You are on page 1of 8

34.

5kV Protection Relay Test


RET620
(SAT)
VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:

General check
Relay type
Relay manufacturer
Model
Serial number
Visual check
Watchdog contact check
Healthy status LED check
Programmable LEDs check
Relay ground connection check
Disturbance record check
Event recorder check

ABB VEOLIA
Signature
Date
We reserve all right in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Page 1 of 8
Ó Copyright 2012 . All rights reserved
34.5kV Protection Relay Test
RET620
(SAT)
VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:

LED Indication

Description Status
LED01
LED02
LED03
LED04
LED05
LED06
LED07
LED08
LED09
LED10
LED11
LED12
LED13
LED14
LED15
LED16

ABB VEOLIA
Signature
Date
We reserve all right in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Page 2 of 8
Ó Copyright 2012 . All rights reserved
34.5kV Protection Relay Test
RET620
(SAT)
VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:

Binary Input
Description Status
BI01
BI02
BI03
BI04
BI05
BI06
BI07
BI08

Binary Output
Description Status
BO01
BO02
BO03
BO04
BO05
BO06
BO07
BO08
BO09
BO10
BO11
BO12
BO13
BO14
BO15
BO16

ABB VEOLIA
Signature
Date
We reserve all right in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Page 3 of 8
Ó Copyright 2012 . All rights reserved
34.5kV Protection Relay Test
RET620
(SAT)
VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:

ABB VEOLIA
Signature
Date
We reserve all right in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Page 4 of 8
Ó Copyright 2012 . All rights reserved
34.5kV Protection Relay Test
RET620
(SAT)
VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:

CT Measurement CT Ratio: /1 A

Injected secondary value Displayed primary value


Phase (A) (A)
IL1 1 ∠0
IL2 0.75 ∠ 240
IL3 0.5 ∠ 120

VT Measurement VT Ratio: 34.5kV/100V

Injected secondary value Displayed primary value


Phase (V) (kV)
U1 30 ∠0
U2 40 ∠240
U3 50 ∠120
Usync 100 ∠ 0

ABB VEOLIA
Signature
Date
We reserve all right in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Page 5 of 8
Ó Copyright 2012 . All rights reserved
34.5kV Protection Relay Test
RET620
(SAT)
VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:

Overcurrent (50/51)

Phase Pickup (A) Drop off (A) Tripping time (s)


IL1
IL2
IL3

Earth fault (50/51N)

Phase Pickup (A) Drop off (A) Tripping time (s)


IN

Overvoltage (59)

Phase Pickup (V) Drop off (V) Tripping time (s)


U12
U23
U31

Undervoltage (27)

Phase Pickup (V) Drop off (V) Tripping time (s)


U12
U23
U31

ABB VEOLIA
Signature
Date
We reserve all right in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Page 6 of 8
Ó Copyright 2012 . All rights reserved
34.5kV Protection Relay Test
RET620
(SAT)
VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:

Sync (25)

Function Threshold (V)


Dead line
Live Line
Dead Bus
Live Bus

Live Line Live Bus Condition


Voltage Difference
Sync not ok when line is out of sync Sync not ok when bus is out of sync
Vline Vline
Vbus Vbus
Vdiff Vdiff
Angle Difference
Sync not ok when line is out of sync Sync not ok when bus is out of sync
Angleline Angleline
Anglebus Anglebus
Anglediff Anglediff
Voltage Difference
Sync not ok when line is out of sync Sync not ok when bus is out of sync
Fline Fline
Fbus Fbus
Fdiff Fdiff

General Notes

………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………

ABB VEOLIA
Signature
Date
We reserve all right in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Page 7 of 8
Ó Copyright 2012 . All rights reserved
34.5kV Protection Relay Test
RET620
(SAT)
VEOLIA CENTRAL UTILITIES &
Plant / Substation: Contract no.:
WASTE VALORIZATION PLANT
Panel Ref. / Tag: Testing Date:
………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………….

ABB VEOLIA
Signature
Date
We reserve all right in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. Page 8 of 8
Ó Copyright 2012 . All rights reserved

You might also like