Drilling: Process, Rig Sytems and Equipments, Xmpe Ic-3: CC: 1h Choose The Correct Answer
Drilling: Process, Rig Sytems and Equipments, Xmpe Ic-3: CC: 1h Choose The Correct Answer
1h
Choose the correct answer
1. Can support several rigs and from which development drilling and petroleum production is carried out
a. Jack-up rigs ; b. semi-submersible rigs ; c. Land rigs ; d. Platform rigs
3. The drilling line goes down from the crown block to the drill floor and attached to the Draw work is known as
a. Fast line ; b. Dead line ; c. Rotating line ; d. Drum line
7. A pair of special type of spanners is used to breakout and or to tighten the pipe connection is known as
a.Slips ; b. Elevator ; c. Tongs ; d. Hook
8. System contain a Diesel engines drive large electric generators that in turn, produce electricity that is sent through cables
to electric switches and control gears
a. Hoisting system ;b. Rotating system ; c. Power system ; d. Circulating system
9. A hole on the rig floor in which joints of drill pipe are suspended for the drill string connection .
a. Rat Hole ; b. Mouse Hole ; c. Open Hole ; d. Rat hole
12. Transmit the rotation from the Rotary table to the Kelly bushing
a) Master bushing ; b) Kelly bushing ; c) Top derive ; d) drill string
15. BOP’s ram which designed to close off the borehole when there is no drillpipe in the borehole
a.Pipe ram ; b.Shear ram ; cBlind ram ; d. Annular Preventer
16. Tank where mud pump picks up mud ready to circulate downhole
a. Slug tank ; b. Reserve tank ; c. Trip tank ; d.Suction tank
17. Solid equipment used to remove sand or sand size particles from mud (40 micron)
a. Centrifuge ; b.Desilter ; c.Degasser d.Desander ;
18. If the hydrostatic pressure of the mud in the wellbore less than the formation pressure, it will be
a. Balance ; b. Overbalance ; c. Underbalance ; d. None of the above
19. Rubber sealing designed to close and seal any shape or size conduit in the hole
a) Annular preventor b) Pipe ram c) Blind ram d) Shear ram
22. Heavy weight drill pipe different from Drill pipe in (Select all that apply)
a. Smaller inner diameter ; b. Shorter tool joint ; c. There is wear pad ; c. Larger inner diameter
23. The function of the drill collar are (Select all that apply)
a. Supply the desired weight on bit ;b. Allow the lighter drill pipe to remain in tension. ; c. Allow the lighter drill
pipe to remain in Compression ; d. Enlarge hole size
24. This is a non-magnetic drill collar used to contain the magnetic survey tools.
a. Monel ;b. Stabilizer.c. Reamerd. Bit sub
25. This is a non-straight sub with different bending angles used to drill deviated holes.
a.Jar ; b.Shock sub ;c. Bent sub ;d. Hole opener
27. Type of bit where the teeth are pressed into the cone
a. Milled tooth bit ;b. PDC ; c. Tungsten carbide Insert ; d. Diamond
28. To drilling soft formation, the cutting structure recommended to be (Select all that apply)
a) Many ; b) Long ; c) Few ; d) Sharp
1. ID2 x L (ft)/1029.4
32. The Traces which used to check the lag (Select all that apply)
1. Lentile
2. Carbide
3. Rock cutting
4. Hcl
34. The volume of fluid contained within the drill string is the
1. Hole volume
2. Annular volume
3. Pipe capacity
4. Pump out put
35. The volume of fluid in the space between the drillstring and the Borehole (Annulus)
1. Hole volume
2. Annular volume
3. Pipe capacity
4. Pump out put
36. According to the number of cylinders, the pump has two type (Select all that apply)
1. Triplex
2. Duplex
3. Single
4. None of the above
38. Lag Strokes=
1. = Annular Volume/Pump out put
2. = Annular Volume X Pump out put
3. = Annular Volume / Pump Rate
4. = Annular Volume X Pump Rate
39. Pump out put (POP) of triplex pump with a liner diameter 5”, stroke length 12” and the efficiency 93% equal
1. 0.0983 bbl/stk
2. 3.0501 bbl/stk
3. 0.9861 bbl/stk
4. 0.0677 bbl/stk