You are on page 1of 8

COMPANY: AZBIL

DOCUMENTS: V.O
PROJECT: DATA BRIDGE CENTRES
DATE: 04/11/2022

NO PICTURES REMARKS
1.
LOCATION: LV 1-A
DATE: 13 SEPT 2022
REASON: TRUNKING
DAMAGE
2.
LOCATION: LV 1-A
DATE: 13 SEPT 2022
REASON: TRUNKING
DAMAGE
3.
LOCATION:CORRIDOR
DATE: 18 SEPT 2022
REASON:TRUNKING
DAMAGE

N PICTURES REMARKS
O
4.
LOCATION: LV 3-A
DATE: 30 SEPT 2022
REASON: TRUNKING
DAMAGE AND NEED
TO ADJUST.

5.
LOCATION:BATTERY
ROOM 3-A
DATE: 4 OKT 2022
REASON:TRUNKING
DAMAGE
6.
LOCATION:BATTERY
ROOM 3-A
DATE: 4 OKT 2022
REASON:TRUNKING
DAMAGE

7. LOCATION: LV 1A
DATE: 05 OKT 2022
REASON: TRUNKING
DAMAGE.

8.
LOCATION: HT 1B,
HT 2B
DATE: 12 OKT 2022
REASON: CONDUIT
NEED TO REDO AND
BLOCK BY AIR DUCT.

N PICTURES REMARKS
O
9.
LOCATION: LV 1B
DATE: 12 OKT
2022
REASON:
CONDUIT REPAIR.

10.
LOCATION:
BATTERY ROOM
1A
DATE: 13 OKT
2022
REASON: 90%
TRUNKING NEED
TO REPLACE.

11. LOCATION: LV 1B
DATE: 17 OKT
2022
REASON:
CONDUIT
DAMAGE.
12.
LOCATION: LV 1-A
DATE: 18 OKT
2022
REASON:
CONDUIT
DAMAGE.

13. LOCATION: LV 4B
DATE: 19 OKT
2022
REASON:
TRUNKING REDO.
14.
LOCATION:HT 2B
DATE: 27 OKT
2022
REASON:CONDUIT
MISSING

15. LOCATION: LV
ROOM 1-A
DATE: 31 OKT
2022
REASON:
TRUNKING
DAMAGE

16.
LOCATION:
BATTERY ROOM
3A
DATE: 11 NOV
2022
REASON: 50%
NEED TO REPAIR
TRUNKING AND
REJOINT.
17. LOCATION: LV 3-A
DATE: 11 NOV
2022
REASON:
TRUNKING
DAMAGE AND
NEED TO REPAIR.

You might also like