue what we did not finished.
December 8, 2016 I went to the office just to ask our manager sir Efren what was my
next destination, then he said that I accompanied to our helper at TMR Tower II which
located at Vito Cruz, Manila. Then after they get the materials then we travel to our site,
at 10:30AM we got there. After we rest a little time we started to do their work and I'll
assist them. We take our lunch at 12 o'clock then rest a little time, at 1 PM we started to
work again and I work with my co-OJT Lloyd Llena then we work and they call it knock
out we work it from 30 floor to 3rd floor. Then another day, I accompanied to my co-OJT
and supervisor to work, we made them is wiring in the 40 floor and Pent House we work
there for the whole day. In the following day I helped one of the helper and his name is
Mr. Lowie to make a hole in the wall in electrical room for ducting and to insert the wire
inside the electrical room. After that I’m with Mr. Jam-jam in the afternoon and we install
BNC in the 36 floor. Monday December 12, 2016 same venue and same assigned site,
what we do is that we install BNC in the 40 floor until 33 floor and we do that for the
whole day with Mr. Goc-ong and Mr. Jerald one of the trainee of First Option. Tuesday
we continue the installation of BNC from 33 floor until 25 floor. I’m with Mr. Goc-ong and
Mr. Ian Bonanza during the installation and we do that again for the whole day,
unfortunately we do the installation for the whole week. On the following week Monday
December 19, 2016 we have new job and that is homerun, we call it homerun because
we need to bring the coaxial in the monitoring room and it depends on how many
CCTV’s are installed. On that day we start in 40 th floor and Pent House, and we install
16 CCTV’s there and also 16 coaxial to bring down in the monitoring room. And we do
that until December month ends and by January we finish the homerun. After we finish
the homerun the next thing we do is splicing the riser and in the camera.
After that we have 220V wire and again we drop a wire from 40 th floor down to 3rd
floor and that is for the supply. In the following the CCTV’s, monitor, and DVR has been
delivers in TMR, now that there’s a camera me and Mr. John Rey, together we install
the CCTV in the parking lot. In the following week I’ve been assigned in City Net it’s
located in the Shaw Boulevard there we install CCTV, Traffic Light and Inter Com. My
first week in my new assigned site is that we drop a wire for intercom. On the following
week same site, what we do there is we organized the already homerun wire from top.
Also we do ducting, cable tree, rack and traffic light. Last February 15, 2017 I’m with Mr.
Edison one of my supervisor and he commanded me to paint the scaffolding with him
and the following day my supervisor allow me to paint the scaffolding on my own, I do it
in the rooftop because our boss told that. February 17, 2017 what we do is looping for
traffic light in City Net. The procedure for looping is that we need to wind a wire for 5
turns using TF wire and the size is 18 then the length is 1x19 feet and also 1x13 feet,
estimated looping for the whole day is 6 loop. Saturday same process and we
accomplish 7 loops. February 19, 2017 we are assigned in North Edsa near Munoz and
we assigned for just three days and I’m with Lloyd Llena, Sir Jun and Sir Paul John and
outside the perimeter we do wiring in FDAS also inside the unit. And this February 25,
2017 were going back to our province and I’m with Ian.
LLOYD T. LLENA
In November 21 my team reports in the office of FOES for the orientation. The
admin, staff, president of the company orient us of what company they have and what
duties and task will perform. In the afternoon we go back in the company to pass the
entire requirement.
Metro Manila the building is The Manila Residence Tower II. The system installed was
the CCTV or Close Circuit Television System. The task is very hard because of the long
distance site, and it is hassle to traffic. The task I handled is lay outing, wiring, installing
and troubleshooting.
The task is making a layout for the wirings of FDAS and wirings of it.
March 1 - March 5 I was assigned in Marilao Bulacan theres a lot of system that
will install in that site. FDAS, CCTV and PAGING SYSTEM, that task is dificult because