A) Status: Level lI
B) Moored Starboard side to Pier 13, South Harbor, Manila
C) Personnel:
D) Machinery status: All machineries are operational, except SSDG no.3 - on going
repair.
• LCU no. 1 and RHIB no. 1- On-going repair.
• LCU no. 2 and RHIB no. 2- Operational
E) Significant Activities:
• Continue declogging of SW cooling pipe of port and stbd MPDE and SSDG nr 1 and
SSDG NR 2 of LCU nr 1 – 65% in progress.
• Removal of asbestos cover of exhaust pipe at SSDG nr 1 – completed.
• Conducted field day
• Observed Sunday routine in port
• Conducted daily monitoring of body temperature and blood pressure of personnel
aboard ship and observed COVID19 precautionary measures.
• Conducted disinfection of contact spaces.
• Observed Blue Alert status and ECQ ICOW Declaration of State of Public Health
Emergency.
• Maintained cleanliness and tight security measures aboard ship.
F) CMAV activities:
• OVERALL PROGRESS of CMAV - 88%
H) Weather: Cloudy skies with scattered rain showers, NE’ly winds prevailing from 1-3
knots, sea calm and visibility poor.