This document lists 35 activities related to maintenance and operations at a campus. Key points include starting an internship program; sending an MOU draft and SOPs; discussing repairs to residential quarters; sanctioning new caretaker, housekeeping, plumber, electrician and nurse positions; setting up a nursing station; supplying paper bags and cloth; starting work on a temple shed; assigning staff to clean areas; planning electrical and gas line changes; scheduling repairs to toilets and infrastructure; demolishing blind spots; executing plans; spraying for snakes; following staff holiday and COVID protocols; sanctioning camera and lighting installations; needing staff for a animal shelter; and supervising night activities.
This document lists 35 activities related to maintenance and operations at a campus. Key points include starting an internship program; sending an MOU draft and SOPs; discussing repairs to residential quarters; sanctioning new caretaker, housekeeping, plumber, electrician and nurse positions; setting up a nursing station; supplying paper bags and cloth; starting work on a temple shed; assigning staff to clean areas; planning electrical and gas line changes; scheduling repairs to toilets and infrastructure; demolishing blind spots; executing plans; spraying for snakes; following staff holiday and COVID protocols; sanctioning camera and lighting installations; needing staff for a animal shelter; and supervising night activities.
This document lists 35 activities related to maintenance and operations at a campus. Key points include starting an internship program; sending an MOU draft and SOPs; discussing repairs to residential quarters; sanctioning new caretaker, housekeeping, plumber, electrician and nurse positions; setting up a nursing station; supplying paper bags and cloth; starting work on a temple shed; assigning staff to clean areas; planning electrical and gas line changes; scheduling repairs to toilets and infrastructure; demolishing blind spots; executing plans; spraying for snakes; following staff holiday and COVID protocols; sanctioning camera and lighting installations; needing staff for a animal shelter; and supervising night activities.
Internship program started for RGI students 1 2 MOU Draft sent 3 kitchen Sop sent 4 Discussion with Sheela ji on Repairs of Residential quarters 5 Campus cleaning yet to be finished because of lack of man power. 6 3 new care takers posts sanctioned 7 3 more housekeeping staff sanctioned 8 Plumber and electrician sanctioned 9 2 nurses sanctioned 10 Nursing station being set up according to earlier plan . 11 Spoken with kshetropasana people for sewage cleaning near laundry 12 Paper bags supplied to Mylapore kitchen 13 Paper bags and white cloth supplied to central office 14 Pillayar temple shed work started 15 Madam has asked Ramesh to clear the materials given by Trimed 16 Ramesh will be responsible for cleaning the entire stretch of the campus behind the kitchen once a month 17 The electrical circuit box and the gas line will be changed 18 License yet to be given from Commissioner 19 Bharath Doshi and Nikhil Doshi had visited the quarters and have spoken to Mam 20 Work for repairs will be started in the last quarter’s [ toilets, plumbing, electrical } 21 All the blind spots in the campus to be demolished 22 The doshi group are executing plans according to plan 23 Snake repellent has been sprayed 24 Staff holiday is followed as per protocol 25 Covid protocol is followed 26 Cameras has been sanctioned in all rooms 27 Go-Shala needs staff 28 Complete campus lighting has been sanctioned 29 The compound wall has fall down behind the kitchen , has been told to Ranganthan 30 17 residents have gone to Holidays back on 19 th January 31 Templates designing for training program is in process 32 Residents went for sports event at kanchipuram Collectorate 33 Rajeswari has left krupa 34 Paper bag unit, Marbling, Go-Bhathi are happening 35 Night supervising activity is happening as per plan.