You are on page 1of 6

ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/39:A

TEST REPORT FOR HT TRANSFORMER Date: 01/11/2013


CUSTOMER :
PROJECT :
SHEET OF

TEST REPORT FOR HT TRANSFORMER


0
Weather Condition: Temperature: C Humidity: %

1. Designation :

2. Location :

3. Nameplate Details :
Type of Cooling ONAN
Rated Power KVA HV
Rated Voltage HV(V)
LV(V)
Rated Current HV(A)
LV(A)
Manufacturer’s name
Serial Number
Year of Manufacture
Number of Phase
Frequency
Vector Group
Min
Impedance% Nor
Max

4. Insulation Resistance Test :


DC Voltage Measured Insulation Resistance
Reference
Applied (V) 1 minutes 10 minutes PI value
HV – LV + E
5000 HV – LV
LV – HV + E

5. Magnetizing Current Test :


Normal Tap No : 5
HV Side LV Side
Voltage Applied (V) Current measured(mA) Voltage Applied (V) Current measured(mA)
RY YB BR R Y B ry yb br r y b

6. Voltage Ratio Test :

Tested by Verified by Witnessed by


ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/39:A

TEST REPORT FOR HT TRANSFORMER Date: 01/11/2013


CUSTOMER :
PROJECT :
SHEET OF

Tap Voltage Applied HV Side Voltage Measured LV Side


no RY YB BR ry yb br rn yn bn
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

7. Magnetic Balance Test :


TAP no : 5 Normal Tap
HV Side LV Side
Reference Voltage measured(V) Reference Voltage measured(V)
RY YB BR rn yn Bn
Rph- OFF rn- ON
Yph- OFF yn- ON
Bph- OFF bn - ON

8. Vector Group Test:

Shorted Terminals: 1U-2U


3-Phase supply: 1U-1V-1W

Conditions:

Tested by Verified by Witnessed by


ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/39:A

TEST REPORT FOR HT TRANSFORMER Date: 01/11/2013


CUSTOMER :
PROJECT :
SHEET OF

1) 1V2W = 1V2V
2) 1W2V > 1W2W
3) 1U1V=1U2N+1V2N
1U
2U
2N 2V

2W

1W 1V

The Transformer Vector Group is confirmed as …Dyn11…...

9. Winding Resistance Test :


HV Side :
Tap Measured Resistance (Ω)
no RY YB BR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

LV Side :
Measured Resistance (mΩ)
Tap no
rn yn bn
5

Tested by Verified by Witnessed by


ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/39:A

TEST REPORT FOR HT TRANSFORMER Date: 01/11/2013


CUSTOMER :
PROJECT :
SHEET OF

10 Short Circuit Test :

Current Measured HV
Tap Voltage Applied HV Side Current Measured LV Side
Side
no
RY YB BR R Y B r y b n
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

11. Tan Delta Test :

Tan Delta for : Bushing Customer Reference : R-Phase


Make : Rated Voltage : KV Rated Current : A
Sr no : Mode : UST-Y Temp : °C
Reference/Applied(V)
Current (mA)
Capacitance(pf)
Dissipation factor
Power(mw)
Frequency(Hz)
Interference (%)

Tan Delta for : Bushing Customer Reference : Y-Phase

Tested by Verified by Witnessed by


ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/39:A

TEST REPORT FOR HT TRANSFORMER Date: 01/11/2013


CUSTOMER :
PROJECT :
SHEET OF

Make : Rated Voltage : KV Rated Current : A


Sr no : Mode : UST-Y Temp : 34.1 °C
Reference/Applied(V) 2137 5002 10075
Current (mA) 0.158 0.371 0.742
Capacitance(pf) 264.63 264.62 264.51
Dissipation factor 0.00282 0.00278 0.00269
Power(mw) 0.948 5.190 20.14
Frequency(Hz) 44.33 44.46 44.32
Interference (%) 0.344 0.492 0.105

Tan Delta for : Bushing Customer Reference : B-Phase


Make : Rated Voltage : KV Rated Current : A
Sr no : Mode : UST-Y Temp : °C
Reference/Applied(V)
Current (mA)
Capacitance(pf)
Dissipation factor
Power(mw)
Frequency(Hz)
Interference (%)

Tan Delta for : Winding


Mode : GST - G HV - E Temp : °C
Reference/Applied(V)
Current (mA)
Capacitance(nf)
Dissipation factor
Power(mw)
Frequency(Hz)
Interference (%)

Tan Delta for : Winding

Tested by Verified by Witnessed by


ELECTRICAL SYSTEMS & ENGINEERING CENTER ABTS/ES&EC/FMT/39:A

TEST REPORT FOR HT TRANSFORMER Date: 01/11/2013


CUSTOMER :
PROJECT :
SHEET OF

Mode : GST - G HV - LV Temp : °C


Reference/Applied(V)
Current (mA)
Capacitance(nf)
Dissipation factor
Power(mw)
Frequency(Hz)
Interference (%)

Tan Delta for : Winding


Mode : GST - G LV - E Temp : °C
Reference/Applied(V)
Current (mA)
Capacitance(nf)
Dissipation factor
Power(mw)
Frequency(Hz)
Interference (%)

12. Protection and alarms:


Test the tripping of various devices and relay by actual operation
(Tripping of HV/LV breakers checked through OTI/WTI/Bucholz Relay/PRD):

Operational check Result


OLTC Operation checks
RTCC Operation checks
Protection Functional checks
OIL BDV Value (30KV min)

13. Applicable Standards


 IS 2026 : Power Transformer
14. Testing instruments :
Calibration
Instrument Type Serial no Specification Manufacture
due date

15. Remarks :

Tested by Verified by Witnessed by