(NONM) Non-Maintenance Work

R3456630
*R3456630*
Print Date: 4/5/2023
CIMERWA Instrumentation foreman plant section Resp: Adam Habarugira
Stationary or In Motion

Asset Detail: RC FF2-7 ZD012 Event: Job Start Date: 2023/04/05


Asset Imp: 2
Clinker Silo 3 (Hospital silo)
Resp Trade: Instr. / Electronic Technician
R3456630
Total Job: Duration hrs: 00:00 Downtime hrs: 00:00 Requester: Anita Uwineza Date Created: 2023/04/05
Work Priority: Status: Approved Required By: 2023/04/12
STOP Hours Capt
Check Work Performed Planned 5 Why Rework Down - OT
Sheet: time

Callout OT NT UnPlanned Failure Improvement NT


Analysis
Work Request & Reason:
Please install limit switch on clinker standby bin
Name: Signature: Date:
Problem Identified:

Corrective Action Taken:

J/X Imp ACP Task Added Detail: Interval Time (Min)


Future Preventive Actions:

Name Signature Compl date/time NT OT x1.5 OTx2

Provide Failure Analysis for Work Performed


Failed Assembly: Failure:

Failed Component: Root Cause:

Production Downtime From: Repair Type:

Production Downtime To:


Done In Not Done Comment
Progress
Requisitioned Item Required

Approved By Signature: Date:

Page: 1 of 2
(NONM) Non-Maintenance Work
R3456634
*R3456634*
Print Date: 4/5/2023
CIMERWA Instrumentation foreman plant section Resp: Adam Habarugira
Stationary or In Motion

Asset Detail: RC FF2-5 HC002 57.02 Event: Job Start Date: 2023/04/05
Asset Imp: 2
57.02, Promote grate cooler, Grate 1
Resp Trade: Instr. / Electronic Technician
R3456634
Total Job: Duration hrs: 00:00 Downtime hrs: 00:00 Requester: Anita Uwineza Date Created: 2023/04/05
Work Priority: Status: Approved Required By: 2023/04/12
STOP Hours Capt
Check Work Performed Planned 5 Why Rework Down - OT
Sheet: time

Callout OT NT UnPlanned Failure Improvement NT


Analysis
Work Request & Reason:
Please attend to check the cooler greasing pump is tripping
Name: Signature: Date:
Problem Identified:

Corrective Action Taken:

J/X Imp ACP Task Added Detail: Interval Time (Min)


Future Preventive Actions:

Name Signature Compl date/time NT OT x1.5 OTx2

Provide Failure Analysis for Work Performed


Failed Assembly: Failure:

Failed Component: Root Cause:

Production Downtime From: Repair Type:

Production Downtime To:


Done In Not Done Comment
Progress
Requisitioned Item Required

Approved By Signature: Date: