VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:

VT loop:

1. Check wire tightness in each terminal.


2. Check that all voltage terminal blocks are connected.
3. Inject 3-phase unbalanced voltage on VT core.
4. Disconnect the terminal block and check no voltage on the multimeter/relay.
5. Note the voltage measurement displayed on the relay.

Protection relay

Phase Injected value (V) Displayed value (V)


U1
U2
U3

Meter

Phase Injected value (V) Displayed value (V)


U1
U2
U3

ABB VEOLIA
Signature
Date