JUMLAH

JUMLAH JUMLAH DOKUMEN JUMLAH DOKUMEN JUMLAH JUMLAH REVIEWED DURATION FOR
NO. DRAWING NUMBER DRAWING TITLE DOKUMEN DRAWING STATUS PLANNING DATE SUBMISSION DATE REVIEWED DATE PLNE COMMENT
DOKUMEN NEN EN DOKUMEN RFC DOKUMEN FI STATUS REVIEW (DAYS)
WFC

GENERAL

1 CONTRACT PROJECT BETWEEN OWNER AND CONTRACTOR 1 1

EM

DOKUMEN ELECTRICAL 11 0 0 0 0 0

E.0 LAIN-LAIN

1 MATERIAL SCHEDULE 1 FOR APPROVAL 1

2 SAGGING SCHEDULE AND CALCULATION 1 FOR APPROVAL 1

3 DRUM SCHEDULE

3.A ACSR/AS 1 FOR APPROVAL 1

3.B OPGW 1 FOR APPROVAL 1

3.C AS 1 FOR APPROVAL 1

E.1 TPG

1 Technical Particular and Guarantee of ACSR/AS 250 1 FOR APPROVAL 1

2 Technical Particular and Guarantee of Aluminium-Clad Steel (AS 70 mm 2) 1 FOR APPROVAL 1

3 Technical Particular and Guarantee of Optical Ground Wire (OPGW 70 mm 2) 1 FOR APPROVAL 1

4 Technical Particular and Guarantee of Insulator and Fitting Unit 1 FOR APPROVAL 1

5 Technical Particular and Guarantee of Fittings and Accessories for Conductor & Earthwire 1 FOR APPROVAL 1

6 Technical Particular and Guarantee of Galvanized Steel Wire (GSW) 55 mm2 1 FOR APPROVAL 1

GAMBAR ELEKTRIKAL 7 0 0 0 0 0

E.2 CONDUCTOR ACSR/AS

1 Drawing Conductor ACSR/AS 250 1 FOR APPROVAL 1

E.3 ALUMINIUM CLAD STEEL (AS)

1 Drawing Aluminium-Clad Steel (AS 70 mm2) 1 FOR APPROVAL 1

E.4 OPTICAL GROUND WIRE (OPGW)

1 Drawing Optical Ground Wire (OPGW) 70mm 2 1 FOR APPROVAL 1

Drawing Joint Box, Optical Termination Box, & Gantry Box for OPGW 70 mm², complete
2 1 FOR APPROVAL 1
with mounting clamp

E.5 INSULATOR

1 Drawing Insulator 1 FOR APPROVAL 1

E.6 GROUNDING

1 Drawing Typical Tower Earthing 1 FOR APPROVAL 1

E.7 FITTING AND ACCESSORIS

1 Drawing of Fittings and Accessories for Conductor and Earthwire 1 FOR APPROVAL 1

E.8 GSW 55

1 GSW 55 mm2 1 FOR APPROVAL 1

CIVIL

DOKUMEN SIPIL 10.00 0.00 0.00 0.00 0.00 0.00

C.0 LAIN - LAIN

1 Tower Schedule 1 FOR APPROVAL 1

2 Long Profile 1 FOR APPROVAL 1

3 Foundation Schedule 1 FOR APPROVAL 1

4 Soil Investigation Report 1 FOR INFORMATION 1

5 Diagonal Tapak Tower 1 FOR APPROVAL 1

C.1 TPG

1 Technical Particular and Guarantee Steel Structure 1 FOR APPROVAL 1

C.2 CALCULATION SHEET

1 Calculation Sheet of Transmission Tower 1 FOR APPROVAL 3

2 Calculation Sheet of Transmission Tower (Leg Extension) 1 FOR APPROVAL 3

3 Retaining Wall 1 FOR APPROVAL 3

2 Calculation Sheet of foundation 1 FOR APPROVAL 3

GAMBAR SIPIL 6.00 0.00 0.00 0.00 0.00 0.00

DRAWING TOWER AND


C.3 11
FOUNDATION

1 Drawing Tower Foundation 1 FOR APPROVAL 1

2 Deawing Transmission Tower 1 FOR APPROVAL 2

3 Drawing of Leg Extension Tower 1 FOR APPROVAL 1

C.8 STEEL TOWER ACCESSORIS 1

1 Drawing Anti Climbing 1 FOR APPROVAL 1

2 Drawing Name Plate & Danger Plate 1 FOR APPROVAL

C.9 STUB PONDASI

1 DRAWING SETTING STUB TOWER 1 FOR APPROVAL 1