Professional Documents
Culture Documents
Inheckction:
A Tcacticn Tuorbi in one in which e rnaèt pòtion he pregwu
diop take plare fn ho olaling uhrcl. As o corsqucace th popêtions
mut b sich fhat the luid Glb call the unno ponngu ernpletely
Thin makes t necesoy Ihot
he ctire circanounee
chct
To stucy the Peaformance of a prancio acton bine ot IS Cm vann
diamct mizd {(ouw (mestly racial) ype The pofomane stucy xks
to plcthq of chanacteuptia Ccwes, cohtch constt
witth specc s (ndhpencnt uiable in cach Crg.
a)Torqus Specd )Outpt pow us pcd
Appurtenan (es:.
uIed by Benden qax n thu (nld nd otlit otdo l
ioebine. Dinchvge ( mnoed by ocalbated ae meto Bale lorque
rsamud oith YOpe and chum bvake cohid seed med coilha
tozbondn
Date
Signature.
Page No.
Indian Institute of Engineering Science and Technology, Shibpur
Department of..
Report on. .EasaranGs..sads...a....3A6tim..wk.ns..
Ex peimental Proce du
-first a all, e obyoue uhethr ll the joint watn tight and enh
Proof Mhen w staot the pump orth clncd gate alie. The gide Uarus
er the wbin ahould ao be in the clexd positen while strtng
the pumP obycue ohether all ha ball bectng and bush baning
in the nit e ubnicatd. Then wc
prepcly
ahe ytaatco abox Tubine and open the ceck fttd to 1he pronu
and obn the pump developa he rated huadt ohn tho pump
gugu and
dulops the sucVe head, e slooly epn ths iabine qui de Vans
until the trbine atalrs the n&mal atd sped
rotting the harnd cohee
hen the opuratten nimal wload the turbine slouol. maintaänin
th ndat prenwe gage veainy cnd gate opning at tha fixd dsincd
then tle note the foltouing aclong:
tachometur
) Speed of fhe shalf in pm y
2) Diffrwth al manomdn veaceng
3) Inut preme gauge and outlt
balance vadeng and lead on the
) Spring
(o) mcntioncd above) oc tahcn tor deffount lond
Difforcnt of reodng
n the bine and for the (nt promua gaug rcadiny
all the as,
-Q.3
35 990 3-8
0-078
4. 05 q60
-0.O7S
5. 5-5 0.5 850 -O072
74
-3-4 -0-068
8 gkg b5
-9-4 -068
Indian Institute of Engineering Science And Technology, Shibpur
Department of Mechanical Engineering
h- 0. 487
Toque
dlameter f byake drum = 0.3048m
+ O-os] 5 = O837
6000
output (ku)
Nct
load O
235S 0.237 o:3G
I/94
POw
on
Twnbi
35 G.5
Speecl
in
Oipm
B50
0.7533 |.29
T3
Torq
ue 90.5%5 -837
shet
cata
cbrevco
(4)
Hcac J.615267152
2-8
(m) 2(41721417 3.039
) 3) 4)
No