Hammer / centre punch / chisel / drift punches / impact / carbide tipped scrapers / hacksaw / crow
bar / tongs / wire brushes / files / angle grinder / electric hand drill / working floodlight / hand lamps
/ pocket torches / cable drums / dial gauges / magnetic stand / spirit level / flame cutter and welding
unit.
Screw taps (inside and outside):
Metric : M 4 – M 30
Impact ring spanner 10, 13, 17, 19, 24, 27,30,32,36 and 65 mm
Ring / fork spanners 10, 13, 17, 19, 24, 27,30,32,36 and 65 mm
Screwdriver Various sizes
Allen keys 5 – 19 mm
Torque tools:
Cleaning agents
Cleaning agents generally used in firms, steam cleaning equipment, in-house cleaning appliances.
Acetone ca. 5 litre (acetone must be available!).Cleaning cloths, brushes, buckets, scrapers,
scotch bright 3m, etc.
g:\m\mk\mks\wartungsplaene\tools_minimal.doc 1/5
Note
Cleaning agents are required in large amounts. It must be assured that cleaning
agents and cloths are always available in sufficient quantity.
Measuring instruments
Remarks
In agreement with the customer, MAAG prefer to bring measuring instruments,
calibrated and in the right size on site.
Threaded rods 2 pieces (approx. 1 m long) M 12 and 8 nuts each with washers.
Threaded rods 2 pieces (approx. 1 m long) M 16 and 8 nuts each with washers.
Threaded rods 2 pieces (approx. 1 m long) M 20 and 8 nuts each with washers.
Threaded rods 2 pieces (approx. 1 m long) M 24 and 8 nuts each with washers.
Square-section tubing (approx. 3 m long), Dimensions will be determined on dismantling and
recorded.
Remarks
The final dimensions must be determined / recorded during the overhaul.
Lifting devices
g:\m\mk\mks\wartungsplaene\tools_minimal.doc 2/5
2 pieces. 5 tons Length 6 – 8 m Must be nylon slings
2 pieces. 10 tons Length 8 – 10 m Can be steel ropes / nylon preferred
Remarks
It is strongly recommended to use slings made of polyester.
Remarks
RENK – MAAG Service Engineers only work with damage free slings (safety
reason).
Chain blocks
Remarks
Well-maintained lifting equipment guarantees a smooth operation and avoids
damage to material as well as preventing accidents.
Remarks
RENK – MAAG Service Engineers only work with damage free lifting equipment.
4 pieces each M 10 / M 12 / M 16 / M 20 /M 24 / M 30
Shackles
g:\m\mk\mks\wartungsplaene\tools_minimal.doc 3/5
Remark
RENK – MAAG Service Engineers only work with damage free lifting equipment.
And not accept, self welded eye bolts
Hydraulic jack:
Miscellaneous
2 working benches should be set up near the gear reducer. One of the working benches must be
equipped with a vice, the other one with a chest of drawers that can be locked.
For storing and sorting various screws, approx. 25 boxes are needed.
Vehicles must be available to transport individual gear reducer parts.
The RENK – MAAG Service Engineer shall have a lockable office with table and chairs.