A) Status: Level lI
B) Moored Starboard side to Pier 13, South Harbor, Manila
C) Personnel:
D) Machinery status: All machineries are operational, except SSDG no.3 - on going
repair.
• LCU no. 1 and RHIB no. 1- On-going repair.
• LCU no. 2 and RHIB no. 2- Operational
E) Significant Activities:
• Servicing and painting of vent/ exhaust blower motor of LCU nr 1 and LCU nr 2 – 65% in
progress.
• Re-installation of cooling sea water pipings of port and starboard MPDE and SSDG nr 1
and SSDG nr 2 of LCU nr 1 – 68% in progress.
• Welding of cooling sea water plunge pipe of chiller nr 2 – completed.
• Cleaning and painting of wiring cabinet at wheelhouse of LCU nr 1 and LCU nr 2 –
completed.
• Cleaning of sea chest at auxiliary room and engine room – completed.
• Cleaning and servicing of port and starboard stern tube strainer – completed.
• Changed oil, replaced air cleaner, cleaned basket type strainer and top dash up coolant
at SSDG nr 2.
• Conducted daily monitoring of body temperature and blood pressure of personnel
aboard ship and observed COVID19 precautionary measures.
• Conducted disinfection of contact spaces.
• Observed Blue Alert status and ECQ ICOW Declaration of State of Public Health
Emergency.
• Maintained cleanliness and tight security measures aboard ship.
F) CMAV activities:
• OVERALL PROGRESS of CMAV - 88%
H) Weather: Cloudy skies with scattered rain showers, NE’ly winds prevailing from 1-3
knots, sea calm and visibility poor.