Professional Documents
Culture Documents
Issue 02
Date 2022-01-19
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: https://e.huawei.com
Purpose
This document describes how to perform acceptance tests on Huawei 1288H V5
and 2288H V5 servers. The tests include basic function tests, management
function tests, and reliability tests.
Intended Audience
This document is intended for:
● Enterprise administrators
● Enterprise end users
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
Change History
Issue Date Description
Contents
2 Networking............................................................................................................................... 2
2.1 Network Diagram................................................................................................................................................................... 2
2.2 Test Environment..................................................................................................................................................................... 2
2.2.1 Hardware Configuration.................................................................................................................................................... 2
2.2.2 Software Configuration......................................................................................................................................................4
1 Overview
1.2 Precautions
1. Before performing acceptance tests, obtain the OS installation DVD or image,
or a deployment server. Ensure that the OS is on the Huawei server
compatibility list.
To obtain the server compatibility list, use the Computing Product
Compatibility Checker.
2. All test items shall be agreed on by both parties concerned.
3. Observe related rules and criteria during the test. Because the items usually
have been tested before delivery, you can omit some items if the site
conditions are not appropriate.
NOTE
In the acceptance tests, observe the contracts and agreements between the two parties
concerned. This document serves as a reference only.
2 Networking
NOTE
Vendor
Device model
CPU Model
Quantity
Memory Model
Quantity
Maximum storage
capacity
Quantity (2.5-
inch/3.5-inch)
Firmware version
Maximum storage
capacity
Cache capacity
Battery type
Remote Model
management card
(iBMC) Firmware version
Quantity
Quantity
PXE/NC-SI
function
Maximum
number of PCIe
slots
Specifications Type
Weight in full
configuration
Dimensions (H x
W x D)
Test Result
Test Objective To verify that the server hardware module marks are clear
and legible.
Expected Results The server hardware module marks are clear and legible,
the internal module layout is suitable, no main
component is covered by another one, and no ventilation
channel is blocked.
Test Result
Remarks
Test Result
Remarks
Test Objective To verify that the server can be properly powered on.
Expected Results The server is properly powered on and the BIOS screen is
displayed. The component information displayed on the
BIOS is the same as that recorded in section 4.1.1.
Test Result
Remarks
Test Result
Remarks
4.1.6 Installing an OS
Case No. 4.1.6
Test Result
Test Result
Remarks
Test Result
Remarks
6. Save the setting and exit. Note: The iBMC does not
need to be restarted for the setting to take effect.
Test Result
Test Objective To verify that the server can be remotely powered on and
off.
Test Result
Remarks
Test Result
Remarks
Expected Results After the power cable is removed, the server is still
operating properly.
Test Result
Remarks
Expected Results After the fan module is removed, the server OS is still
running properly and the speed of the other fan modules
increases for better cooling.
Test Result
Remarks
Test Result
Test Result
Remarks
Device Model
Test Location
Test Personnel
Test Date
Other Information
4.1.5 Configuring a
RAID array for
hard disks
4.1.6 Installing an OS
Huawei Test Engineer (Sign Here): Customer Test Engineer (Sign Here):