Contingency Plan

Name of Production: Project: Fracture Producers Name: Ethan Rogers


ContactNumber: 10654293@student.bpc.ac.uk

Location / scene Potential problem Effect on production Control Measure Existing measures

Hardrive failure Loss of progress and Backup on external hardrive to


recover work

Computer crashes Loss of progress Save work regularly to limit the Products have auto recovery so there
amount that I could lose. is potential for no work to be lost if a
crash happens.

I could become ill. Loss of practical Take medication and rest and once
progression and possibly recovered try to catch back up to
progress relating to the amount of work missed.
theory/writing revaluate what work needs to be
prioritized.