Material Unit Qty Description Delivery date

BRC (apron, base slab & 230mm wide drainage) m2 223 SEB site office (3 rolls estimated) -
Septic tank nos 1 Site office 14/12/2017
water closet nos 4 Site office toilet -
Non slip floor tile m2 5.76 SEB toilet -
PVC sheet m2 100 SEB office -
2" elbow nos 5 SEB site office -
4" gully nos 1 SEB site office -
UPVC 4" nos 4 Site office -
UPVC 2" nos 2 Site office -
Timber (1"x8"x12') pcs 30 SEB site office 14/12/2017
Timber (1"x2"x2') pcs 100 SEB site office 14/12/2017
Kitchen sink come with water tap nos 1 SEB site office -
Basin nos 1 Contractor site office -
Pipe gam tin 1 Site office -
Water tap nos 5 Site office -
Brick nos/plt 80 Site office -
Cement bag bag 30 Site office 14/12/2017 (2 bags)
Sand tonnes 3 Site office -
DCR 3/4" tonnes - - -
Apron slab m3 3.50 SEB site office
Base Slab m3 8.37 SEB site office