You are on page 1of 30

FusionServer Pro 1288H V5&2288H V5 Server

Acceptance Test Guide

Issue 02
Date 2022-01-19

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2022. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: https://e.huawei.com

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. i


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide About This Document

About This Document

Purpose
This document describes how to perform acceptance tests on Huawei 1288H V5
and 2288H V5 servers. The tests include basic function tests, management
function tests, and reliability tests.

Intended Audience
This document is intended for:
● Enterprise administrators
● Enterprise end users

Symbol Conventions
The symbols that may be found in this document are defined as follows.

Symbol Description

Indicates a hazard with a high level of risk which, if not


avoided, will result in death or serious injury.

Indicates a hazard with a medium level of risk which, if not


avoided, could result in death or serious injury.

Indicates a hazard with a low level of risk which, if not


avoided, could result in minor or moderate injury.

Indicates a potentially hazardous situation which, if not


avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal
injury.

Supplements the important information in the main text.


NOTE is used to address information not related to personal
injury, equipment damage, and environment deterioration.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. ii


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide About This Document

Change History
Issue Date Description

02 2022-01-19 This issue is the second official release.

01 2019-03-25 This issue is the first official release.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. iii


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide Contents

Contents

About This Document................................................................................................................ ii


1 Overview....................................................................................................................................1
1.1 Acceptance Test Criteria........................................................................................................................................................ 1
1.2 Precautions................................................................................................................................................................................ 1

2 Networking............................................................................................................................... 2
2.1 Network Diagram................................................................................................................................................................... 2
2.2 Test Environment..................................................................................................................................................................... 2
2.2.1 Hardware Configuration.................................................................................................................................................... 2
2.2.2 Software Configuration......................................................................................................................................................4

3 Test Result Conventions......................................................................................................... 5


3.1 Result Description................................................................................................................................................................... 5

4 Test Cases and Records.......................................................................................................... 6


4.1 Basic Function Test................................................................................................................................................................. 6
4.1.1 Checking Server Hardware............................................................................................................................................... 6
4.1.2 Checking Server Hardware Module Marks................................................................................................................. 7
4.1.3 Installing the Server............................................................................................................................................................ 7
4.1.4 Powering On the Server.................................................................................................................................................... 8
4.1.5 Configuring a RAID Array for Hard Disks..................................................................................................................11
4.1.6 Installing an OS.................................................................................................................................................................. 12
4.2 Management Function Test.............................................................................................................................................. 12
4.2.1 Testing Indicators...............................................................................................................................................................13
4.2.2 Testing the Fault Diagnosis LED................................................................................................................................... 13
4.2.3 Querying and Changing the iBMC IP Address......................................................................................................... 14
4.2.4 Powering On and Off the Server Remotely..............................................................................................................16
4.2.5 Querying Server Component Information................................................................................................................ 17
4.3 Reliability Test........................................................................................................................................................................ 19
4.3.1 Testing PSU Redundancy................................................................................................................................................ 19
4.3.2 Testing Fan Module Redundancy................................................................................................................................. 20
4.3.3 Testing Hard Disk Redundancy..................................................................................................................................... 20
4.4 Stability Test........................................................................................................................................................................... 21
4.4.1 Testing Long-Term Stability........................................................................................................................................... 21

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. iv


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide Contents

5 Test Results and Analysis.................................................................................................... 22


5.1 Basic Test Information......................................................................................................................................................... 22
5.2 Test Result List....................................................................................................................................................................... 22

6 Customer Suggestions and Result Confirmation...........................................................24


6.1 Customer Suggestions......................................................................................................................................................... 24
6.2 Result Confirmation............................................................................................................................................................. 24

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. v


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 1 Overview

1 Overview

1.1 Acceptance Test Criteria


1.2 Precautions

1.1 Acceptance Test Criteria


This document is developed based on major specifications and function standards
of the industry as well as on Huawei server specifications and related R&D test
standards.
After a customer receives the equipment, an acceptance team consisting of the
customer and Huawei engineers performs the acceptance tests to verify that the
equipment meets customer requirements.

1.2 Precautions
1. Before performing acceptance tests, obtain the OS installation DVD or image,
or a deployment server. Ensure that the OS is on the Huawei server
compatibility list.
To obtain the server compatibility list, use the Computing Product
Compatibility Checker.
2. All test items shall be agreed on by both parties concerned.
3. Observe related rules and criteria during the test. Because the items usually
have been tested before delivery, you can omit some items if the site
conditions are not appropriate.

NOTE

In the acceptance tests, observe the contracts and agreements between the two parties
concerned. This document serves as a reference only.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 1


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 2 Networking

2 Networking

2.1 Network Diagram


2.2 Test Environment

2.1 Network Diagram

NOTE

● The tested server is a 1288H V5 or 2288H V5 and runs a Linux OS.


● The console is a common PC or Notebook running Windows XP or Windows 7.
● The Ethernet switches are layer 2 or layer 3 switches.

2.2 Test Environment

2.2.1 Hardware Configuration


Item Description Remarks

Vendor

Device model

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 2


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 2 Networking

BIOS version (release date)

CPU Model

Quantity

Memory Model

Quantity

Maximum storage
capacity

Hard disk Model

Quantity (2.5-
inch/3.5-inch)

Firmware version

Maximum storage
capacity

RAID controller Model


card
Firmware version

Cache capacity

Battery type

Remote Model
management card
(iBMC) Firmware version

Power supply Model

Quantity

NIC Model (GE/10GE)

Quantity

PXE/NC-SI
function

Maximum
number of PCIe
slots

Specifications Type

Weight in full
configuration

Dimensions (H x
W x D)

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 3


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 2 Networking

2.2.2 Software Configuration


Name Description Quantity

IPMIitool IPMI protocol test tool 1

stress-1.0.4 Stability stress test 1


software

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 4


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 3 Test Result Conventions

3 Test Result Conventions

3.1 Result Description

3.1 Result Description


The test results in this document are defined as follows:
● PASS: The test result is the same as the expected result after the prerequisites
are met and the steps are performed.
● FAIL: The test result is not the same as the expected result after the
prerequisites are met and the steps are performed.
● NT: The test is not performed because customer requirements change or the
test environment does not meet requirements.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 5


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

4 Test Cases and Records

4.1 Basic Function Test


4.2 Management Function Test
4.3 Reliability Test
4.4 Stability Test

4.1 Basic Function Test

4.1.1 Checking Server Hardware


Case No. 4.1.1

Test Objective To verify server hardware.

Test Networking N/A


Diagram

Prerequisites The ambient temperature and humidity in the equipment


room and the altitude of the equipment room meet
server operating requirements. For details about the
requirements, see the server user guide.

Procedure 1. Unpack the server.


2. Record the server product name.
3. Open the chassis cover. Record the quantities and
models of CPUs, DIMMs, hard disks, PSUs, RAID
controller cards, and NICs.
4. Record the maximum hardware specifications,
including the maximum number of CPUs, hard disks,
and PCIe slots, maximum memory capacity, and
maximum number of internal storage devices.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 6


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Expected Results 1. You have recorded the hardware information.


2. You have recorded the maximum hardware
specifications.

Test Result

Remarks Record the server hardware information and


specifications in the table in section 2.2.1.

4.1.2 Checking Server Hardware Module Marks


Case No. 4.1.2

Test Objective To verify that the server hardware module marks are clear
and legible.

Test Networking N/A


Diagram

Prerequisites The server has been unpacked.

Procedure 1. Check whether the server hardware module marks are


clear and legible, including the silk screens of the
ports, buttons, and indicators on the front and rear
panels, and the product name and model nameplate.
2. Open the chassis cover. Check whether the internal
module layout is suitable, no main component is
covered by another one, no ventilation channel is
blocked, and the slots of CPUs, DIMMs, fan modules,
and PCIe cards are clearly marked.

Expected Results The server hardware module marks are clear and legible,
the internal module layout is suitable, no main
component is covered by another one, and no ventilation
channel is blocked.

Test Result

Remarks

4.1.3 Installing the Server


Case No. 4.1.3

Test Objective To verify that the server can be properly installed in a


standard cabinet.

Test Networking N/A


Diagram

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 7


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Prerequisites The ambient temperature and humidity in the equipment


room and the altitude of the equipment room meet server
operating requirements. For details about the
requirements, see the server installation guide.

Procedure 1. Install guide rails.


2. Lift the server (at least two persons are required), place
it on the guide rails, and slide it along the guide rails
into the cabinet.
3. Properly connect power cables from the server to the
rack based on the power distribution requirements of
the equipment room. Before connection, check whether
the server is equipped with one PSU or two PSUs in 1+1
redundancy mode.

Expected Results 1. The server is properly installed in the cabinet.


2. The power distribution in the cabinet is appropriate.

Test Result

Remarks

4.1.4 Powering On the Server


Case No. 4.1.4

Test Objective To verify that the server can be properly powered on.

Test Networking N/A


Diagram

Prerequisites The ambient temperature and humidity in the equipment


room and the altitude of the equipment room meet
server operating requirements. For details about the
requirements, see the server user guide.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 8


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Procedure 1. Power on the server, and press Delete when


information in the following screen is displayed.

2. Select Advanced and press Enter.

3. Select Socket Configuration and press Enter.

4. Select Processor Configuration and press Enter.


Record CPU 1 and CPU 2 information.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 9


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

5. Select Memory Topology and press Enter. Record


memory information.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 10


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

6. Record information such as CPU models and quantity


and DIMM vendor, quantity, and capacity displayed on
the BIOS screen. Check whether the displayed models
and quantity are the same as those recorded in section
4.1.1.
7. Press F9 to restore default settings, and then press F10
to save the settings and exit.

Expected Results The server is properly powered on and the BIOS screen is
displayed. The component information displayed on the
BIOS is the same as that recorded in section 4.1.1.

Test Result

Remarks

4.1.5 Configuring a RAID Array for Hard Disks


Case No. 4.1.5

Test Objective To verify that a RAID array can be


configured for hard disks on the server.

Test Networking Diagram N/A

Prerequisites The server is powered on.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 11


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Procedure 1. Before installing an operating


system (OS) on the server,
configure a RAID array as required.
For example, configure RAID 1 if
the server has two drives, or RAID 5
if the server has three or more
drives.
2. For details about how to configure
RAID controller cards supported by
Huawei, see the Huawei V5 Server
RAID Controller Card User Guide.
Expected Results A RAID array is successfully configured.

Test Result

Remarks

4.1.6 Installing an OS
Case No. 4.1.6

Test Objective To verity that an OS can be installed


on the server.

Test Networking Diagram N/A

Prerequisites A RAID array has been configured for


the hard disks on the server.

Procedure Install a Linux OS. For details, see the


Huawei Server OS Installation Guide.
Expected Results The OS is successfully installed.

Test Result

Remarks ● You can skip this test item if the OS


you use is on the server
compatibility list. This is because
Huawei has verified the OS
compatibility with the server.
● You can choose another OS for
verification. For details, see the
Computing Product Compatibility
Checker.

4.2 Management Function Test

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 12


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

4.2.1 Testing Indicators


Case No. 4.2.1

Test Objective To verify that the server has indicators


and the indicators function properly.

Test Networking Diagram See section 2.1 Network Diagram.

Prerequisites The server is powered on.

Procedure 1. Connect the power supply to the


server. Observe the Power indicator
on the front panel, and record its
status and color. Check whether
each PSU has indicators, and record
the status and color of each PSU
indicator.
2. Press the power button to power on
the server. Observe the Power
indicator, and record its status and
color changes. Observe the
indicators of the hard disks,
network interface cards (NICs), and
host bus adapters (HBAs), and
record their status and color
changes.
3. Remove a power cable from a PSU
to simulate a PSU hardware error.
Observe the PSU indicator, and
record its status and color changes.

Expected Results 1. The server components have status


indicators, and the status indicators
function properly.
2. The PSU indicator correctly
indicates the PSU hardware error.

Test Result

Remarks

4.2.2 Testing the Fault Diagnosis LED


Case No. 4.2.2

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 13


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Test Objective To verify that:


1. The fault diagnosis LED is available
on the front panel.
2. The fault diagnosis LED can
correctly indicate a server hardware
or system error code.

Test Networking Diagram See section 2.1 Network Diagram.

Prerequisites The server is powered on.

Procedure 1. Remove a power cable from a PSU


to simulate a PSU hardware error.
2. Log in to the iBMC WebUI, choose
Alarm and SEL > Current Alarms,
and check for PSU alarms.
3. Check whether the error code
displayed on the fault diagnosis
LED of the front panel correctly
indicates the same error as the
alarm.

Expected Results The fault diagnosis LED correctly


indicates the PSU hardware error.
● If the power cable of the left PSU is
removed, the fault diagnosis LED
displays "P01".
● If the power cable of the right PSU
is removed, the fault diagnosis LED
displays "P02".

Test Result

Remarks

4.2.3 Querying and Changing the iBMC IP Address


Case No. 4.2.3

Test Objective To verify that the iBMC IP address can be successfully


queried and changed.

Test Networking See section 2.1 Network Diagram.


Diagram

Prerequisites The server is powered on.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 14


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Procedure 1. Power on the server, and press Delete when


information in the following screen is displayed.

2. Select Advanced and press Enter.

3. Select IPMI iBMC Configuration and then press Enter.

4. Select iBMC Configuration and then press Enter.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 15


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

5. Select IPv4 IP Address and press Enter. You can query


or change the IP address for the iBMC management
network port.

6. Save the setting and exit. Note: The iBMC does not
need to be restarted for the setting to take effect.

Expected Results The server iBMC IP address is successfully queried and


changed.
The iBMC IP address can be successfully pinged from a PC
on the same network segment as the iBMC IP address.

Test Result

Remarks The default iBMC IP address is 192.168.2.100.

4.2.4 Powering On and Off the Server Remotely


Case No. 4.2.4

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 16


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Test Objective To verify that the server can be remotely powered on and
off.

Test Networking See section 2.1 Network Diagram.


Diagram

Prerequisites You have logged in to the iBMC WebUI.

Procedure 1. Log in to the iBMC WebUI.


2. Choose System > Power > Power Control. On the
displayed page, click the virtual buttons to power on or
off the server.

Expected Results The server is remotely powered on and off.

Test Result

Remarks

4.2.5 Querying Server Component Information


Case No. 4.2.5

Test Objective To verify that you can query server component


information on the iBMC WebUI.

Test Networking See section 2.1 Network Diagram.


Diagram

Prerequisites You have logged in to the iBMC WebUI.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 17


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Procedure 1. Log in to the iBMC WebUI.


2. Choose System > System Info. In the right pane, click
Processors to view the processor information
(manufacturer, model, frequency, number of cores,
and cache).

3. Choose System > System Info. In the right pane, click


Memory to view the memory information
(manufacturer, capacity, frequency, type, voltage, bit
width, and serial number).

4. Choose System > Power. In the right pane, click


Power Supply Info to view the power information
(manufacturer, rated power, and input mode).

5. Choose System > Fan and Heat Dissipation to view


the fan information (model, speed, and speed ratio)
in the right pane.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 18


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Expected Results Component information is queried successfully on the


iBMC WebUI.

Test Result

Remarks

4.3 Reliability Test

4.3.1 Testing PSU Redundancy


Case No. 4.3.1

Test Objective To verify that PSUs on the server work in redundancy


mode.

Test Networking See section 2.1 Network Diagram.


Diagram

Prerequisites ● The server is powered on.


● A Linux OS has been installed on the server.

Procedure 1. Install two PSUs on the server, and connect cables to


the PSUs.
2. Power on the server, and start the server OS.
3. Remove the power cable from one of the PSUs.

Expected Results After the power cable is removed, the server is still
operating properly.

Test Result

Remarks

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 19


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

4.3.2 Testing Fan Module Redundancy


Case No. 4.3.2

Test Objective To verify that fan modules on the server work in


redundancy mode.

Test Networking See section 2.1 Network Diagram.


Diagram

Prerequisites ● The server is powered on.


● A Linux OS has been installed on the server.

Procedure 1. Power on the server, and start the server OS.


2. Log in to the iBMC WebUI, and query the current fan
speed.
3. Remove one of the fan modules, and check whether
the OS is still running properly.
4. Log in to the iBMC WebUI, and query the current fan
speed.

Expected Results After the fan module is removed, the server OS is still
running properly and the speed of the other fan modules
increases for better cooling.

Test Result

Remarks

4.3.3 Testing Hard Disk Redundancy


Case No. 4.3.3

Test Objective To verify that hard disks on the server work in


redundancy mode.

Test Networking See section 2.1 Network Diagram.


Diagram

Prerequisites The server is powered on.

Procedure 1. Power on the server, and configure RAID 1 with two


hard disks.
2. Install an OS on the server.
3. Remove one of the hard disks, and check whether the
OS is still running properly.
4. Install a new hard disk of the same model, and check
whether RAID 1 is recovered automatically.

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 20


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 4 Test Cases and Records

Expected Results 1. After the disk is removed, the OS is still running


properly.
2. After the new hard disk of the same model is
installed, the RAID 1 group is rebuilt automatically.

Test Result

Remarks 1. The automatic recovery function of all Huawei RAID


controller cards is enabled by default only for new
hard disks.
2. If an original card is used, the automatic recovery
function can be enabled by modifying RAID controller
card configuration items.

4.4 Stability Test

4.4.1 Testing Long-Term Stability


Case No. 4.4.1

Test Objective To test the server long-term stability performance.

Test Networking See section 2.1 Network Diagram.


Diagram

Prerequisites ● The OS is operating properly.


● The GCC is properly installed.
● Non-uniform memory access (NUMA) and hyper-
threading in the BIOS are enabled.

Procedure 1. Copy the stress-1.0.4 software package to the server.


2. Go to the root directory of stress-1.0.4 and run the
following commands:
#chmod –R 755 configure
#./configure
#make install
3. Run the following command in the src directory:
./stress -c n -t 43200
n indicates the number of virtual cores of the server.
4. Check whether the OS is operating properly after the
12-hour test.

Expected Results The OS is operating properly, and no error is recorded in


the log

Test Result

Remarks

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 21


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 5 Test Results and Analysis

5 Test Results and Analysis

5.1 Basic Test Information


5.2 Test Result List

5.1 Basic Test Information


Manufacturer Huawei Technologies Co., Ltd.

Device Model

Test Location

Test Personnel

Test Date

Other Information

5.2 Test Result List


Test Type Case No. Case Name Test Result
(PASS/FAIL/NT)

Basic function test 4.1.1 Checking server


hardware

4.1.2 Checking server


hardware module
marks

4.1.3 Installing the


server

4.1.4 Powering on the


server

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 22


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 5 Test Results and Analysis

4.1.5 Configuring a
RAID array for
hard disks

4.1.6 Installing an OS

Management 4.2.1 Testing indicators


function test
4.2.2 Testing the fault
diagnosis LED

4.2.3 Querying and


changing the
iBMC IP address

4.2.4 Powering on and


off the server
remotely

4.2.5 Querying server


component
information

Reliability test 4.3.1 Testing PSU


redundancy

4.3.2 Testing fan


module
redundancy

4.3.3 Testing hard disk


redundancy

Stability test 4.4.1 Testing long-term


stability

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 23


FusionServer Pro 1288H V5&2288H V5 Server
Acceptance Test Guide 6 Customer Suggestions and Result Confirmation

6 Customer Suggestions and Result


Confirmation

6.1 Customer Suggestions


6.2 Result Confirmation

6.1 Customer Suggestions

6.2 Result Confirmation


Manufacturer: Customer:
Huawei Technologies Co., Ltd.

Huawei Test Engineer (Sign Here): Customer Test Engineer (Sign Here):

Date: Date:

Issue 02 (2022-01-19) Copyright © Huawei Technologies Co., Ltd. 24

You might also like