You are on page 1of 2

OFC PAR (Planned Activity Request)

Form
PAR#: Region/Ring: 1 Date/Time:20-05-2009

Requested By: Khalid Majeed Dept: OFC O&M


Contact # 0321-6325548 Email: khalid.majeed@wateen.com

Priority: Low Medium Service Affecting: Yes No


High
Backup to be taken: Yes No Approval from Wateen Planning required:
Yes No

Phase: Project Name (if any): Preventive Maintenance .

Outage Time On site Engineer


Start of work End of work
Site Node & Duration Information
Date Time Date Time
Mr. Sajid A.M.
Ahmed Pur Bahawal pur 21-05- 0200 21-05- 0800 06 hrs
03216749013
East – Liaqat Pur 2009 hrs 2009 hrs

Resources/Tests to be performed by Wateen: Yes No


Details of Tests / Resource required from Wateen:

Complete Activity Details:


System has been restored after shifting to healthy fibers . cable will be cut and
jointing will be done. Cable will be restored during this activity.
Expected Impact/Outage:
No outage expected provided that there is no other cut in same ring. Systems will switch over to protection during
activity.
Affected Sites/Nodes:
NIL

In case of Major/Critical activity, Fall back Procedure attached: Yes No

Attachments:(If Any)
MOP Command File Fall Back Procedure
SOP EP/OP Others

Evaluated By: Contact #


Email: Sign & Date:

Approved By: Contact #


Email: Sign & Date:

PAR Closure:
Closure Date/Time: Test Results: Attached Not Applicable
Implemented By: Contact #
Date/Time: Actual Outage Duration:
Email: Sign & Date:

I.1 DEFINITIONS
PAR: Planned Activity Request
EP: Engineering Plan Document
MOP: Method of Procedure
SOP: Standard Operating Procedure
OP: Operations Plan