ECN PROCEDURE

Agenda :

1. Introduction of ECN Technologies (5 mins)

2. ECN Flow (15 Minutes)

3. Way to establish the ECN System (10)

4. Open Forum (15)


ECN LEXICONS
ECR Design
Proto Part ECP
Feasibility Feasibility
MTC
Scrap ECN Technology
Note
Letter Deviation

Packaging FTR Appearance


Deviation ECN Tracker
Sign-off Approval
PTR
NPD Pilot Lot
Stock Details
Scrap
Pre-ECN Meeting Note
Supplier Inspection
Cutoff in System FTG Assessment Reports
ECN PROCEDURE Total Steps -17
ECN PROCEDURE
Step -1

ECR (Engineering Change Request) Raised

Purpose - ECR will be raised to request Design


team to change the existing design due to Field
complaints, for improvement, to optimize cost
etc identified in reason section.

Format to be used - ECR

Benefits -
Anyone can raise ECR for improvement of
product

Controlling Authority - Plant Head


(ECR will go through Plant Head to
Engineering)
ECN PROCEDURE
Step -2

Design Feasibility

Purpose - Check feasibility of ECR.


Design team will verify the suggestion in Design
software and check if change can be done or
not.

Format to be used - Technology letter if


Feasible.
or Mail of non feasibility to stake holder

Benefits - Design analysis will be done to avoid


future failures in design.

Controlling Authority - Engineering


ECN PROCEDURE
Step -3

Technology Letter for Proto Parts

Purpose - Go-ahead to SSVD for selection of


source and develop part as per updated
design.

Format to be used - Technology Letter

Benefits -
Systematic communication to SSVD for proto
development.

Controlling Authority - Engineering


ECN PROCEDURE
Step -4

Manufacturing Feasibility

Purpose - To ensure that the supplier has


adequate resources and infra to manufacture the
part.

Format to be used - Supplier Information Form/


Feasibility Report / Supplier Audit Report

Benefits -
Supplier can well develop the quality part without
failures.

Controlling Authority - SSVD


Formats details on Next Page
ECN PROCEDURE
Supplier Information Form

Benefit -
• Collect the overall details of supplier and
his business.

• His potential Customers

• Machines available

• Design and Development Facility

• Staff Information and other such details

This help us to know how reliable is the


supplier

Controlling Authority - SSVD


ECN PROCEDURE
Feasibility Report

Benefit -
• Dimension control.

• Requirement of Fixture,Tool and Gauge

• To finalize the inspection method.

• Critical Parameters to maintain Controlling Authority - SSVD


ECN PROCEDURE
Supplier Audit Report

Benefit -
• System and process detail of supplier.

• Analyse the scope of improvement at


supplier.

• Understand supplier process from incoming


till dispatch.

• Controlling Authority - SSVD


ECN PROCEDURE
Step -5

Development of Proto Part

Purpose - To manufacture initial part at


supplier end and verify if the part is as per
drawing at supplier end itself.

Format to be used - Supplier ISIR (Initial


sample Inspection report) with ballooning
drawing and MTC

Benefits -
• Quality product satisfying the dimensional
specs.
• Chemical and mechanical composition of
raw material is as per design.

Controlling Authority - SSVD


ECN PROCEDURE
Format No. : ACE/0040/QA/005

Step -6 Fitment Trial Report Rev No.


Rev Date :
0
30-Sep-22

Project Name -:

Type of Fitment Trial : Proto ECP

Proto Part Fitment Part No. Drawing Revison :

Part Name Supplier Name :

Purpose - Fitment of proto part received from


Technology / ECP Number :

Change Details :
supplier is OK
Reason of Change :

Format to be used - FTR (Fitment Trial report) FTR Details

Vehical Serial. Nos. :

Comments on Fitment

Benefits -
Comments by Quality :

• To check no problem is faced during fitment Accepted : Yes No


Name : Sign : Date :
of proto part. Comments by Production :

Accepted : Yes No

• To ensure no rework is done that would Name :


Comments by Supplier Quality Engineer :
Sign : Date :

impact later in regular production run.


Accepted : Yes No
Name : Sign : Date :
Comments by SSVD :

Controlling Authority - Plant Quality


Accepted : Yes No
Name : Sign : Date :

Plant Head Approval :


ECN PROCEDURE
Format No.: ACE/0036/QMS/005

DEVIATION REQUEST NOTE Rev.No. : 0

Step -7 Rev. Date : 12-Sep-22

Equipment : Model : Deviation Number :

Part Name : Deviation Start Date :

Major Change (FTG Required) / Minor Change Part No : Qty :

(Deviation) Vendor Name :

Number of Machines with deviated part :


Vendor Code :

Deviation End Date :

Requester Name : Requester Sign :


Reason for Deviation (Problems Statement) :

Purpose - To identify that the change is type.


Major - Fixture, Tools and Gauges
Minor - can be directed to ECN release
Deviation Detail (Process/ Product Parmaeters) :

Format to be used - Deviation Note (if minor Containment Action :

change)
Permananet Corrective Action :

Benefits - Target Date : Responsibility :

• To make sure that if the process is skipped Quality Remarks :

of pilot lot, then the information shall be HOD QA Sign

driven to major stakeholders.


Plant Head Remarks :

Plant Head Sign

Controlling Authority - Engineering


Engineering Remarks (Applicable w hen - Functional / Dimensional deviation) :

Granted Not Granted


HOD Engineering
ECN PROCEDURE
Step -8

ECP Release

Purpose - To inform the SSVD team for


development of Pilot lot at supplier end.

Format to be used - ECP

Benefits -
• Communication for SSVD to proceed to
next step.

Controlling Authority - Engineering


ECN PROCEDURE
Step -9 Format No. : ACE/0044/VD/006
Production Trial Run (PTR) of Pilot Lot Production Trial Run Rev No. : 0
Rev. Date : 30-Sep-22

Purpose - Develop a pilot lot at supplier end. Part Name Drawing Rev.

Ensure no manufacturing challenges at supplier end Part No. Production stage

during production Supplier Name Date

Availability of Tools and Fxtures :


Format to be used - PRT / Dimensional Reports / Availability of Inspection Gauges :
FTG validation / SPC (for machined parts) Supplier Capacity Mfg. Capacity

S.No Observation Responsibility Tgt Date Status


Benefits -
1
• Quality product satisfying the dimensional specs.
2
• Chemical and mechanical composition of raw
material is as per design. 3

• Awareness of supplier capabilities and 4

challenges during mass production. 5

• Supplier will have to close the observation raised 6


during PTR. 7

8
Controlling Authority - SSVD 9

10
ECN PROCEDURE
Format No. : ACE/0040/QA/005

Step -10 Fitment Trial Report Rev No.


Rev Date :
0
30-Sep-22

Project Name -:

Type of Fitment Trial : Proto ECP

Pilot Lot Fitment Part No. Drawing Revison :

Part Name Supplier Name :

Purpose - To ensure that the fitment of Pilot


Technology / ECP Number :

Change Details :
lot part received from supplier is OK
Reason of Change :

Format to be used - FTR (Fitment Trial report) FTR Details

Vehical Serial. Nos. :

Comments on Fitment

Benefits -
Comments by Quality :

• To check no problem is faced during fitment Accepted : Yes No


Name : Sign : Date :
of pilot lot part. Comments by Production :

Accepted : Yes No

• To ensure no rework is done that would Name :


Comments by Supplier Quality Engineer :
Sign : Date :

impact later in regular production run.


Accepted : Yes No
Name : Sign : Date :
Comments by SSVD :
Controlling Authority - Plant Quality
Accepted : Yes No
Name : Sign : Date :

Plant Head Approval :


ECN PROCEDURE
Step -11

Stock Details and ECN Communication

Purpose - To get the stock details at Supplier


WIP, Supplier Stores, In-house Stores and In-
house WIP and Inform Supplier About the ECN
about to release to control excess production.

Format to be used - Nil (E-Mail


Communication to be done)

Benefits -
• Avoid generation of excess inventory of old
revision material.

Controlling Authority - Plant Head


Store, SCM, SSVD, Plant Quality will submit data to
plant heads
ECN PROCEDURE
Format No. ACE/0015/VD/002

SUPPLIER PACKAGING SIGNOFF


Step -12
Rev No. 0

Rev Dt. 24-May-22

Part Name :
Part Number : Drawing Rev No. :

Packaging Sign-off
Supplier Name :

1st Level (Primary) Packaging - Image 2nd Level (Secondary) Packaging - Image

Purpose - To get a standardize packaging .

Format to be used - Packaging Sign-off

Benefits -
Length: Width: Height: Length: Width: Height:

• Part Damage during transit issue will be 3rd Level (Tertiary) Packaging - Image
Length: Width:
Size of Component
Height:

resolved. Weight/Comp =

1st Level Packaging Method Bubble paper


Quantity packed / Bubble paper 1

• Pre-painted parts touch-up will be reduced 2nd Level Packaging Method Poly bag
Quantity packed / Poly bag 20

3rd Level Packaging Method (if applicable) Plastic Crate

• RTV to supplier will be reduced Quantity packed / Plastic Crate 8

Transportation Method Road

• Rusty material issue will be resolved. Length: Width: Height:

Packaging Approval Signoff


Department Supplier Supplier Quality (ACE) Plant Stores (ACE) Plant Quality (ACE) Purchase/ SCM (ACE) Vendor Develpment (ACE)

• Controlling Authority - SSVD Name

Signature
ECN PROCEDURE
Step -13

ECN Release

Purpose - Communicate that the change is to


be implemented from now on.

Format to be used - ECN

Benefits -
• Drawing can be shared with supplier from
implementation of new revision design.

• Intimation to IT team for cutoff of old


revision part in system.

Controlling Authority - Engineering


ECN PROCEDURE
Step -14
Decision of Old Material

Purpose - The check if the material can be


used, rework and use or to be scrapped.

Format to be used - Decision based on ECN


format / BOM update

Benefits -
• Cutoff of old material in system based on
old stock identify.
• In case of Scrap decision - Plant head will be
authorised to sign scrap note. This will
avoid collection of obsolete parts in plant.
(Quarterly limit - Rs. 50,000)
• Timely decisions will help generating Space
availability for storage of material in stores.

Controlling Authority - Plant Head


ECN PROCEDURE
Step -15

IT cutoff and Global PO release

Purpose - To block entry of old revision after


identified stock is consumed and Giving go
ahead to supplier for start production of new
revision parts.

Format to be used - Global PO and Oracle


Cutoff

Benefits -
• Block entry of old revision after identified
stock is consumed.

Controlling Authority - IT and SSVD


ECN PROCEDURE
Step -16

Handover to SCM and Plant Quality

Purpose - To handover part for regular


production.

Format to be used - Supplier Development


related documents and Global PO

Benefits -
• Quality will be aware of all the details of
supplier process and challenges faced
during development. (All documents in ECN
process to be shared with Quality team)
• SCM will ensure no material shortage.

Controlling Authority - SSVD


ECN PROCEDURE
Step -17

Pre-ECN Meeting

Purpose - To track the status of ECR and Other


developments.

Format to be used - ECN Tracker

Benefits -
• Tracking of status of ECR.
• Approval of part will be based on FTR done
by Quality and Production team.
• Communication gaps during ECN release
process will be closed.
• All stake holders will be involved.

Controlling Authority - Plant Head and QMS


ECN PROCEDURE
Format No. ACE/0034/ENGG/002

ECN Tracker Rev No. 0

Rev Date 22-Aug-22

ECN Handover to
e
Rv.
Design Technology Technology Manufactuing Proto Proto Fitment Pilot Lot Pilot Lot Cutoff in Scrap / Updated Part Updated Part Global PO New ECN lot
S.No Equipment Model Part Name Part No ECR No ECR rsied ECP No. ECP Release Stocks Details ECN No. ECN Release Communicatio SCM and

d
v.
te
Feasibility letter No. letter release feasibility Development Trials Development Fitment trials System Rework Name No release received

Re
da
n to suppliers Plant Qualiy

p
n
t

U
u
Crre

1 Mobile Crane NG Fender 32423345464 A NA NA NA Tech/Hydra/023 10-Jun-22 25-Jun-22 1-Jul-22 4-Jul-22 NA NA NA NA 8-Jul-22 9-Jul-22 17-Jul-22 Fender 32423345464 B ECN/Hydra/023 23-Jul-22 29-Jul-22 29-Jul-22 02-Aug-22 04-Aug-22

2 Mobile Crane Hydra Yoke 23123243241 A ECR/Hydra/024 06-Jun-22 22-Jun-22 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

3 Mobile Crane Hydra Cradle 43435345343 A ECR/Hydra/025 23-Jun-22 28-Jun-22 Tech/Hydra/025 02-Jul-22 08-Jul-22 16-Jul-22 18-Jul-22 ECP/Hydra/025 18-Jul-22 28-Jul-22 30-Jul-22 02-Aug-22 02-Aug-22 NA Cradle 43435345343 B ECN/Hydra/025 05-Aug-22 13-Aug-22 14-Aug-22 18-Aug-22 Pending